Help System

Home
Cobra 8.4 Help System
Project Processes
Status
Forecasts
Procedures
Create a Forecast
Using the Help Search
Using the Help Search
  • Phrase:Returns all topics that contain the exact phrase in the search criteria. Use quotation marks around the phrase.
    Ex."system administration"
  • And:Returns all topics that contain all the words in the search criteria, in any combination. Insert a plus sign between all words in the search criteria.
    Ex.system + administration
  • Or:Returns all topics with any combination of words in the search criteria. This is the default.
    Ex.system administration
For more information:Searching Online Help
Table of Contents
Expand|Collapse
  • Cobra 8.4 Help System
    • Cobra Videos
    • Searching Online Help
    • Getting Started
      • Launching Cobra
        • Running Cobra with Command Line Parameters
        • Cobra Login Dialog Box
          • Display the Cobra Login Dialog Box
        • Change Password Dialog Box
          • Display the Change Password Dialog Box
        • Log Onto Cobra
        • Log Onto Cobra Using a Different User ID
        • Set Cobra to Always Run as an Administrator
        • Change Your Password
      • Explore Cobra
        • Cobra Explorer
          • Cobra Button
            • New File Dialog Box
              • Display the New File Dialog Box
              • Considerations When Creating Names in Cobra
            • Open File Dialog Box
              • Display the Open File Dialog Box
            • Save As Dialog Box (Projects)
              • Display the Save As Dialog Box (Projects)
            • Save As Dialog Box (Ancillary Files)
              • Display the Save As Dialog Box (Ancillary Files)
            • Manage
              • Backup Dialog Box
                • Display the Backup Dialog Box
              • Restore Dialog Box
                • Display the Restore Dialog Box
              • Change Ownership and Access Rights Dialog Box
                • Display the Change Ownership and Access Rights Dialog Box
                • Change Owner Dialog Box
                  • Display the Change Owner Dialog Box
                • Change Access Rights Dialog Box
                  • Display the Change Access Rights Dialog Box
            • Cobra Login Dialog Box
              • Display the Cobra Login Dialog Box
            • Change Password Dialog Box
              • Display the Change Password Dialog Box
            • Help
              • About Deltek Cobra Dialog Box
                • Display the About Deltek Cobra Dialog Box
            • Preferences
              • User Preferences
                • User Preferences Dialog Box
                  • Display the User Preferences Dialog Box
                  • Set the Date Format
              • Application Preferences
                • Configure the Application Settings
                • Application Preferences Dialog Box
                  • General Tab of the Application Preferences Dialog Box
                  • Project Codes Tab of the Application Preferences Dialog Box
                  • Notes Tab of the Application Preferences Dialog Box
                    • New Note Category Dialog Box
                    • Edit Note Category Dialog Box
                  • Spread Curves Tab of the Application Preferences Dialog Box
                    • Add Spread Curve Dialog Box
                  • Data Access Tab of the Application Preferences Dialog Box
                    • Process Lock
                  • Custom Hooks Tab of the Application Preferences Dialog Box
                  • Integration Tab of the Application Preferences Dialog Box
                  • Reports Tab of the Application Preferences Dialog Box
                  • Other Tab of the Application Preferences Dialog Box
            • Keyboard Shortcuts
          • Quick Access Toolbar
          • Processes Tab
            • Keyboard Shortcuts
          • Integration Tab
            • Keyboard Shortcuts
          • Reporting Tab
            • Keyboard Shortcuts
          • Tools Tab
            • Keyboard Shortcuts
          • Custom Menu Tab
            • Custom Menu Items
          • Cobra Views
            • Display the Cobra Explorer Panes
            • Projects
              • Projects Pane
                • Projects Pane Column Definitions
                • Shortcut Menu
                • Color Band
            • Calendars
              • Calendars Pane
                • Calendars Pane Column Definitions
                • Shortcut Menu
            • Codes
              • Codes Pane
                • Codes Pane Column Definitions
                • Shortcut Menu
            • Rates
              • Rates Pane
                • Rates Pane Column Definitions
                • Shortcut Menu
            • Resources
              • Resources Pane
                • Resources Pane Column Definitions
                • Shortcut Menu
            • Reports
              • All Reports Pane
              • Personal Reports Pane
                • Reports Pane Column Definitions
                • Shortcut Menu
              • Batch Reports Pane
                • Batch Reports Pane Column Definitions
                • Shortcut Menu
          • Keyboard Shortcuts
      • File Management
        • File Backup
          • Back Up Your Data
          • Backup Dialog Box
            • Display the Backup Dialog Box
        • File Restore
          • Restore Data from a Backup File
          • Restore Dialog Box
            • Display the Restore Dialog Box
          • Select Files to Restore Dialog Box
            • Display the Select Files to Restore Dialog Box
        • Restoring Reports and Configurations
        • Custom Project Tables
          • Identify a Custom Table
      • Process Cycle
        • Cobra Components
        • Organize Project Information
        • Set Up Projects and Project Baselines
        • Progressing
        • Reporting
        • Special-Purpose Operations
        • Take your Implementation a Step Further
      • Earned Value Management
        • DOD's Characteristics of a Successful EVMS
        • ANSI Standard for Earned Value Management Systems
    • Projects
      • Control Accounts and Work Packages
      • Classes and Cost Sets
      • Progress Techniques
      • Resource Assignments
      • Milestones/Steps
      • Notes
      • Project View
        • Display the Project View
        • Copy and Paste in the Project View
        • Edit Tab of the Project View
        • Spreadsheet Pane of the Project View
          • Shortcut Menu
          • Spreadsheet Pane Column Definitions
          • Filters
            • Standard Filter Dialog Box
              • Display the Standard Filter Dialog Box
            • Advanced Filter Dialog Box
              • Display the Advanced Filter Dialog Box
            • Procedures
              • Apply a Filter to a Column in the Spreadsheet Pane
              • Filter by Classes or Cost Sets
              • Clear the Filter
          • Using the Find Function
          • Save and Share View
            • Select Dialog Box
              • Display the Select Dialog Box
            • Save Current View As Dialog Box
              • Display the Save Current View As Dialog Box
            • Manage Views Dialog Box
              • Display the Manage View Dialog Box
            • Procedures
              • Create a View
              • Modify an Existing View
              • Manage Views
          • Dialog Boxes (Spreadsheet Pane of the Project View)
            • Add Control Account Dialog Box
              • Display the Add Control Account Dialog Box
            • Add Work Package Dialog Box
              • Display the Add Work Package Dialog Box
            • Add Resource Assignment Dialog Box
              • Display the Add Resource Assignment Dialog Box
            • Copy Control Account Dialog Box
              • Display the Copy Control Account Dialog Box
            • Copy Work Package Dialog Box
              • Display the Copy Work Package Dialog Box
            • Move Control Account Dialog Box
              • Display the Move Control Account Dialog Box
            • Move Work Package Dialog Box
              • Display the Move Work Package Dialog Box
            • Rename Control Account Dialog Box
              • Display the Rename Control Account Dialog Box
            • Rename Work Package Dialog Box
              • Display the Rename Work Package Dialog Box
            • Update EAC Dialog Box
              • Display the Update EAC Dialog Box
          • Procedures
            • Adding a New Control Account
              • Add a New Control Account using the Dialog Box
              • Add a New Control Account Manually
            • Adding a New Work Package
              • Add a New Work Package using the Dialog Box
              • Add a New Work Package Manually
            • Rename a Control Account
            • Rename a Work Package
            • Move a Control Account
            • Move a Work Package
            • Copy a Control Account
            • Copy a Work Package
            • Add a Resource Assignment
            • Save the Contents of the Spreadsheet Pane as an Excel File
            • Update EAC
        • Time-phase Pane of the Project View
          • Time-phase Pane Field Descriptions
          • Data Entry in the Time-phase Pane
        • Tabbed Pane of the Project View
          • General Tab of the Project View
            • How Cobra Uses the Early and Late Dates
            • Secure Baseline Dates
            • Budget Pending Dates
            • Resource Assignment Percent Complete Dialog Box
              • Display the Resource Assignment Percent Complete Dialog Box
          • Milestones/Steps Tab of the Project View
            • Reconcile Milestone Weight Variance Dialog Box
              • Display the Reconcile Milestone Weight Variance Dialog Box
            • Procedures
              • Add Milestones or Steps
              • Modify Milestones or Steps
              • Delete Milestones or Steps
              • Reconcile Milestone Weights
          • Codes Tab of the Project View
          • Notes Tab of the Project View
        • Time-phase Detail Pane of the Project View
          • Forecast Details Pane
          • Using Spread
          • Spread Dialog Box
            • Display the Spread Dialog Box
          • Spread Curve Dialog Box
            • Display the Spread Curve Dialog Box
          • Procedures
            • Adjust Budget Spreads Manually
            • Spread Updated Budgets for Resources
            • Spread Budgets Using Pre-defined Spread Methods
            • Reconcile Budgets and Forecasts
      • Project Properties Dialog Box
        • General Tab of the Project Properties Dialog Box
          • Procedures
            • Synchronize Status Dates
            • Modify the Project Description
            • Enter Project Dates
            • Set Reporting Options
            • Select EVMS Acceptance for a Project
        • Contract Information Tab of the Project Properties Dialog Box
          • Procedures
            • Enter Contract Information
        • Budget Tab of the Project Properties Dialog Box
          • Procedures
            • Enter Budget Information
        • Fields Tab of the Project Properties Dialog Box
          • Procedures
            • Assign Control Account and Work Package Structures to a Project
        • Files Tab of the Project Properties Dialog Box
          • Rolling Wave Dialog Box of the Project Properties Dialog Box
          • Procedures
            • Assign Ancillary Files to a Project
            • Select the Level at Which to Capture Actual Costs
            • Run the Rolling Wave Process Without Advancing the Calendar
        • Classes Tab of the Project Properties Dialog Box
          • Class Overview
          • Custom Cost Classes
          • General Tab of the Classes Tab
            • Procedures
              • Assign a Rate File to a Forecast Actual or Budget Class
              • Assign a Calendar Set to a Forecast or Budget Class
              • Assign a Budget Source to a Budget Class
              • Assign a Forecast Method to a Forecast Class
          • Included Earned Classes Tab of the Classes Tab
            • Procedures
              • Associate an Earned Value Class with a Forecast Class
          • Included Budget Classes Tab of the Classes Tab
            • Procedures
              • Associate a Budget Class with a Forecast Actual or Earned Class
          • Included Actual Classes Tab of the Classes Tab
            • Procedures
              • Associate an Actual Class with a Forecast Class
          • New Class Wizard
            • General Information Page of the New Class Wizard
            • Class Settings Page for Actuals Class of the New Class Wizard
            • Class Settings Page for Budget Class of the New Class Wizard
            • Class Settings Page for Earned Class of the New Class Wizard
            • Class Settings Page for Forecast Class of the New Class Wizard
            • Forecast Class Page of the New Class Wizard
            • Include in Budget Cost Set Page of the New Class Wizard
            • Include in Earned Cost Set Page of the New Class Wizard
            • Include in Actuals Cost Set Page of the New Class Wizard
            • Include in EAC Cost Set Page of the New Class Wizard
            • Confirmation Page of the New Class Wizard
            • Procedures
              • Display the New Class Wizard
              • Create a New Class
          • Copy Classes Dialog Box
            • Display the Copy Classes Dialog Box
        • Cost Sets Tab of the Project Properties Dialog Box
          • Copy Cost Sets Dialog Box
            • Display the Copy Cost Sets Dialog Box
          • Procedures
            • Create a New Cost Set
            • Add a Class to a Cost Set
            • Copy Existing Cost Sets to a Project
            • Delete a Cost Set
        • Code Assignments Tab of the Project Properties Dialog Box
          • Copy Project Codes Dialog Box
            • Display the Copy Project Codes Dialog Box
          • Procedures
            • Assign Codes to a Project
            • Copy Codes to Another Project
        • Sub-Projects Tab of the Project Properties Dialog Box
          • Save As Dialog Box (Merging Projects)
            • Display the Save As Dialog Box (Merging Projects)
          • Sub-Projects Validation Dialog Box
            • Sub-Projects Validation Dialog Box
          • Procedures
            • Assign Sub-Projects to a Master Project
            • Merge Sub-Projects into a New Project
            • Validate Sub-Projects
            • Remove Sub-Projects from a Master Project
        • Preferences Tab of the Project Properties Dialog Box
          • Using the Selected and Secure Checkboxes
          • Actual Costs Preferences
          • Advance Calendar Preferences
          • Analyze Preferences
          • ANSI EIA X12 Preferences
          • Integration Wizard Preferences
            • Behavior of the Options
          • Project Preferences
          • Earned Preferences
          • Forecast Preferences
          • Recalc Preferences
          • Reclass Preferences
          • Replan Preferences
          • Copy Preferences Dialog Box
            • Display the Copy Preferences Dialog Box
          • Procedures
            • Copy Project Preferences
        • Access Control Tab of the Project Properties Dialog Box
        • Open Status Tab of the Project Properties Dialog Box
        • Procedures
          • Display the Project Properties Dialog Box from an Open Project
          • Display the Project Properties Dialog Box without Opening the Project
          • Display the Project Properties Dialog Box Tabs from an Open Project File
          • Display the Project Properties Dialog Box Tabs without Opening a Project File
      • New Project Wizard
        • General Information Page of the New Project Wizard
        • Fields Page of the New Project Wizard
        • Ancillary Files Page of the New Project Wizard
        • Settings Page of the New Project Wizard
        • Project Dates Page of the New Project Wizard
        • Project Code Assignments Page of the New Project Wizard
        • Sub-Projects Page of the New Project Wizard
        • Access Control Page of the New Project Wizard
        • Confirmation Page of the New Project Wizard
        • Procedures
          • Display the New Project Wizard
          • Create a New Project
      • Project Security
        • Procedures
          • Give a User Access to a Project
          • Give a Group Access to a Project
      • Multiproject Operations (Master and Subprojects)
        • Multiproject Guidelines
        • Merging a Master Project's Subprojects to Create a New Project
        • Procedures
          • Create a Master Project
          • Assign Sub-Projects to a Master Project
          • Remove Sub-Projects from a Master Project
          • Merge Sub-Projects into a New Project
          • Validate Sub-Projects
      • Standard Dialog Boxes and Procedures
        • New File Dialog Box
          • Display the New File Dialog Box
          • Considerations When Creating Names in Cobra
        • Open File Dialog Box
          • Display the Open File Dialog Box
        • Lookup Dialog Box
          • Display the Lookup Dialog Box
        • Save As Dialog Box (Projects)
          • Display the Save As Dialog Box (Projects)
        • Save As Dialog Box (Ancillary Files)
          • Display the Save As Dialog Box (Ancillary Files)
        • Find Dialog Box
          • Display the Find Dialog Box
        • Insert Column Dialog Box
          • Display the Insert Column Dialog Box
        • Edit Column Dialog Box
          • Display the Edit Column Dialog Box
        • Column Width Dialog Box
          • Display the Column Width Dialog Box
        • Rename Dialog Box
          • Display the Rename Dialog Box
        • Purge Dialog Box
          • Display the Purge Dialog Box
      • Basic Procedures
        • Save a Project as a Different Project
        • Save an Ancillary File as a Different File
        • Copy the Projects Pane or the Spreadsheet Pane to Excel
        • Find Text
        • Find Numeric Data
        • Manage Columns
        • Insert a Column in a View
        • Edit a Column in a View
        • Remove a Column from a View
        • Adjust Column Width
        • Size a Column for Best Fit
        • Purge a Project
        • Rename a Project
        • Rename an Ancillary File
        • Freeze Columns in a View
    • Calendars
      • Calendar Periods
      • Calendar Sets
      • Configure Calendar Set 19 for IPMR Reports, wInsight Integration, and Cost Data Export/DCDE Format
      • Calendar View
        • Edit Tab of the Calendar View
        • Shortcut Menu
        • Procedures
          • Display the Calendar View using the Calendars Group Bar
          • Display the Calendar View using the Cobra Button
        • Calendar Periods Tab of the Calendar View
          • Generate Periods Dialog Box
            • Display the Generate Periods Dialog Box
          • Calculate Hours Dialog Box
            • Display the Calculate Hours Dialog Box
          • Procedures
            • Generate Calendar Periods
            • Add Calendar Periods
            • Delete Calendar Periods
            • Add Holidays to a Calendar
            • Delete an Existing Holiday from the Calendar
            • Calculate Hours for a Calendar
        • Calendar Sets Tab of the Calendar View
          • Add Calendar Set Dialog Box
            • Display the Add Calendar Set Dialog Box
          • Edit Calendar Set Dialog Box
            • Display the Edit Calendar Set Dialog Box
          • Flag Periods Dialog Box
            • Display the Flag Periods Dialog Box
          • Procedures
            • Add Calendar Sets
            • Set the TODATE Period
            • Extend the Calendar Periods
            • Flag Periods
            • Edit Calendar Sets
            • Delete Calendar Sets
      • New Calendar File Wizard
        • General Information Page of the New Calendar File Wizard
        • Periods Page of the New Calendar File Wizard
        • Productive Hours Page of the New Calendar File Wizard
        • Period Labels Page of the New Calendar File Wizard
        • Access Control Page of the New Calendar File Wizard
        • Confirmation Page of the New Calendar File Wizard
        • Procedures New Calendar Wizard
          • Create a New Calendar
          • Display the New Calendar File Wizard
      • Calendar File Properties Dialog Box
        • Procedures Calendar File Properties Dialog Box
          • Display the Calendar File Properties Dialog Box Tabs without Opening a Calendar File
          • Display the Calendar File Properties Dialog Box Tabs from an Open Calendar File
        • General Tab of the Calendar File Properties Dialog Box
        • Access Control Tab of the Calendar File Properties Dialog Box
      • Calendar File Security
        • Procedures
          • Enable a User to Access a Calendar File
          • Enable a Group to Access a Calendar File
      • Assigning a Calendar to a Project
      • Rolling Wave Process or Weekly Earned Value
      • When Calendar Dates Change
    • Codes
      • Code Usage in Cobra
      • Code Files
      • Types of Code Files
      • Code File Structures
      • Use a Code File in Multiple Projects
      • Validate Code Assignments — Solve Roll-Up Issues
      • Codes and the Integration Wizard
      • Codes and the Report Wizard
      • Variance Thresholds
      • Code View
        • Edit Tab of the Code View
        • Shortcut Menu
        • Procedures
          • Display the Code View using the Codes Group Bar
          • Display the Code View using the Cobra Button
        • Codes Grid of the Code View
          • Copy Children Dialog Box
            • Display the Copy Children Dialog Box
          • Copy Down Codes Dialog Box
            • Display the Copy Down Codes Dialog Box
          • Reorder Resources/Codes Dialog Box
            • Display the Reorder Resources/Codes Dialog Box
          • Procedures
            • Add a Code to a Code File
            • Add a Child Code to a Code
            • Delete a Code
            • Copy Child Codes to a Code
            • Copy Down Code Assignments to Child Codes
            • Copy Down Threshold Values to Child Codes
            • Reorder Codes
        • Details Tab of the Code View
        • Notes Tab of the Code View
        • Thresholds Tab of the Code View
        • Procedures
          • Add a Note to a Code
          • Set Threshold Values for a Code
      • New Code File Wizard
        • General Information Page of the New Code File Wizard
        • Code File Structure Page of the New Code File Wizard
        • Thresholds Page of the New Code File Wizard
        • Code Fields Page of the New Code File Wizard
        • Access Control Page of the New Code File Wizard
        • Confirmation Page of the New Code File Wizard
        • Procedures
          • Display the New Code File Wizard
          • Create a New Code File
      • Code File Properties Dialog Box
        • General Tab of the Code File Properties Dialog Box
        • Structure Tab of the Code File Properties Dialog Box
        • Code Fields Tab of the Code File Properties Dialog Box
        • Thresholds Tab of the Code File Properties Dialog Box
        • Access Control Tab of the Code File Properties Dialog Box
        • Procedures
          • Display the Code File Properties Dialog Box Tabs without Opening a Code File
          • Display the Code File Properties Dialog Box Tabs from an Open Code File
      • Code File Security
        • Enable a User to Access a Code File
        • Enable a Group to Access a Code File
    • Rates
      • Rate Files
        • Example Rate File
      • Rate Sets
      • Rate View
        • Rate Sets Grid
          • Add Rate Set Wizard
            • General Information Page of the Add Rate Set Wizard
            • Rate Set Options Page of the Add Rate Set Wizard
            • Fixed Value Change Per Time Period Page of the Add Rate Set Wizard
            • Fixed Percentage Change Per Time Period Page of the Add Rate Set Wizard
            • Full Time Equivalent from Calendar Hours Page of the Add Rate Set Wizard
            • Copy Another Rate Set Page of the Add Rate Set Wizard
            • Copy Another Rate Set and Apply a Fixed Value Adjustment Page of the Add Rate Set Wizard
            • Copy Another Set Apply % Adjustment Page of the Add Rate Set Wizard
            • Confirmation Page of the Add Rate Set Wizard
            • Procedures
              • Display the Add Rate Set Wizard
              • Add a Rate Set to a Rate File
        • Rates Grid
          • Procedures
            • Add a Rate to an Existing Rate Set
            • Delete a Rate From a Rate Set
            • Generate Rates for an Existing Rate Set
        • Details Tab of the Rate View
          • Display the Details Tab of the Rate View
        • Edit Tab of the Rate View
        • Shortcut Menu
        • Procedures
          • Display the Rate View using the Cobra Button
          • Display the Rate View using the Rates Group Bar
          • Delete a Rate Set
          • Rename a Rate Set
      • New Rate File Wizard
        • General Information Page of the New Rate File Wizard
        • Code Fields Page of the New Rate File Wizard
        • Access Control Page of the New Rate File Wizard
        • Confirmation Page of the New Rate File Wizard
        • Procedures
          • Display the New Rate File Wizard
          • Create a New Rate File
      • Rate File Properties Dialog Box
        • General Tab of the Rate File Properties Dialog Box
        • Code Fields Tab of the Rate File Properties Dialog Box
        • Access Control Tab of the Rate File Properties Dialog Box
        • Procedures
          • Display the Rate File Properties Dialog Box Tabs from an Open Rate File
          • Display the Rate File Properties Dialog Box Tabs without Opening a Rate File
      • Rate File Security
        • Procedures
          • Enable a User to Access a Rate File
          • Enable a Group to Access a Rate File
    • Resources
      • Resource Components
      • Define Costs for Resources
      • Examples of Resources
      • Resource File Structure
      • Element of Cost
      • Plan Resource Information
      • Additional Information in Resources
      • Results or Field Names
      • Resources and Code Files
      • Loading Resource Files from Open Plan
      • Resource-Loaded Schedule
      • Variance Thresholds
      • Code the Resources for IPMR Format 2 Reports
      • Resource View
        • Procedures
          • Display the Resource View using the Cobra Button
          • Display the Resource View using the Resources Group Bar
        • Edit Tab of the Resource View
        • Shortcut Menu
        • Resources Grid of the Resource View
          • Copy Children Dialog Box
            • Display the Copy Children Dialog Box
          • Copy Down Codes Dialog Box
            • Display the Copy Down Codes Dialog Box
          • Reorder Resources/Codes Dialog Box
            • Display the Reorder Resources/Codes Dialog Box
          • Procedures
            • Add a Resource to a Resource File
            • Add a Child Resource to a Resource
            • Delete a Resource from a Resource File
            • Copy Child Resources to a Resource
            • Copy Down Code Assignments to Child Resources
            • Copy Down Threshold Values to Child Resources
            • Reorder Resources
            • Assign Element of Cost to a Resource
            • Copy Element of Cost Value to Child Resources
        • Details Tab of the Resource View
        • Notes Tab of the Resource View
        • Thresholds Tab of the Resource View
        • Calculations Tab of the Resource View
          • Add Resource Results Dialog Box
            • Display the Add Resource Results Dialog Box
          • Order Resource Results Dialog Box
            • Display the Add Resource Results Dialog Box
          • Copy Resource Calculations Dialog Box
            • Display the Copy Resource Calculations Dialog Box
          • Procedures
            • Add Results to a Resource
            • Add Calculations to a Resource
            • Copy Calculations from Another Resource
            • Delete a Result from a Resource
            • Assign a Rate Set to a Result
        • Apportionment Definition Tab of the Resource View
          • Define Resource Apportionment
      • New Resource File Wizard
        • General Information Page of the New Resource File Wizard
        • Resource File Structure Page of the New Resource File Wizard
        • Thresholds Page of the New Resource File Wizard
        • Code Fields Page of the New Resource File Wizard
        • Default Rates Page of the New Resource File Wizard
        • Resource Results Page of the New Resource File Wizard
        • Access Control Page of the New Resource File Wizard
        • Confirmation Page of the New Resource File Wizard
      • Procedures
        • Create a New Resource File
        • Display the New Resource File Wizard
      • Resource File Properties Dialog Box
        • Procedures
          • Display the Resource File Properties Dialog Box Tabs from an Open Resource File
          • Display the Resource File Properties Dialog Box Tabs without Opening a Resource File
        • General Tab of the Resource File Properties Dialog Box
        • Structure Tab of the Resource File Properties Dialog Box
        • Code Fields Tab of the Resource File Properties Dialog Box
        • Thresholds Tab of the Resource File Properties Dialog Box
        • Results Tab of the Resource File Properties Dialog Box
        • Access Control Tab of the Resource File Properties Dialog Box
      • Resource File Security
        • Procedures
          • Enable a User to Access a Resource File
          • Enable a Group to Access a Resource File
    • Reports
      • Report Properties Dialog Box
        • General Tab of the Report Properties Dialog Box
        • Information Tab of the Report Properties Dialog Box
        • Report Definition Tab of the Report Properties Dialog Box
        • Access Control Tab of the Report Properties Dialog Box
        • Procedures
          • Display the Report Properties Dialog Box
      • Report Parameters
        • Report Content Parameters
        • Report Criterion Parameters
        • Report Options
        • Report Wizard Parameters
        • Reduce Memory Consumption for Very Large Reports
      • Report Wizard
        • Report Page of the Report Wizard
        • Projects Selection Page of the Report Wizard
        • Filter and Sort Page of the Report Wizard
          • Manage Filters Dialog Box of the Report Wizard
            • New Filter Dialog Box of the Report Wizard
            • New Filter Expression Dialog Box of the Report Wizard
            • Edit Filter Expression Dialog Box of the Report Wizard
            • Copy Filter Dialog Box of the Report Wizard
          • Manage Sorts Dialog Box of the Report Wizard
            • New Sort Dialog Box of the Report Wizard
            • New Sort Expression Dialog Box of the Report Wizard
            • Edit Sort Expression Dialog Box of the Report Wizard
            • Copy Sort Dialog Box of the Report Wizard
        • Sub-Totals Page of the Report Wizard
        • Results Page of the Report Wizard
        • Calculated Results
          • Open Dialog Box of the Calculated Results Wizard
          • Calculated Results Dialog Box
          • Add Calculated Result Dialog Box of the Calculated Results Wizard
          • Copy Calculated Result Dialog Box of the Calculated Results Wizard
          • Procedures
            • Create a Calculated Result
            • Display the Calculated Results Wizard
        • Calendar Page of the Report Wizard
        • IPMR Format 2 Summary Page of the Report Wizard
        • Cost Sets Page of the Report Wizard
        • Style Page of the Report Wizard
        • Save and Run Page of the Report Wizard
        • Access Control Page of the Report Wizard
        • Confirmation Page of the Report Wizard
        • Process Running Page of the Report Wizard
        • Process Complete Page of the Report Wizard
        • Procedures
          • Display the Report Wizard
          • Generate a Report
      • Report Categories
        • Ancillary Reports
        • Audit Reports
        • Graphic Reports
        • Column Reports
        • Export Reports
        • Format Reports
        • Planning Reports
        • Time-phased Reports
      • Report Types
      • Customization of Reports
        • Report Templates
        • Report Template Location
        • Report Template Format
        • Report Template Tags
          • Section Tags
          • Formula Tags
          • Other Tags
          • Property Tags
            • Apportionment Mapping Tags
            • Baseline Tags
            • Calendar File Information Tags
            • Calendar Holiday Tags
            • Calendar Period Tags
            • Change Management Tags
            • Class Information Tags
            • Code File Information Tags
            • Code Tags
            • Control Account and Work Package Note Tags
            • Control Account Tags
            • Cost Set Information Tags
            • Explanation of Variance Narrative Tags
            • Milestone Tags
            • Note Information Tags
            • Project Information Tags
            • Rate File Information Tags
            • Rate Set Tags
            • Rate Tags
            • Report Filter Information Tags
            • Report Information Tags
            • Resource Assignment Tags
            • Resource Calculation Tags
            • Resource File Information Tags
            • Resource Tags
            • Work Package Tags
    • Batch Reports
      • Batch Reports Dialog Box
      • Add Batch Report Dialog Box
        • General Tab of the Add Batch Report Dialog Box
        • Included Reports Tab of the Add Batch Report Dialog Box
        • Access Control Tab of the Add Batch Report Dialog Box
      • Edit Batch Report Dialog Box
        • General Tab of the Edit Batch Report Dialog Box
        • Included Reports Tab of the Edit Batch Report Dialog Box
        • Access Control Tab of the Edit Batch Report Dialog Box
      • Copy Batch Report Dialog Box
      • Procedures
        • Run Batch Reports
        • Display the Add Batch Report Dialog Box
        • Display the Edit Batch Report Dialog Box
        • Display the Copy Batch Report Dialog Box
    • Project Processes
      • Status
        • Advance Calendar
          • Advance Calendar Wizard
            • Project Selection Page of the Advance Calendar Wizard
            • Synchronize Status Date Page of the Advance Calendar Wizard
            • Advance to Period Page of the Advance Calendar Wizard
            • Options Page of the Advance Calendar Wizard
            • Confirmation Page of the Advance Calendar Wizard
            • Process Running Page of the Advance Calendar Wizard
            • Process Complete Page of the Advance Calendar Wizard
          • Procedures
            • Advance the Calendar
        • Rolling Wave
          • Calendar Definition
          • Effect of Running the Process
          • Rolling Wave Wizard
            • Project Selection Page of the Rolling Wave Wizard
            • Options Page of the Rolling Wave Wizard
            • Confirmation Page of the Rolling Wave Wizard
            • Process Running Page of the Rolling Wave Wizard
            • Process Complete Page of the Rolling Wave Wizard
          • Procedures
            • Create a Rolling Wave Calendar
            • Assign a Rolling Wave Calendar to the Project
            • Run the Rolling Wave Process
            • Run the Rolling Wave Process Without Advancing the Calendar
        • Calculate Progress
          • Guidelines for Accurate Earned Value Management
          • Progress Techniques
            • Calculate Progress using the Calculated Apportionment Progress Technique
          • Earned Value Methods
          • How Cobra Calculates Progress to Determine Earned Value
          • Sample Earned Value Calculation
          • Possible Sources of Errors
          • Concurrent Progress Calculations
            • Run Concurrent Progress Calculations
              • Troubleshooting Concurrency Issues
                • Use the Process Queue Manager form in PM Compass to Check Job Status
                • The server was unable to process the request due to an internal error
                • There was no endpoint listening at http://<machine>:<port>/CobraWebService/service that could accept the message
                • The encryption type requested is not supported by the KDC
          • Calculate Progress Wizard
            • Project Selection Page of the Calculate Progress Wizard
            • Options Page of the Calculate Progress Wizard
            • Run Page of the Calculate Progress Wizard
            • Confirmation Page of the Calculate Progress Wizard
            • Process Running Page of the Calculate Progress Wizard
            • Process Complete Page of the Calculate Progress Wizard
          • Procedures
            • Assign a Progress Technique to a Work Package
            • Add a Second Earned Value Class to Your Project
            • Select the Level at Which to Capture Actual Costs
            • Select the Earned Value Method
            • Calculate Progress
        • Forecasts
          • Manual Forecasts
          • Statistical Forecasts
          • Retain EAC
          • Coded Ranges Method
          • Forecast Calculations
            • Examples of Forecast Calculations
            • Examples of Manual Forecast Calculations
            • Examples of Statistical Forecast Calculations
          • How Cobra Spreads ETC
            • Calculate Forecast Spread by Existing EAC
            • Calculate Forecast Spread by Budget
          • How Cobra Calculates Forecast Scale EAC
          • Frozen Forecasts
          • Concurrent Forecast Calculations
            • Run Concurrent Forecast Calculations
              • Troubleshooting Concurrency Issues
                • Use the Process Queue Manager form in PM Compass to Check Job Status
                • The server was unable to process the request due to an internal error
                • There was no endpoint listening at http://<machine>:<port>/CobraWebService/service that could accept the message
                • The encryption type requested is not supported by the KDC
          • Calculate Forecast Wizard
            • Project Selection Page of the Calculate Forecast Wizard
            • Options Page of the Calculate Forecast Wizard
            • Forecast Class Selection Page of the Calculate Forecast Wizard
            • Manual Performance Factors Page of the Calculate Forecast Wizard
            • Run Page of the Calculate Forecast Wizard
            • Confirmation Page of the Calculate Forecast Wizard
            • Process Running Page of the Calculate Forecast Wizard
            • Process Complete Page of the Calculate Forecast Wizard
          • Procedures
            • Create a Forecast
            • Set Up a Retain EAC Forecast with the Scale EAC Option
            • Copy Budget to a Manual Forecast Using the Reclass Wizard
            • Export Time-Phased Resource Assignments to Excel
            • Import Time-Phased Resource Assignments from Excel
            • Calculate Forecast
      • Process
        • Freeze Forecast
          • Freeze Forecast Wizard
            • Project Selection Page of the Freeze Forecast Wizard
            • Criteria Selection Page of the Freeze Forecast Wizard
            • Cost Sets Page of the Freeze Forecast Wizard
            • Confirmation Page of the Freeze Forecast Wizard
            • Process Running Page of the Freeze Forecast Wizard
            • Process Complete Page of the Freeze Forecast Wizard
          • Procedures
            • Freeze a Forecast
        • Top-Down Planning
          • Top-Down Planning Wizard
            • Project Selection Page of the Top-Down Planning Wizard
            • Criteria Selection Page of the Top-Down Planning Wizard
            • Classes Page of the Top-Down Planning Wizard
            • Results Page of the Top-Down Planning Wizard
            • Calculation Page of the Top-Down Planning Wizard
            • Confirmation Page of the Top-Down Planning Wizard
            • Process Running Page of the Top-Down Planning Wizard
            • Process Complete Page of the Top-Down Planning Wizard
          • Procedures
            • Perform Top-Down Planning
        • Recalc
          • Recalculation Techniques
          • Recalc Wizard
            • Project Selection Page of the Recalc Wizard
            • Options Page of the Recalc Wizard
            • Criteria Selection Page of the Recalc Wizard
            • Classes Page of the Recalc Wizard
            • Results Page of the Recalc Wizard
            • Date Range Page of the Recalc Wizard
            • Confirmation Page of the Recalc Wizard
            • Process Running Page of the Recalc Wizard
            • Process Complete Page of the Recalc Wizard
          • Procedures
            • Recalculate Costs
        • Respread
          • Respread Wizard
            • Project Selection Page of the Respread Wizard
            • Options Page of the Respread Wizard
            • Criteria Selection Page of the Respread Wizard
            • Date Range Page of the Respread Wizard
            • Classes Page of the Respread Wizard
            • Confirmation Page of the Respread Wizard
            • Process Running Page of the Respread Wizard
            • Process Complete Page of the Respread Wizard
          • Procedures
            • Respread the Budget
        • Reclass
          • Reclass Guidelines
          • Reclass Wizard
            • Project Selection Page of the Reclass Wizard
            • Options Page of the Reclass Wizard
            • Criteria Page of the Reclass Wizard
            • Source Class Page of the Reclass Wizard
            • Target Class Page of the Reclass Wizard
            • Date Range Page of the Reclass Wizard
            • Confirmation Page of the Reclass Wizard
            • Process Running Page of the Reclass Wizard
            • Process Complete Page of the Reclass Wizard
          • Procedures
            • Reclass a Class
        • Replan
          • Replan Wizard
            • Project Selection Page of the Replan Wizard
            • Options Page of the Replan Wizard
            • Criteria Page of the Replan Wizard
            • Method Page of the Replan Wizard
            • Work Package Name Page of the Replan Wizard
            • Confirmation Page of the Replan Wizard
            • Process Running Page of the Replan Wizard
            • Process Complete Page of the Replan Wizard
          • Procedures
            • Perform Project Replan
        • Slip
          • Slip Wizard
            • Project Selection Page of the Slip Wizard
            • Criteria Page of the Slip Wizard
            • Slip By Page of the Slip Wizard
            • Confirmation Page of the Slip Wizard
            • Process Running Page of the Slip Wizard
            • Process Complete Page of the Slip Wizard
          • Procedures
            • Slip a Project
        • Apportionment
          • Apportionment Setup Steps
          • Create the Apportionment Definition
          • Apportionment Mapping
            • Apportionment Dialog Box
              • Display the Apportionment Dialog Box
            • Apportionment Mapping Dialog Box
              • Display the Apportionment Mapping Dialog Box
            • Add Apportionment Target Dialog Box
              • Display the Add Apportionment Target Dialog Box
            • Add Apportionment Source Dialog Box
              • Display the Add Apportionment Source Dialog Box
          • Apportionment Calculations
            • Concurrent Apportionment Calculations
              • Data Locking
              • Troubleshooting Concurrency Issues
                • Use the Process Queue Manager form in PM Compass to Check Job Status
                • The server was unable to process the request due to an internal error
                • There was no endpoint listening at http://<machine>:<port>/CobraWebService/service that could accept the message
                • The encryption type requested is not supported by the KDC
            • Apportionment Calculation Wizard
              • Project Selection Page of the Apportionment Calculation Wizard
              • Calculation Range Page of the Apportionment Calculation Wizard
              • Classes Page of the Apportionment Calculation Wizard
              • Run Page of the Apportionment Calculation Wizard
              • Confirmation Page of the Apportionment Calculation Wizard
              • Process Running Page of the Apportionment Calculation Wizard
              • Process Complete Page of the Apportionment Calculation Wizard
          • Procedures
            • Edit Apportionment Targets
            • Perform Apportionment Mapping
            • Perform Apportionment Calculations
            • Run Concurrent Apportionment Calculations
        • Analyze
          • Security Options for the Analyze Process
          • Analyze Options Dialog Box
            • Display the Analyze Options Dialog Box
          • Locate Custom Application Dialog Box
            • Display the Locate Custom Application Dialog Box
          • Analyze Project Dialog Box
            • Display the Analyze Project Dialog Box
          • Analyze Form
            • Analyze Edit Tab
              • Shortcut Menu
            • Results Pane of the Analyze Form
            • Graph Reports
            • Save Template Dialog Box
              • Display the Save Template Dialog Box
            • Narrative Text Pane of the Analyze Form
            • Get Narrative Dialog Box
              • Display the Get Narrative Dialog Box
          • Procedures
            • Perform Project Analysis
            • Create Graph Reports from the Analyze Form
            • Print Analyze Graph Reports
            • Save Graph Reports as Graphic Files
            • Save Graph Reports as XML Files
            • Copy Narrative Information
          • Customize Graphs
            • Procedures
              • Customize Graphs Using the Chart Designer
              • Select a Chart Type
              • Set Up Chart Details
              • Edit Chart Data
      • Project Audit Logging
        • Audit Logging
          • Log Change Comment Dialog Box
          • Round off Audit Log Transactions
        • Log Significant Changes for IPMR Format 3 Reports
        • Project Audit Wizard
          • Project Selection Page of the Project Audit Wizard
          • Log Operation Page of the Project Audit Wizard
          • Log Transaction Page of the Project Audit Wizard
          • Edit Comment and Change Number Page of the Project Audit Wizard
          • Prompt Level Page of the Project Audit Wizard
          • Set Project Baseline Page of the Project Audit Wizard
          • Log Comment Page of the Project Audit Wizard
          • Confirmation Page of the Project Audit Wizard
          • Process Running Page of the Project Audit Wizard
          • Process Complete Page of the Project Audit Wizard
          • Audit Log Comparison Page of the Project Audit Wizard
        • Procedures
          • Turn Project Audit On or Off
          • Reset the Baseline Using the Project Audit Wizard
          • Reconcile Project Logs Using the Project Audit Wizard
          • Update Transaction Changes
          • Edit the Project Audit Log
    • Integration
      • Integration Wizard
        • Data Import Using Scheduling Tools and Files
          • Sharing Cost and Schedule Information
          • Preparing Cobra for Schedule Integration
          • Data Import from Open Plan
            • Preparing the Open Plan Schedule
              • Check Open Plan Baseline Resource Records
            • Open Plan Fields Imported
            • Resource-Loaded Schedule
            • Loading Resource Files from Open Plan
            • Turn On the Opening % Feature When Integrating with Open Plan
          • Data Import from Microsoft Project
            • Options for Importing from Microsoft Project
            • Configure Cobra to Work with Microsoft Project Server
          • Data Import from Primavera
            • Preparing the Primavera Schedule
            • Primavera Fields Imported
          • Data Import Using Files
            • Import File for Loading Activity and Resource Assignment Data
              • Import File Loading Considerations
              • Sample Format for Loading Activity and Resource Assignment Data
              • Load an Import File with Activity and Resource Assignment Data
            • Import File with Data from Multiple Projects
              • Multi-Project Concurrent Integration
                • Load an Import File with Multiple Projects Concurrently
                • Integration Errors
                  • Troubleshooting Concurrency Issues
                    • Use the Process Queue Manager form in PM Compass to Check Job Status
                    • The server was unable to process the request due to an internal error
                    • There was no endpoint listening at http://<machine>:<port>/CobraWebService/service that could accept the message
                    • The encryption type requested is not supported by the KDC
                • View Job Status and Process Logs
                  • View Job Status and Process Logs in Cobra
                  • View Job Status and Process Logs in PM Compass
            • Import File Example
          • File Level Security
          • Template Resource Files
          • Import Data From Scheduling Tools and Files
          • Integration Wizard-Scheduling Tools and Files
            • Integration Configuration Page of the Integration Wizard
            • Connection Selection Page of the Integration Wizard
              • New Connection Dialog Box of the Integration Wizard
                • New Connection Dialog Box of the Integration Wizard-MS Project
                • New Connection Dialog Box of the Integration Wizard-Primavera
              • Edit Connection Dialog Box of the Integration Wizard
                • Edit Connection Dialog Box of the Integration Wizard-MS Project
                • Edit Connection Dialog Box of the Integration Wizard-Primavera
            • Action Selection Page of the Integration Wizard
            • Project Selection Page of the Integration Wizard
              • Project Selection Page of the Integration Wizard-Files
              • Project Selection Page of the Integration Wizard-Scheduling Tools
            • Notes Page of the Integration Wizard
            • Codes Page of the Integration Wizard
              • Codes Page of the Integration Wizard-MS Project
              • Codes Page of the Integration Wizard-Primavera
              • Codes Page of the Integration Wizard-Open Plan
            • Resources and Rates Page of the Integration Wizard
            • Resources and Rates Page of the Integration Wizard (New Project)
            • Date Selection Page of the Integration Wizard
              • Date Selection Page of the Integration Wizard-MS Project
              • Date Selection Page of the Integration Wizard-Primavera
              • Date Selection Page of the Integration Wizard-Open Plan
            • Import File Field Mapper Page of the Integration Wizard
            • Results Page of the Integration Wizard
            • Schedule Mapping Page of the Integration Wizard
              • Schedule Mapping Page of the Integration Wizard-MS Project
              • Schedule Mapping Page of the Integration Wizard-Primavera
              • Schedule Mapping Page of the Integration Wizard-Open Plan
            • Progress Page of the Integration Wizard
              • Progress Page of the Integration Wizard-Files
              • Progress Page of the Integration Wizard-Scheduling Tools
            • Resource Assignments Page of the Integration Wizard
              • Resource Assignments Page of the Integration Wizard-Files
              • Resource Assignments Page of the Integration Wizard-MS Project
              • Resource Assignments Page of the Integration Wizard-Primavera
              • Resource Assignments Page of the Integration Wizard-Open Plan
            • Calendar Page of the Integration Wizard
            • Change Control Page of the Integration Wizard
              • Deletion Criteria Dialog Box of the Integration Wizard
            • Status File Field Mapper Page of the Integration Wizard
            • Status Page of the Integration Wizard
              • Status Page of the Integration Wizard-Files
              • Status Page of the Integration Wizard-Scheduling Tools
            • Filter Page of the Integration Wizard
              • Filter Page of the Integration Wizard-Files
              • Filter Page of the Integration Wizard-Scheduling Tools
            • Other Options Page of the Integration Wizard
            • Save and Load Page of the Integration Wizard
            • Access Control Page of the Integration Wizard
            • Confirmation Page of the Integration Wizard
            • Process Running Page of the Integration Wizard
            • Process Complete Page of the Integration Wizard
        • Data Import-Actual Costs
          • Control Account Versus Work Package Level
          • Cumulative versus Current Period Costs
          • Master Project Versus Individual Projects
          • Control Account Fields Versus Codes
          • First Result and Derived Costs
          • Cost Classes
          • Entering Actual Costs
            • Entering Actual Costs Using an Import File
              • Import File Preparation
              • Import File Validation
            • Entering Actual Costs Manually
          • Loading Actual Cost Records
            • Loading Actual Cost Records from a CSV File
            • Loading Actual Cost Records from a Database Table
            • Actual Cost Import File
              • Data Formats
              • The Field Mapper
          • Create an MS SQL Database Connection to Load Actual Costs
          • Import Actual Cost Data
          • Integration Wizard-Actual Costs
            • Integration Configuration Page of the Integration Wizard
            • File Selection Page of the Integration Wizard
            • Database Table Selection Page of the Integration Wizard
            • Field Mapper Page of the Integration Wizard
            • Class and Results Page of the Integration Wizard
            • Included Costs Page of the Integration Wizard
            • Options Page of the Integration Wizard
            • Save and Load Page of the Integration Wizard
            • Access Control Page of the Integration Wizard
            • Confirmation Page of the Integration Wizard
            • Process Running Page of the Integration Wizard
            • Process Complete Page of the Integration Wizard
        • Data Import-Ancillary Data
          • Import Ancillary Data
          • Integration Wizard-Ancillary Data
            • Integration Configuration Page of the Integration Wizard
            • File Selection Page of the Integration Wizard
            • Ancillary File Field Mapper Page of the Integration Wizard
            • Save and Load Page of the Integration Wizard
            • Access Control Page of the Integration Wizard
            • Confirmation Page of the Integration Wizard
            • Process Running Page of the Integration Wizard
            • Process Complete Page of the Integration Wizard
        • Data Import-Apportionment Definition and Mapping Data
          • Data Import-Apportionment Definition
            • File Format for Importing Apportionment Definition
          • Data Import-Apportionment Mapping
            • File Format for Importing Apportionment Mapping
          • Edit Exported Data in Excel
          • Import Apportionment Definition and Mapping Data
          • Integration Wizard-Apportionment Definition and Mapping Data
            • File Selection Page of the Integration Wizard
            • Confirmation Page of the Integration Wizard
            • Process Running Page of the Integration Wizard
            • Process Complete Page of the Integration Wizard
        • Data Import-Budget Data
          • Import Budget Data into Cobra
        • Data Import-Status Data
          • File Format for Importing Status Information
          • Import Status Data into Cobra
      • Assignment Import/Assignment Export
        • Rules for Importing Data
        • Export and Import Time-Phased Resource Assignments
        • Specify the Export Location for Resource Assignments
        • Specify the Import Location for Resource Assignments
        • Assignment Import/Assignment Export Wizard
          • Project Selection Page of the Assignment Import/Assignment Export Wizard
          • Resource Assignments Page of the Assignment Import/Assignment Export Wizard
          • Export Location Page of the Assignment Export Wizard
          • Import Location Page of the Assignment Import Wizard
          • Confirmation Page of the Assignment Import/Export Wizard
          • Process Running Page of the Assignment Import/Assignment Export Wizard
          • Process Complete Page of the Assignment Import/Assignment Export Wizard
          • Log Comment Page of the Assignment Import/Assignment Export Wizard
      • Configuration Security
        • Configuration Security Dialog Box
          • Display the Configuration Security Dialog Box
      • Data Export
        • Cost Data Export
          • Exported Cost Data File
          • Cost Data Wizard
            • Configuration Selection Page of the Cost Data Wizard
            • Project and Format Page of the Cost Data Wizard
            • Export Structures Page of the Cost Data Wizard
            • Codes and Structures Page of the Cost Data Wizard
            • Cost Sets Page of the Cost Data Wizard
            • Data Options Page of the Cost Data Wizard
            • Save and Run Page of the Cost Data Wizard
            • Access Control Page of the Cost Data Wizard
            • Confirmation Page of the Cost Data Wizard
            • Process Running Page of the Cost Data Wizard
            • Process Complete Page of the Cost Data Wizard
          • Procedures
            • Export Cost Data
        • Update Open Plan Resources
          • Update Open Plan Resources Wizard
            • General Information Page of the Update Open Plan Resources Wizard
            • Select Configuration Page of the Update Open Plan Resources Wizard
            • Criteria Page of the Update Open Plan Resources Wizard
            • Confirmation Page of the Update Open Plan Resources Wizard
            • Process Running Page of the Export Calendar to Open Plan Wizard
            • Process Complete Page of the Update Open Plan Resources Wizard
          • Procedures
            • Update Open Plan Resources
        • Calendar Export to Open Plan
          • Export Calendar to Open Plan Wizard
            • Calendar Selection Page of the Export Calendar to Open Plan Wizard
            • Confirmation Page of the Export Calendar to Open Plan Wizard
            • Process Running Page of the Export Calendar to Open Plan Wizard
            • Process Complete Page of the Export Calendar to Open Plan Wizard
          • Procedures
            • Export a Calendar to Open Plan
        • Cobra to wInsight Data Export
          • Narrative Export Process
          • wInsight Wizard
            • Configuration Page of the wInsight Wizard
            • Project Page of the wInsight Wizard
            • Export Structures Page of the wInsight Wizard
            • Project Officer Codes Page of the wInsight Wizard
            • Link Structures Page of the wInsight Wizard
            • Control Account Codes Page of the wInsight Wizard
            • Work Package Codes Page of the wInsight Wizard
            • Cost Sets Page of the wInsight Wizard
            • Element of Cost Page of the wInsight Wizard
            • Performance Data Page of the wInsight Wizard
            • IPMR Format 2 Summary Page of the wInsight Wizard
            • Miscellaneous Page of the wInsight Wizard
            • wInsight Database Page of the wInsight Wizard
              • New Connection Dialog Box of the wInsight Wizard
              • Edit Connection Dialog Box of the wInsight Wizard
            • Save and Run Page of the wInsight Wizard
            • Access Control Page of the wInsight Wizard
            • Confirmation Page of the wInsight Wizard
            • Process Running Page of the wInsight Wizard
            • Process Complete Page of the wInsight Wizard
          • Procedures
            • Export Data from Cobra to wInsight
          • Sections of the XML File
            • Units Section of the XML File
            • Structures Section of the XML File
            • Columns Section of the XML File
            • Calendars Section of the XML File
            • CalendarDets Section of the XML File
            • Contractors Section of the XML File
            • Contracts Section of the XML File
            • ACL Section of the XML File
            • Periods Section of the XML File
            • Cprs Section of the XML File
            • Elements Section of the XML File
            • EarnedValues Section of the XML File
            • Manpowers Section of the XML File
            • FutureEtcs Section of the XML File
            • NarrElemPers Section of the XML File
            • ElemLinks Section of the XML File
          • wInsight DTD
        • Data Export in ANSI EIA X12 Format
          • ANSI EIA X12 Wizard
            • Project Selection Page of the ANSI EIA X12 Wizard
            • Export Structures Page of the ANSI EIA X12 Wizard
            • Project Officer Codes Page of the ANSI EIA X12 Wizard
            • Results Page of the ANSI EIA X12 Wizard
            • Options Page of the ANSI EIA X12 Wizard
            • Export Page of the ANSI EIA X12 Wizard
            • Confirmation Page of the ANSI EIA X12 Wizard
            • Process Running Page of the ANSI EIA X12 Wizard
            • Process Complete Page of the ANSI EIA X12 Wizard
          • Procedures
            • Export Data in ANSI EIA X12 Format
    • Tools
      • Align Time-phased Dates
        • Align Time-phased Dates Wizard
          • Project Selection Page of the Align Time-phased Dates Wizard
          • Original Calendar Page of the Align Time-phased Dates Wizard
          • Confirmation Page of the Align Time-phased Dates Wizard
          • Process Running Page of the Align Time-phased Dates Wizard
          • Process Complete Page of the Align Time-phased Dates Wizard
        • Procedures
          • Align Time phased Resource Records
      • Zero-Out Data
        • Zero-Out Data Wizard
          • Project Selection Page of the Zero-Out Data Wizard
          • Options Page of the Zero-Out Data Wizard
          • Criteria Selection Page of the Zero-Out Data Wizard
          • Classes Page of the Zero-Out Data Wizard
          • Date Range Page of the Zero-Out Data Wizard
          • Confirmation Page of the Zero-Out Data Wizard
          • Process Running Page of the Zero-Out Data Wizard
          • Process Complete Page of the Zero-Out Data Wizard
        • Procedures
          • Set Resource Values to Zero
      • Update Codes
        • Update Codes Wizard
          • Project Selection Page of the Update Codes Wizard
          • Criteria Selection Page of the Update Codes Wizard
          • Update Code Page of the Update Codes Wizard
          • Confirmation Page of the Update Codes Wizard
          • Process Running Page of the Update Codes Wizard
          • Process Complete Page of the Update Codes Wizard
        • Procedures
          • Update the Code Fields
      • Replace Resources
        • Replace Resources Wizard
          • Project Selection Page of the Replace Resources Wizard
          • Resource Selection Page of the Replace Resources Wizard
          • Confirmation Page of the Replace Resources Wizard
          • Process Running Page of the Replace Resources Wizard
          • Process Complete Page of the Replace Resources Wizard
        • Procedures
          • Replace or Merge Resources
      • Calculated Fields
        • Calculated Fields Dialog Box
        • New Calculated Field Dialog Box
        • Calculated Field Expression Dialog Box
        • Fields Dialog Box
        • Considerations When Creating Field Names
        • Procedures
          • Display the Calculated Fields Dialog Box
          • Display the New Calculated Field Dialog Box
          • Display the Calculated Field Expression Dialog Box
          • Display the Fields Dialog Box
          • Create Calculated Fields
      • Update Totals
        • Update Totals Wizard
          • Project Selection Page of the Update Totals Wizard
          • Confirmation Page of the Update Totals Wizard
          • Process Running Page of the Update Totals Wizard
          • Process Complete Page of the Update Totals Wizard
        • Procedures
          • Update Totals
      • SQL Command Utility
        • SQL Command Utility Dialog Box
        • SQL Command Utility Supported Parameters
        • SQL Language Extended Support
        • Procedures
          • Run the SQL Command Utility
      • Validity Check
        • Validity Check Wizard
          • Project Selection Page of the Validity Check Wizard
          • Validations Page of the Validity Check Wizard
          • Business Validations Page of the Validity Check Wizard
          • Resource and Code Assignment Validations Page of the Validity Check Wizard
          • Ancillary File Validations Page of the Validity Check Wizard
          • Data Anomaly Validations Page of the Validity Check Wizard
          • Project and Apportionment Validations Page of the Validity Check Wizard
          • Confirmation Page of the Validity Check Wizard
          • Process Running Page of the Validity Check Wizard
          • Process Complete Page of the Validity Check Wizard
        • Procedures
          • Perform a Validity Check
      • Process Logs
        • Process Logs Dialog Box
        • Process Log Viewer
        • Errors Dialog Box of the Process Log Viewer
        • Warnings Dialog Box of the Process Log Viewer
        • Procedures
          • Display the Process Logs Dialog Box
          • Display the Process Log Viewer
          • Display the Errors Dialog Box of the Process Log Viewer
          • Display the Warnings Dialog Box of the Process Log Viewer
      • Debug Logs
        • ProcessLog.xml Log File
        • ClientDebugLog.xml Log File
        • ServerDebugLog.xml Log File
          • Logging of Memory Usage Details
        • Procedures
          • Log SQL Statements in ClientDebugLog.xml
          • Log SQL Statements in ServerDebugLog.xml
          • Edit IdeaBlade.ibconfig File
          • Disable the Automatic Archiving of ClientDebugLog.xml Log File
          • Log Memory Usage Details
      • Custom Hooks
        • Custom Hook Parameters
        • Customization of Processes
        • Customization of Integration Process
        • Procedures
          • Set Up Custom Applications
      • API
        • Running Cobra with Command Line Parameters
        • API Log File
        • API Script
          • Settings Section of the API Script
          • Process Sections of the API Script
            • Advance Calendar Process
            • ANSI EIA X12 Process
            • Apportionment Process
            • Backup Project Process
            • Batch Report Process
            • Calculate Progress Process
            • Calculate Forecast Process
            • Copy Project Process
            • Cost Data Export Process
            • Create Project from Template Process
            • Delete Project Process
            • Get Cobra Spread Process
            • Initialize Forecast Process
            • Integrate Actual Costs Process
            • Integrate Ancillary Data Process
            • Integrate Apportionment Definition Process
            • Integrate Apportionment Mapping Process
            • Integrate Project Data Process
            • Recalculate Process
            • Reclass Process
            • Reconcile Log Process
            • Replace Resources Process
            • Replan Process
            • Respread Process
            • Restore Process
            • Rolling Wave Process
            • Set Project Baseline Process
            • SQL Command Process
            • Update Totals Process
            • Update Tphase Process
            • Validity Check Process
            • wInsight Export Process
        • Project Template Creation
          • Required Template Files
          • XML Configuration File
          • API Script to Create a New Project from a Project Template
          • Application Settings
          • Additional Project Files
          • XML Configuration File Sample
          • Hook Program Methods
          • XML Configuration Object Interface
          • ClassRateFiles Collection
          • MsgLogger Object Interface
        • Procedures
          • Run the API Script
          • Create Windows Shortcut for the API Script
    • Security
      • EPM Security Administrator Functions
        • Procedures
          • Run the EPM Security Administrator
          • Disable Logins
          • Display a Login Message
          • Terminate a Session
          • Send a Message to Users
          • Turn Windows Authentication On or Off
          • Set Maximum Time of Inactivity
          • Set a Maximum Number of Login Tries
      • Change Ownership and Access Rights
        • Change Ownership and Access Rights Dialog Box
          • Display the Change Ownership and Access Rights Dialog Box
        • Procedures
          • Change the Owner of an Object
          • Change the Access Rights of an Object
      • Access Control
      • Windows Authentication
        • Windows Domain and User Name Authentication Plus Role Authentication
        • Configure Windows Authentication in an N-Tier Deployment
        • Configuring Windows Authentication Using the Configuration Files
          • wsHttpBinding Configuration
            • Procedures
              • Edit the Ideablade.Ibconfig file in the Server Folder
              • Configure Windows Authentication in an N-Tier Deployment
              • Configure the Service Parameters (wsHttpBinding)
              • Edit the Ideablade.Ibconfig file in the Cobra Folder
              • Modify the Cobra.WinUI.Exe.Config File in the Cobra Folder
            • Procedures
              • Edit the Ideablade.Ibconfig file in the Workstation Folder
              • Modify the Cobra.WinUI.Exe.Config File in the Workstation Folder
              • Modify the Cobra.Api.Exe.Config File in the Workstation Folder
          • netTcpBinding Configuration
            • netTcpBinding Message Level Authentication
              • Procedures
                • Edit the Ideablade.Ibconfig file in the Server Folder (netTcpBinding)
                • Configure Windows Authentication in an N-Tier Deployment
                • Configure the Service Parameters (netTcpBinding Message Level)
              • Procedures
                • Edit the Ideablade.Ibconfig file in the Workstation Folder (netTcpBinding)
                • Modify the Cobra.WinUI.Exe.Config File in the Workstation Folder (netTcpBinding Message Level)
                • Modify the Cobra.Api.Exe.Config File in the Workstation Folder (netTcpBinding Message Level)
            • netTcpBinding Transport Level Authentication
              • Procedures
                • Edit the Ideablade.Ibconfig file in the Server Folder (netTcpBinding)
                • Configure Windows Authentication in an N-Tier Deployment
                • Configure the Service Parameters (netTcpBinding Transport Level)
              • Procedures
                • Edit the Ideablade.Ibconfig file in the Workstation Folder (netTcpBinding)
                • Modify the Cobra.WinUI.Exe.Config File in the Workstation Folder (netTcpBinding Transport Level)
                • Modify the Cobra.Api.Exe.Config File in the Workstation Folder (netTcpBinding Transport Level)
          • Procedures
            • Deploy Configuration Files for Windows Authentication with an Upgrade Installation
            • Deploy Configuration Files for Windows Authentication with a New Installation
    • Cobra Database
      • Data Tool
      • ODBC DSN
    • Cobra Developer Resources
      • Cobra Web Service
        • Supported Processes, Operations, and Data
        • Deploying the Cobra Web Service
          • Deploy the Cobra Web Service Host
          • Configure the Cobra Web Service When Using Windows Authentication
            • Provide Access to the [NT AuthoritySystem] User to the Database
            • Create a Service Account for the Cobra Web Service
            • Grant the Service Account Access to the Database
          • Deploy the Cobra Web Service ClientAPI
          • Remove the Cobra Web Service Host from Windows Services
        • Using the Cobra Web Service ClientAPI in Your Application
          • Add the ClientAPI Files as Reference in Visual Studio Projects
          • Explaining the Cobra Web Service ClientAPI
            • Connecting to the Cobra Web Service Host
            • Creating Service Operations Classes
            • Running the Process or Operation
            • Retrieving Data
            • Logging Out of the Cobra Web Service Host
        • Cobra Web Service ClientAPI Example
          • Create a Sample Actual Cost Integration File
          • Run the SampleClientAPI Files
          • Explaining the SampleClientAPI Code
        • Cobra Web Service Log
          • Enable the WCF Trace Log
        • Other Distribution Files
        • Deltek Products That Utilize the Cobra Web Service
        • Troubleshooting Cobra Web Service Issues
          • The encryption type requested is not supported by the KDC
      • Cobra Web Service Management Tool
        • Cobra Web Service Management Tool Interface
          • Left Pane of the Cobra Web Service Management Tool
          • Right Pane of the Cobra Web Service Management Tool
            • Cobra Web Service Instance Settings
            • Cobra Web Service Gateway Settings
        • Procedures
          • Configure a New Instance
          • Configure the Gateway
          • Uninstall an Instance or the Gateway
          • Stop an Instance or the Gateway
          • Restart an Instance or the Gateway
          • Enable the WCF Trace Log
      • Configuring the Cobra Web Service to Use Secure Socket Layers
        • Obtain the Authentication Certificate Information on the Cobra Web Service Machines
        • Bind the Windows Server Certificate to the Cobra Web Service HTTPS Ports
        • Configure the Cobra Web Service Instances and/or Gateway using Cobra Web Service Management Tool
    • Cobra Features for PM Compass Users
      • Concurrency in Cobra
      • BCR Analysis Report
    • Advanced Topics
      • Multiple Sessions in Cobra
      • Running Cobra with Command Line Parameters
        • Pass Command Line Parameters using the New Application Shortcut
      • Additional User Fields
        • Configure Cobra to Support Additional User Fields
      • Application Processes
      • Troubleshoot Issues with Saving to the IdeaBlade.ibconfig File in Cobra
        • Clear the Read-only Flag in the IdeaBlade.ibconfig File
        • Run Cobra Using a Different IdeaBlade.ibconfig File
      • Troubleshoot Oracle Error ORA-600 [kkqcscpcky:ficand] While Running Query with Parameter "_replace_virtual_columns=false"
        • Update the "_replace_virtual_columns" Setting
    • Data Dictionary
Index
  • .net
  • about deltek cobra dialog box
  • access control
    • Change Owner Dialog Box
    • Display the Change Ownership and Access Rights Dialog Box
    • Access Control
    • Display the Change Owner Dialog Box
    • Procedures
    • Change Ownership and Access Rights
    • Change Ownership and Access Rights Dialog Box
    • Display the Change Ownership and Access Rights Dialog Box
    • Change Ownership and Access Rights Dialog Box
    • Change the Owner of an Object
    • Change Access Rights Dialog Box
    • ACL Section of the XML File
    • Change the Access Rights of an Object
  • access control page
    • Confirmation Page of the Integration Wizard
    • Enable a User to Access a Resource File
    • Access Control Page of the New Rate File Wizard
    • Confirmation Page of the Report Wizard
    • Access Control Page of the Integration Wizard
    • Enable a Group to Access a Code File
    • Access Control
    • Access Control Page of the New Code File Wizard
    • Access Control Page of the wInsight Wizard
    • Access Control Page of the Report Wizard
    • Access Control Page of the New Calendar File Wizard
    • Enable a User to Access a Code File
    • Access Control Page of the New Project Wizard
    • Enable a Group to Access a Calendar File
    • Access Control Page of the Integration Wizard
    • Access Control Page of the Cost Data Wizard
    • Access Control Page of the Integration Wizard
    • Access Control Page of the New Resource File Wizard
  • access control tab
    • Access Control Tab of the Report Properties Dialog Box
    • Enable a User to Access a Resource File
    • Access Control Tab of the Calendar File Properties Dialog Box
    • Access Control Tab of the Rate File Properties Dialog Box
    • Enable a Group to Access a Resource File
    • Resource File Security
    • Access Control Tab of the Add Batch Report Dialog Box
    • Access Control Tab of the Resource File Properties Dialog Box
    • Access Control Tab of the Code File Properties Dialog Box
    • EPM Security Administrator Functions
    • Access Control
    • Enable a User to Access a Code File
    • Access Control Tab of the Edit Batch Report Dialog Box
    • Enable a User to Access a Calendar File
    • Enable a Group to Access a Calendar File
    • Access Control Tab of the Project Properties Dialog Box
  • access rights
    • Change Owner Dialog Box
    • Display the Change Ownership and Access Rights Dialog Box
    • Display the Change Owner Dialog Box
    • Procedures
    • Change Ownership and Access Rights
    • Change Ownership and Access Rights Dialog Box
    • Display the Change Ownership and Access Rights Dialog Box
    • Change Ownership and Access Rights Dialog Box
    • Change the Owner of an Object
    • Change Access Rights Dialog Box
    • Change the Access Rights of an Object
  • action selection page
  • actual cost
    • Confirmation Page of the Integration Wizard
    • Import File Field Mapper Page of the Integration Wizard
    • Class Settings Page for Actuals Class of the New Class Wizard
    • Save and Load Page of the Integration Wizard
    • Code Files
    • SQL Command Utility
    • First Result and Derived Costs
    • Work Package Name Page of the Replan Wizard
    • Settings Page of the New Project Wizard
    • Examples of Manual Forecast Calculations
    • Spreadsheet Pane of the Project View
    • Thresholds Tab of the Code File Properties Dialog Box
    • Method Page of the Replan Wizard
    • Progress Techniques
    • Codes
    • Loading Actual Cost Records
    • Thresholds Tab of the Code View
    • Class and Results Page of the Integration Wizard
    • Reporting
    • Cumulative versus Current Period Costs
    • Thresholds Page of the New Code File Wizard
    • Actual Costs Preferences
    • Projects
    • Replan Preferences
    • Project and Apportionment Validations Page of the Validity Check Wizard
    • Integration Configuration Page of the Integration Wizard
    • Export Structures Page of the wInsight Wizard
    • The Field Mapper
    • Files Tab of the Project Properties Dialog Box
    • Statistical Forecasts
    • Field Mapper Page of the Integration Wizard
    • EPM Security Administrator Functions
    • Supported Processes, Operations, and Data
    • Select the Level at Which to Capture Actual Costs
    • Import File Preparation
    • Entering Actual Costs
    • Resources
    • Examples of Forecast Calculations
    • Actual Cost Import File
    • Cost Sets Page of the Report Wizard
    • General Tab of the Classes Tab
    • Import File Validation
    • Project Selection Page of the Freeze Forecast Wizard
    • Master Project Versus Individual Projects
    • Progress Techniques
    • Custom Cost Classes
    • Multiproject Operations (Master and Subprojects)
    • Codes and the Integration Wizard
    • Integrate Actual Costs Process
    • How Cobra Spreads ETC
    • Integration Configuration Page of the Integration Wizard
    • Entering Actual Costs Using an Import File
    • Preparing the Open Plan Schedule
    • Guidelines for Accurate Earned Value Management
    • Thresholds Page of the New Resource File Wizard
    • Control Account Fields Versus Codes
    • Forecast Calculations
    • Customization of Integration Process
    • Running the Process or Operation
    • Cost Classes
    • Reclass Preferences
    • Creating Service Operations Classes
    • Integration Wizard-Actual Costs
    • File Selection Page of the Integration Wizard
    • Database Table Selection Page of the Integration Wizard
    • Resources and Code Files
    • Frozen Forecasts
    • Export Structures Page of the ANSI EIA X12 Wizard
    • Options Page of the Replan Wizard
    • Data Import-Actual Costs
    • Retain EAC
    • Freeze a Forecast
    • Examples of Statistical Forecast Calculations
    • Access Control Page of the Integration Wizard
    • Take your Implementation a Step Further
    • Thresholds Tab of the Resource View
    • Loading Actual Cost Records from a Database Table
    • Resources
    • Resource File Structure Page of the New Resource File Wizard
    • Codes
    • Cobra Web Service
    • Process Lock
    • Entering Actual Costs Manually
    • Process Logs Dialog Box
    • Select the Level at Which to Capture Actual Costs
    • Results Pane of the Analyze Form
    • Data Formats
    • Customization of Processes
    • Time-phased Reports
    • Control Account Versus Work Package Level
    • Included Costs Page of the Integration Wizard
    • Options Page of the Integration Wizard
    • Manual Forecasts
  • actual costs
    • Control Accounts and Work Packages
    • Create an MS SQL Database Connection to Load Actual Costs
  • acumen
    • Cost Data Export Process
    • Supported Processes, Operations, and Data
    • Cost Data Export
    • Cobra Web Service
  • add batch report dialog box
    • Access Control Tab of the Add Batch Report Dialog Box
    • Display the Add Batch Report Dialog Box
    • Add Batch Report Dialog Box
  • add calculation
  • add calendar periods
  • add calendar set
  • add control account
    • Add a New Control Account Manually
    • Add a New Control Account using the Dialog Box
  • add control account dialog box
  • add holidays
  • add rate set
    • Copy Another Rate Set and Apply a Fixed Value Adjustment Page of the Add Rate Set Wizard
    • Copy Another Rate Set Page of the Add Rate Set Wizard
    • Add Rate Set Wizard
  • add rate set wizard
    • Copy Another Set Apply % Adjustment Page of the Add Rate Set Wizard
    • Copy Another Rate Set and Apply a Fixed Value Adjustment Page of the Add Rate Set Wizard
    • Confirmation Page of the Add Rate Set Wizard
    • Rate Set Options Page of the Add Rate Set Wizard
    • Full Time Equivalent from Calendar Hours Page of the Add Rate Set Wizard
    • Fixed Percentage Change Per Time Period Page of the Add Rate Set Wizard
    • Copy Another Rate Set Page of the Add Rate Set Wizard
    • General Information Page of the Add Rate Set Wizard
    • Display the Add Rate Set Wizard
    • Fixed Value Change Per Time Period Page of the Add Rate Set Wizard
  • add resource
  • add resource assignment dialog box
  • add resource results
  • add work package
    • Add a New Work Package using the Dialog Box
    • Add a New Work Package Manually
  • add work package dialog box
  • administrator
    • Data Tool
    • Access Control Tab of the Calendar File Properties Dialog Box
    • Project Codes Tab of the Application Preferences Dialog Box
    • Apportionment Definition Tab of the Resource View
    • Projects
    • Send a Message to Users
    • Integration Configuration Page of the Integration Wizard
    • Access Control Tab of the Resource File Properties Dialog Box
    • Access Control Tab of the Code File Properties Dialog Box
    • Terminate a Session
    • Code Fields Page of the New Code File Wizard
    • EPM Security Administrator Functions
    • Security Options for the Analyze Process
    • Set a Maximum Number of Login Tries
    • Display the New Project Wizard
    • Manage Sorts Dialog Box of the Report Wizard
    • Access Control Page of the New Code File Wizard
    • Access Control Page of the Report Wizard
    • Code Fields Page of the New Resource File Wizard
    • Integration Configuration Page of the Integration Wizard
    • Integration Configuration Page of the Integration Wizard
    • Access Control Tab of the Edit Batch Report Dialog Box
    • Log Operation Page of the Project Audit Wizard
    • Display a Login Message
    • wInsight Database Page of the wInsight Wizard
    • Access Control Page of the New Project Wizard
    • Custom Menu Items
    • Set Maximum Time of Inactivity
    • Turn Windows Authentication On or Off
    • Access Control Tab of the Project Properties Dialog Box
    • Manage Filters Dialog Box of the Report Wizard
    • Access Control Page of the New Resource File Wizard
    • Fields Page of the New Project Wizard
  • advance calendar
    • Progressing
    • Advance Calendar Wizard
    • Project Selection Page of the Advance Calendar Wizard
    • Process Running Page of the Advance Calendar Wizard
    • Advance to Period Page of the Advance Calendar Wizard
    • Procedures
    • Synchronize Status Date Page of the Advance Calendar Wizard
    • Supported Processes, Operations, and Data
    • How Cobra Calculates Progress to Determine Earned Value
    • Connecting to the Cobra Web Service Host
    • Advance Calendar
    • Running the Process or Operation
    • Creating Service Operations Classes
    • Confirmation Page of the Advance Calendar Wizard
    • Process Complete Page of the Advance Calendar Wizard
    • Advance Calendar Preferences
    • Advance Calendar Process
    • Cobra Web Service
    • Process Logs Dialog Box
    • Advance the Calendar
    • Options Page of the Advance Calendar Wizard
  • advance calendar wizard
    • Advance Calendar Wizard
    • Project Selection Page of the Advance Calendar Wizard
    • Process Running Page of the Advance Calendar Wizard
    • Advance to Period Page of the Advance Calendar Wizard
    • Procedures
    • Synchronize Status Date Page of the Advance Calendar Wizard
    • Advance Calendar
    • Confirmation Page of the Advance Calendar Wizard
    • Process Complete Page of the Advance Calendar Wizard
    • Advance the Calendar
    • Options Page of the Advance Calendar Wizard
  • advance to period page
  • align time phased dates
    • Process Complete Page of the Align Time-phased Dates Wizard
    • Align Time phased Resource Records
    • Process Running Page of the Align Time-phased Dates Wizard
    • Original Calendar Page of the Align Time-phased Dates Wizard
    • Align Time-phased Dates
    • Procedures
    • Project Selection Page of the Align Time-phased Dates Wizard
    • Confirmation Page of the Align Time-phased Dates Wizard
  • align time phased dates wizard
    • Process Complete Page of the Align Time-phased Dates Wizard
    • Align Time phased Resource Records
    • Process Running Page of the Align Time-phased Dates Wizard
    • Original Calendar Page of the Align Time-phased Dates Wizard
    • Align Time-phased Dates
    • Procedures
    • Project Selection Page of the Align Time-phased Dates Wizard
    • Align Time-phased Dates Wizard
    • Confirmation Page of the Align Time-phased Dates Wizard
  • all reports pane
    • Reports Pane Column Definitions
    • Shortcut Menu
    • All Reports Pane
  • analyze
    • Code Files
    • Analyze Preferences
    • Create Graph Reports from the Analyze Form
    • Edit Chart Data
    • Analyze Options Dialog Box
    • Customize Graphs Using the Chart Designer
    • Variance Thresholds
    • Save Graph Reports as XML Files
    • Graph Reports
    • Save Template Dialog Box
    • Procedures
    • Analyze
    • Security Options for the Analyze Process
    • Calendars
    • Variance Thresholds
    • Analyze Edit Tab
    • Locate Custom Application Dialog Box
    • Procedures
    • Classes Tab of the Project Properties Dialog Box
    • Multiproject Operations (Master and Subprojects)
    • Customize Graphs
    • Narrative Text Pane of the Analyze Form
    • Guidelines for Accurate Earned Value Management
    • Analyze Project Dialog Box
    • Select a Chart Type
    • Get Narrative Dialog Box
    • Save Graph Reports as Graphic Files
    • Copy Narrative Information
    • Export Structures Page of the ANSI EIA X12 Wizard
    • Print Analyze Graph Reports
    • Cobra 8.4 Help System
    • Perform Project Analysis
    • Set Up Chart Details
    • Analyze Form
    • Shortcut Menu
    • Process Logs Dialog Box
    • Results Pane of the Analyze Form
    • Resource Components
    • Column Reports
    • Ancillary Files Page of the New Project Wizard
  • analyze edit tab
    • Analyze Edit Tab
    • Shortcut Menu
  • analyze form
    • Create Graph Reports from the Analyze Form
    • Edit Chart Data
    • Analyze Options Dialog Box
    • Customize Graphs Using the Chart Designer
    • Save Graph Reports as XML Files
    • Graph Reports
    • Save Template Dialog Box
    • Procedures
    • Analyze
    • Security Options for the Analyze Process
    • Analyze Edit Tab
    • Locate Custom Application Dialog Box
    • Procedures
    • Customize Graphs
    • Narrative Text Pane of the Analyze Form
    • Analyze Project Dialog Box
    • Select a Chart Type
    • Get Narrative Dialog Box
    • Save Graph Reports as Graphic Files
    • Copy Narrative Information
    • Print Analyze Graph Reports
    • Perform Project Analysis
    • Set Up Chart Details
    • Analyze Form
    • Shortcut Menu
    • Results Pane of the Analyze Form
  • analyze options
  • analyze options dialog box
  • ancillary
  • ancillary file
    • Rename Dialog Box
    • Validity Check Process
    • Access Control Page of the Integration Wizard
    • Rename an Ancillary File
    • General Information Page of the New Project Wizard
    • Back Up Your Data
    • Save and Load Page of the Integration Wizard
    • Files Tab of the Project Properties Dialog Box
    • Sub-Projects Validation Dialog Box
    • Ancillary File Validations Page of the Validity Check Wizard
    • Confirmation Page of the Integration Wizard
    • Backup Project Process
    • Save As Dialog Box (Ancillary Files)
    • Integrate Ancillary Data Process
    • User Preferences Dialog Box
    • Process Running Page of the Integration Wizard
    • Purge Dialog Box
    • Ancillary File Field Mapper Page of the Integration Wizard
    • Cobra 8.4 Help System
    • Process Complete Page of the Integration Wizard
    • Select Files to Restore Dialog Box
    • Save As Dialog Box (Ancillary Files)
    • Ancillary Files Page of the New Project Wizard
  • ancillary file field mapper page
  • ancillary file validations page
  • ancillary files
    • Considerations When Creating Names in Cobra
    • Considerations When Creating Names in Cobra
  • ansi eia x12
    • ANSI EIA X12 Preferences
    • ANSI EIA X12 Process
  • ansi eia x12 wizard
    • Results Page of the ANSI EIA X12 Wizard
    • Process Complete Page of the ANSI EIA X12 Wizard
    • Confirmation Page of the ANSI EIA X12 Wizard
    • Export Page of the ANSI EIA X12 Wizard
    • Project Officer Codes Page of the ANSI EIA X12 Wizard
    • Procedures
    • Project Selection Page of the ANSI EIA X12 Wizard
    • Process Running Page of the ANSI EIA X12 Wizard
    • Data Export in ANSI EIA X12 Format
    • ANSI EIA X12 Wizard
    • Export Data in ANSI EIA X12 Format
    • Export Structures Page of the ANSI EIA X12 Wizard
    • Options Page of the ANSI EIA X12 Wizard
  • api
    • Create Windows Shortcut for the API Script
    • Calculate Progress Process
    • Preparing the Primavera Schedule
    • API
    • Initialize Forecast Process
    • Delete Project Process
    • Restore Process
    • Batch Report Process
    • Run the API Script
    • Get Cobra Spread Process
    • Cost Data Export Process
    • Validity Check Process
    • XML Configuration File Sample
    • Calculate Forecast Process
    • Terminate a Session
    • Project Template Creation
    • Supported Processes, Operations, and Data
    • Backup Project Process
    • Required Template Files
    • Hook Program Methods
    • API Log File
    • Integrate Ancillary Data Process
    • Create Project from Template Process
    • SQL Command Process
    • MsgLogger Object Interface
    • Apportionment Process
    • Replan Process
    • Edit Connection Dialog Box of the Integration Wizard-Primavera
    • Integrate Actual Costs Process
    • Reclass Process
    • XML Configuration File
    • Respread Process
    • ClassRateFiles Collection
    • API Script
    • Procedures
    • Process Sections of the API Script
    • Reconcile Log Process
    • Settings Section of the API Script
    • New Connection Dialog Box of the Integration Wizard-Primavera
    • Rolling Wave Process
    • wInsight Export Process
    • Integrate Project Data Process
    • Copy Project Process
    • Additional Project Files
    • Integrate Apportionment Mapping Process
    • XML Configuration Object Interface
    • Set Project Baseline Process
    • Update Tphase Process
    • Advance Calendar Process
    • Cobra Web Service
    • Integrate Apportionment Definition Process
    • Process Logs Dialog Box
    • ANSI EIA X12 Process
    • Replace Resources Process
    • API Script to Create a New Project from a Project Template
    • Application Settings
    • Recalculate Process
  • application preferences
    • Application Preferences
    • Application Preferences Dialog Box
    • General Tab of the Application Preferences Dialog Box
  • application preferences dialog box
    • Data Access Tab of the Application Preferences Dialog Box
    • Application Preferences Dialog Box
    • Spread Curves Tab of the Application Preferences Dialog Box
    • Project Codes Tab of the Application Preferences Dialog Box
    • Custom Hooks Tab of the Application Preferences Dialog Box
    • General Tab of the Application Preferences Dialog Box
    • Add Spread Curve Dialog Box
    • Integration Tab of the Application Preferences Dialog Box
    • Configure the Application Settings
    • Edit Note Category Dialog Box
    • New Note Category Dialog Box
    • Notes Tab of the Application Preferences Dialog Box
    • Reports Tab of the Application Preferences Dialog Box
  • application process
  • application settings
    • Application Preferences
    • Configure the Application Settings
    • Other Tab of the Application Preferences Dialog Box
    • Application Settings
  • apportionment
    • Process Running Page of the Apportionment Calculation Wizard
    • Classes Page of the Apportionment Calculation Wizard
    • Resource Assignments Page of the Integration Wizard-Open Plan
    • Perform Apportionment Mapping
    • Calculate Progress using the Calculated Apportionment Progress Technique
    • File Format for Importing Apportionment Mapping
    • Progress Techniques
    • Validity Check Process
    • Project Selection Page of the Apportionment Calculation Wizard
    • Apportionment Definition Tab of the Resource View
    • Project and Apportionment Validations Page of the Validity Check Wizard
    • Process Complete Page of the Apportionment Calculation Wizard
    • Apportionment Calculation Wizard
    • Add Apportionment Source Dialog Box
    • Apportionment Dialog Box
    • Apportionment Setup Steps
    • Resource Assignments Page of the Integration Wizard-Files
    • Calculation Range Page of the Apportionment Calculation Wizard
    • Apportionment Mapping Tags
    • Create the Apportionment Definition
    • File Selection Page of the Integration Wizard
    • Apportionment
    • How Cobra Calculates Progress to Determine Earned Value
    • Progress Techniques
    • Apportionment Process
    • Apportionment Calculations
    • Apportionment Mapping Dialog Box
    • Data Import-Apportionment Definition and Mapping Data
    • Perform Apportionment Calculations
    • Planning Reports
    • Apportionment Mapping
    • Add Apportionment Target Dialog Box
    • Edit Apportionment Targets
    • Resource Tags
    • Process Lock
    • Confirmation Page of the Apportionment Calculation Wizard
    • Process Logs Dialog Box
  • apportionment calculation
    • Process Running Page of the Apportionment Calculation Wizard
    • Classes Page of the Apportionment Calculation Wizard
    • Perform Apportionment Mapping
    • Project Selection Page of the Apportionment Calculation Wizard
    • Concurrent Apportionment Calculations
    • Process Complete Page of the Apportionment Calculation Wizard
    • Run Concurrent Apportionment Calculations
    • Apportionment Calculation Wizard
    • Add Apportionment Source Dialog Box
    • Apportionment Dialog Box
    • Run Page of the Apportionment Calculation Wizard
    • Apportionment Setup Steps
    • Calculation Range Page of the Apportionment Calculation Wizard
    • Create the Apportionment Definition
    • Apportionment
    • Apportionment Calculations
    • Apportionment Mapping Dialog Box
    • Perform Apportionment Calculations
    • Apportionment Mapping
    • Add Apportionment Target Dialog Box
    • Edit Apportionment Targets
    • Confirmation Page of the Apportionment Calculation Wizard
  • apportionment calculation wizard
    • Process Running Page of the Apportionment Calculation Wizard
    • Classes Page of the Apportionment Calculation Wizard
    • Project Selection Page of the Apportionment Calculation Wizard
    • Apportionment Calculation Wizard
    • Run Page of the Apportionment Calculation Wizard
    • Calculation Range Page of the Apportionment Calculation Wizard
    • Procedures
    • Perform Apportionment Calculations
    • Edit Apportionment Targets
    • Confirmation Page of the Apportionment Calculation Wizard
  • apportionment definition
    • Process Running Page of the Apportionment Calculation Wizard
    • Classes Page of the Apportionment Calculation Wizard
    • Perform Apportionment Mapping
    • Project Selection Page of the Apportionment Calculation Wizard
    • Process Running Page of the Integration Wizard
    • Process Complete Page of the Apportionment Calculation Wizard
    • Apportionment Calculation Wizard
    • Add Apportionment Source Dialog Box
    • Apportionment Dialog Box
    • Integration Wizard-Apportionment Definition and Mapping Data
    • Process Complete Page of the Integration Wizard
    • Apportionment Setup Steps
    • Calculation Range Page of the Apportionment Calculation Wizard
    • Create the Apportionment Definition
    • File Selection Page of the Integration Wizard
    • Apportionment
    • Apportionment Calculations
    • Data Import-Apportionment Definition
    • Apportionment Mapping Dialog Box
    • Edit Exported Data in Excel
    • Data Import-Apportionment Definition and Mapping Data
    • Perform Apportionment Calculations
    • Data Import-Apportionment Mapping
    • File Format for Importing Apportionment Definition
    • Apportionment Mapping
    • Add Apportionment Target Dialog Box
    • Edit Apportionment Targets
    • Integrate Apportionment Definition Process
    • Confirmation Page of the Apportionment Calculation Wizard
    • Confirmation Page of the Integration Wizard
  • apportionment dialog box
    • Display the Apportionment Dialog Box
    • Perform Apportionment Mapping
  • apportionment mapping
    • Process Running Page of the Apportionment Calculation Wizard
    • Classes Page of the Apportionment Calculation Wizard
    • Perform Apportionment Mapping
    • Project Selection Page of the Apportionment Calculation Wizard
    • Process Running Page of the Integration Wizard
    • Process Complete Page of the Apportionment Calculation Wizard
    • Apportionment Calculation Wizard
    • Add Apportionment Source Dialog Box
    • Apportionment Dialog Box
    • Integration Wizard-Apportionment Definition and Mapping Data
    • Process Complete Page of the Integration Wizard
    • Apportionment Setup Steps
    • Calculation Range Page of the Apportionment Calculation Wizard
    • Create the Apportionment Definition
    • File Selection Page of the Integration Wizard
    • Apportionment
    • Apportionment Calculations
    • Apportionment Mapping Dialog Box
    • Edit Exported Data in Excel
    • Data Import-Apportionment Definition and Mapping Data
    • Perform Apportionment Calculations
    • Data Import-Apportionment Mapping
    • File Format for Importing Apportionment Definition
    • Integrate Apportionment Mapping Process
    • Apportionment Mapping
    • Add Apportionment Target Dialog Box
    • Edit Apportionment Targets
    • Display the Apportionment Mapping Dialog Box
    • Confirmation Page of the Apportionment Calculation Wizard
    • Confirmation Page of the Integration Wizard
  • assignment export wizard
    • Resource Assignments Page of the Assignment Import/Assignment Export Wizard
    • Specify the Import Location for Resource Assignments
    • Export and Import Time-Phased Resource Assignments
    • Export Location Page of the Assignment Export Wizard
    • Specify the Export Location for Resource Assignments
    • Confirmation Page of the Assignment Import/Export Wizard
    • Process Running Page of the Assignment Import/Assignment Export Wizard
    • Assignment Import/Assignment Export
    • Assignment Import/Assignment Export Wizard
    • Rules for Importing Data
    • Process Complete Page of the Assignment Import/Assignment Export Wizard
    • Project Selection Page of the Assignment Import/Assignment Export Wizard
    • Log Comment Page of the Assignment Import/Assignment Export Wizard
  • assignment import
  • assignment import wizard
    • Resource Assignments Page of the Assignment Import/Assignment Export Wizard
    • Specify the Import Location for Resource Assignments
    • Export and Import Time-Phased Resource Assignments
    • Specify the Export Location for Resource Assignments
    • Confirmation Page of the Assignment Import/Export Wizard
    • Process Running Page of the Assignment Import/Assignment Export Wizard
    • Assignment Import/Assignment Export
    • Assignment Import/Assignment Export Wizard
    • Rules for Importing Data
    • Process Complete Page of the Assignment Import/Assignment Export Wizard
    • Import Location Page of the Assignment Import Wizard
    • Project Selection Page of the Assignment Import/Assignment Export Wizard
    • Log Comment Page of the Assignment Import/Assignment Export Wizard
  • audit log
    • Round off Audit Log Transactions
    • Audit Logging
  • audit logging
    • Log Transaction Page of the Project Audit Wizard
    • Project Selection Page of the Project Audit Wizard
    • Audit Log Comparison Page of the Project Audit Wizard
    • Process Running Page of the Project Audit Wizard
    • Project Audit Wizard
    • Process Complete Page of the Project Audit Wizard
    • Edit Comment and Change Number Page of the Project Audit Wizard
    • Turn Project Audit On or Off
    • Edit the Project Audit Log
    • Prompt Level Page of the Project Audit Wizard
    • Round off Audit Log Transactions
    • Reset the Baseline Using the Project Audit Wizard
    • Audit Logging
    • Log Comment Page of the Project Audit Wizard
    • Update Transaction Changes
    • Log Operation Page of the Project Audit Wizard
    • Set Project Baseline Page of the Project Audit Wizard
    • Log Significant Changes for IPMR Format 3 Reports
    • Reconcile Project Logs Using the Project Audit Wizard
    • Project Audit Logging
    • Confirmation Page of the Project Audit Wizard
    • Procedures
  • backup
    • Data Access Tab of the Application Preferences Dialog Box
    • SQL Command Utility
    • Backup Dialog Box
    • Restore Process
    • Back Up Your Data
    • File Backup
    • Backup Dialog Box
    • Backup Project Process
    • Log SQL Statements in ClientDebugLog.xml
    • Custom Project Tables
    • Select Files to Restore Dialog Box
    • Process Logs Dialog Box
    • Log SQL Statements in ServerDebugLog.xml
    • Report Templates
  • backup dialog box
    • Display the Backup Dialog Box
    • Display the Backup Dialog Box
  • baseline
    • Milestones/Steps
    • Log Transaction Page of the Project Audit Wizard
    • Progress Page of the Integration Wizard-Scheduling Tools
    • Add Work Package Dialog Box
    • Project Selection Page of the Project Audit Wizard
    • Spread Curves Tab of the Application Preferences Dialog Box
    • Initialize Forecast Process
    • Date Selection Page of the Integration Wizard-MS Project
    • Spreadsheet Pane of the Project View
    • Process Running Page of the Project Audit Wizard
    • Baseline Tags
    • Progress Techniques
    • Replan Preferences
    • Project and Apportionment Validations Page of the Validity Check Wizard
    • Date Selection Page of the Integration Wizard-Open Plan
    • Change Control Page of the Integration Wizard
    • Edit Comment and Change Number Page of the Project Audit Wizard
    • Sub-Projects Validation Dialog Box
    • EPM Security Administrator Functions
    • Add Control Account Dialog Box
    • Schedule Mapping Page of the Integration Wizard-Primavera
    • Project Dates Page of the New Project Wizard
    • Resource Assignments Page of the Integration Wizard-Files
    • Display the New Project Wizard
    • Resource-Loaded Schedule
    • Calculate Progress
    • General Tab of the Classes Tab
    • Classes Tab of the Project Properties Dialog Box
    • How Cobra Calculates Progress to Determine Earned Value
    • Progress Techniques
    • Custom Cost Classes
    • Milestone Tags
    • Report Types
    • Advance Calendar
    • Preparing the Open Plan Schedule
    • Guidelines for Accurate Earned Value Management
    • Preparing Cobra for Schedule Integration
    • Log Operation Page of the Project Audit Wizard
    • Open Plan Fields Imported
    • Set Project Baseline Page of the Project Audit Wizard
    • Log Significant Changes for IPMR Format 3 Reports
    • Integration Wizard Preferences
    • Schedule Mapping Page of the Integration Wizard-Open Plan
    • Options Page of the Replan Wizard
    • Change Management Tags
    • Process Lock
    • Milestones/Steps Tab of the Project View
    • Resource-Loaded Schedule
    • Date Selection Page of the Integration Wizard-Primavera
    • Set Up Projects and Project Baselines
    • Reconcile Milestone Weight Variance Dialog Box
    • Fields Page of the New Project Wizard
  • baseline dates
    • Budget Pending Dates
    • Secure Baseline Dates
  • basic operations
  • basic procedures
    • Size a Column for Best Fit
    • Freeze Columns in a View
    • Rename an Ancillary File
    • Log Onto Cobra
    • Cobra Views
    • Remove a Column from a View
    • Find Text
    • Save a Project as a Different Project
    • Log Onto Cobra Using a Different User ID
    • Insert a Column in a View
    • Basic Procedures
    • Edit a Column in a View
    • Find Numeric Data
    • Save an Ancillary File as a Different File
    • Change Your Password
    • Copy the Projects Pane or the Spreadsheet Pane to Excel
    • Manage Columns
    • Adjust Column Width
    • Rename a Project
  • batch process
    • Process Log Viewer
    • Run the Rolling Wave Process
  • batch report
    • Copy Batch Report Dialog Box
    • Run Batch Reports
    • Batch Report Process
    • Batch Reports Pane
    • Access Control Tab of the Add Batch Report Dialog Box
    • Procedures
    • Batch Reports Dialog Box
    • Display the Copy Batch Report Dialog Box
    • Edit Batch Report Dialog Box
    • General Tab of the Edit Batch Report Dialog Box
    • Access Control Tab of the Edit Batch Report Dialog Box
    • Included Reports Tab of the Add Batch Report Dialog Box
    • Batch Reports
    • Included Reports Tab of the Edit Batch Report Dialog Box
    • Display the Add Batch Report Dialog Box
    • Display the Edit Batch Report Dialog Box
    • General Tab of the Add Batch Report Dialog Box
    • Add Batch Report Dialog Box
  • batch reports dialog box
  • batch reports pane
    • Batch Reports Pane Column Definitions
    • Shortcut Menu
  • bcr analysis
  • budget
    • Resource Assignments Page of the Assignment Import/Assignment Export Wizard
    • Milestones/Steps
    • Class Settings Page for Actuals Class of the New Class Wizard
    • Application Preferences
    • Code Files
    • Resource Assignment Percent Complete Dialog Box
    • Log Transaction Page of the Project Audit Wizard
    • Associate a Budget Class with a Forecast Actual or Earned Class
    • Progress Page of the Integration Wizard-Scheduling Tools
    • Project Selection Page of the Project Audit Wizard
    • Spread Curves Tab of the Application Preferences Dialog Box
    • Preparing the Primavera Schedule
    • Settings Page of the New Project Wizard
    • Date Selection Page of the Integration Wizard-MS Project
    • Action Selection Page of the Integration Wizard
    • Resource Assignments Page of the Integration Wizard-Open Plan
    • Examples of Manual Forecast Calculations
    • Spreadsheet Pane of the Project View
    • Audit Reports
    • Baseline Tags
    • Perform Apportionment Mapping
    • Thresholds Tab of the Code File Properties Dialog Box
    • Budget Pending Dates
    • Method Page of the Replan Wizard
    • Progress Techniques
    • Reconcile Budgets and Forecasts
    • Spread Budgets Using Pre-defined Spread Methods
    • Thresholds Tab of the Code View
    • Variance Thresholds
    • Project Selection Page of the Respread Wizard
    • Reporting
    • Thresholds Page of the New Code File Wizard
    • Apportionment Definition Tab of the Resource View
    • Projects
    • Replan Preferences
    • Project and Apportionment Validations Page of the Validity Check Wizard
    • Integration Configuration Page of the Integration Wizard
    • Progress Page of the Integration Wizard-Files
    • Status Page of the Integration Wizard-Scheduling Tools
    • Date Selection Page of the Integration Wizard-Open Plan
    • Change Control Page of the Integration Wizard
    • General Tab of the Application Preferences Dialog Box
    • Included Actual Classes Tab of the Classes Tab
    • Statistical Forecasts
    • Include in Actuals Cost Set Page of the New Class Wizard
    • EPM Security Administrator Functions
    • Status Page of the Integration Wizard-Files
    • Prompt Level Page of the Project Audit Wizard
    • Spreadsheet Pane Column Definitions
    • Resources
    • General Information Page of the New Class Wizard
    • Spread Updated Budgets for Resources
    • Examples of Forecast Calculations
    • Apportionment Setup Steps
    • Resource Assignments Page of the Integration Wizard-Files
    • Display the New Project Wizard
    • Resource-Loaded Schedule
    • Calendars
    • Variance Thresholds
    • Data Import-Budget Data
    • Calculate Progress
    • General Tab of the Classes Tab
    • Add a Resource Assignment
    • Import File Validation
    • Classes Tab of the Project Properties Dialog Box
    • Project Selection Page of the Reclass Wizard
    • Set Up a Retain EAC Forecast with the Scale EAC Option
    • How Cobra Calculates Progress to Determine Earned Value
    • Progress Techniques
    • General Information Page of the New Calendar File Wizard
    • Custom Cost Classes
    • Assign a Calendar Set to a Forecast or Budget Class
    • Multiproject Operations (Master and Subprojects)
    • Apportionment Process
    • Class Information Tags
    • How Cobra Spreads ETC
    • Target Class Page of the Reclass Wizard
    • Integration Configuration Page of the Integration Wizard
    • Data Import Using Scheduling Tools and Files
    • Sample Earned Value Calculation
    • Integration Configuration Page of the Integration Wizard
    • Advance Calendar
    • Preparing the Open Plan Schedule
    • Guidelines for Accurate Earned Value Management
    • Preparing Cobra for Schedule Integration
    • Thresholds Page of the New Resource File Wizard
    • Resource Assignments
    • Include in EAC Cost Set Page of the New Class Wizard
    • Forecast Calculations
    • Notes Tab of the Resource View
    • Import Budget Data into Cobra
    • Log Operation Page of the Project Audit Wizard
    • Log Change Comment Dialog Box
    • Reclass Preferences
    • Set Project Baseline Page of the Project Audit Wizard
    • Adjust Budget Spreads Manually
    • Log Significant Changes for IPMR Format 3 Reports
    • Reconcile Milestone Weights
    • wInsight Database Page of the wInsight Wizard
    • Integration Wizard Preferences
    • Assign a Budget Source to a Budget Class
    • Element of Cost Page of the wInsight Wizard
    • Recalc
    • Options Page of the Replan Wizard
    • Spread Curve Dialog Box
    • Change Management Tags
    • Cobra 8.4 Help System
    • Planning Reports
    • Examples of Statistical Forecast Calculations
    • Take your Implementation a Step Further
    • Thresholds Tab of the Resource View
    • Earned Preferences
    • Status Page of the Integration Wizard
    • Confirmation Page of the Respread Wizard
    • Resources
    • Project Selection Page of the Top-Down Planning Wizard
    • Process Lock
    • Milestones/Steps Tab of the Project View
    • Options Page of the Calculate Forecast Wizard
    • Classes Page of the Respread Wizard
    • Update Totals Process
    • Enter Budget Information
    • Include in Budget Cost Set Page of the New Class Wizard
    • Resource-Loaded Schedule
    • Included Budget Classes Tab of the Classes Tab
    • Results Pane of the Analyze Form
    • Calendar Sets
    • Resource Components
    • Column Reports
    • Time-phased Reports
    • Status File Field Mapper Page of the Integration Wizard
    • Date Selection Page of the Integration Wizard-Primavera
    • Options Page of the ANSI EIA X12 Wizard
    • Manual Forecasts
    • Copy Budget to a Manual Forecast Using the Reclass Wizard
    • Set Up Projects and Project Baselines
    • Reclass a Class
    • Reconcile Milestone Weight Variance Dialog Box
    • Fields Page of the New Project Wizard
  • budget planning
  • business validations page
  • calculate apportionment wizard
    • Resource Assignments Page of the Integration Wizard-Open Plan
    • Perform Apportionment Mapping
    • Process Complete Page of the Apportionment Calculation Wizard
    • Add Apportionment Source Dialog Box
    • Apportionment Dialog Box
    • Apportionment Setup Steps
    • Create the Apportionment Definition
    • Apportionment
    • Apportionment Calculations
    • Apportionment Mapping Dialog Box
    • Apportionment Mapping
    • Add Apportionment Target Dialog Box
    • Confirmation Page of the Apportionment Calculation Wizard
  • calculate earned value wizard
  • calculate forecast
    • Examples of Manual Forecast Calculations
    • Calculate Forecast Process
    • Supported Processes, Operations, and Data
    • Examples of Forecast Calculations
    • Using Spread
    • How Cobra Spreads ETC
    • Forecast Calculations
    • Run Page of the Calculate Forecast Wizard
    • Examples of Statistical Forecast Calculations
    • Concurrent Forecast Calculations
    • Cobra Web Service
    • Run Concurrent Forecast Calculations
  • calculate forecast wizard
    • Calculate Forecast
    • Export Time-Phased Resource Assignments to Excel
    • Process Running Page of the Calculate Forecast Wizard
    • Import Time-Phased Resource Assignments from Excel
    • Process Complete Page of the Calculate Forecast Wizard
    • Statistical Forecasts
    • Procedures
    • Project Selection Page of the Calculate Forecast Wizard
    • Manual Performance Factors Page of the Calculate Forecast Wizard
    • Set Up a Retain EAC Forecast with the Scale EAC Option
    • Run Page of the Calculate Forecast Wizard
    • Calculate Forecast Wizard
    • Frozen Forecasts
    • Create a Forecast
    • Retain EAC
    • Confirmation Page of the Calculate Forecast Wizard
    • Forecasts
    • Forecast Class Selection Page of the Calculate Forecast Wizard
    • Options Page of the Calculate Forecast Wizard
    • Manual Forecasts
    • Copy Budget to a Manual Forecast Using the Reclass Wizard
  • calculate hours
  • calculate progress
    • Progressing
    • Add a Second Earned Value Class to Your Project
    • Select the Earned Value Method
    • Calculate Progress Process
    • Assign a Progress Technique to a Work Package
    • Confirmation Page of the Calculate Progress Wizard
    • Calculate Progress using the Calculated Apportionment Progress Technique
    • Method Page of the Replan Wizard
    • Calculate Progress
    • General Tab of the Application Preferences Dialog Box
    • Confirmation Page of the Replan Wizard
    • Supported Processes, Operations, and Data
    • Select the Level at Which to Capture Actual Costs
    • Apportionment Setup Steps
    • Calculate Progress
    • Run Page of the Calculate Progress Wizard
    • How Cobra Calculates Progress to Determine Earned Value
    • Sample Earned Value Calculation
    • Concurrent Progress Calculations
    • Run Concurrent Progress Calculations
    • Cobra Web Service
    • Select the Level at Which to Capture Actual Costs
  • calculate progress wizard
    • Add a Second Earned Value Class to Your Project
    • Select the Earned Value Method
    • Confirmation Page of the Calculate Progress Wizard
    • Calculate Progress Wizard
    • Options Page of the Calculate Progress Wizard
    • Select the Level at Which to Capture Actual Costs
    • Calculate Progress
    • Process Running Page of the Calculate Progress Wizard
    • Possible Sources of Errors
    • Project Selection Page of the Calculate Progress Wizard
    • Process Complete Page of the Calculate Progress Wizard
    • Select the Level at Which to Capture Actual Costs
  • calculate results wizard
  • calculated apportionment
  • calculated fields
    • Procedures
    • Calculated Fields
    • Create Calculated Fields
    • New Calculated Field Dialog Box
    • Calculated Field Expression Dialog Box
    • Calculated Fields Dialog Box
    • Fields Dialog Box
    • Considerations When Creating Field Names
  • calculated result wizard
    • Results Page of the Report Wizard
    • Open Dialog Box of the Calculated Results Wizard
    • Copy Calculated Result Dialog Box of the Calculated Results Wizard
  • calculated results
    • Calculated Results
    • Calculated Results Dialog Box
    • Create a Calculated Result
    • Display the Calculated Results Wizard
  • calculated results wizard
  • calculation
    • Data Tool
    • Milestones/Steps
    • Code Files
    • Preparing the Primavera Schedule
    • Resource Assignments Page of the Integration Wizard-Open Plan
    • Examples of Manual Forecast Calculations
    • Perform Apportionment Mapping
    • Sub-Totals Page of the Report Wizard
    • Calculations Tab of the Resource View
    • Apportionment Definition Tab of the Resource View
    • Projects
    • Integration Wizard
    • Calculated Results
    • General Tab of the Application Preferences Dialog Box
    • Files Tab of the Project Properties Dialog Box
    • Statistical Forecasts
    • Sub-Projects Validation Dialog Box
    • Include in Actuals Cost Set Page of the New Class Wizard
    • Resources and Rates Page of the Integration Wizard
    • Report Categories
    • Manual Performance Factors Page of the Calculate Forecast Wizard
    • Ancillary File Validations Page of the Validity Check Wizard
    • Resources
    • Data Import-Ancillary Data
    • Examples of Forecast Calculations
    • Apportionment Setup Steps
    • Resource Assignments Page of the Integration Wizard-Files
    • Resource-Loaded Schedule
    • Delete a Result from a Resource
    • Calculate Progress
    • General Tab of the Classes Tab
    • Classes Tab of the Project Properties Dialog Box
    • File Selection Page of the Integration Wizard
    • How Cobra Calculates Progress to Determine Earned Value
    • Custom Cost Classes
    • Order Resource Results Dialog Box
    • Apportionment Process
    • Add Results to a Resource
    • How Cobra Spreads ETC
    • Assign a Rate Set to a Result
    • Sample Earned Value Calculation
    • Preparing the Open Plan Schedule
    • Guidelines for Accurate Earned Value Management
    • Preparing Cobra for Schedule Integration
    • Results Tab of the Resource File Properties Dialog Box
    • Forecast Calculations
    • Template Resource Files
    • Open Plan Fields Imported
    • Resources and Code Files
    • Retain EAC
    • Examples of Statistical Forecast Calculations
    • Earned Preferences
    • Resource Calculation Tags
    • Resources
    • Copy Resource Calculations Dialog Box
    • Process Lock
    • Options Page of the Calculate Forecast Wizard
    • Confirmation Page of the Apportionment Calculation Wizard
    • Process Logs Dialog Box
    • Resource-Loaded Schedule
    • Data Formats
    • Resource Components
    • Shortcut Menu
    • Add Resource Results Dialog Box
    • Status File Field Mapper Page of the Integration Wizard
    • Results or Field Names
  • calculation page
  • calculations tab
    • Procedures
    • Calculations Tab of the Resource View
    • Add Calculations to a Resource
    • Delete a Result from a Resource
    • Order Resource Results Dialog Box
    • Copy Calculations from Another Resource
    • Add Results to a Resource
    • Assign a Rate Set to a Result
    • Copy Resource Calculations Dialog Box
    • Resource Components
    • Add Resource Results Dialog Box
  • calendar
    • Access Control Tab of the Calendar File Properties Dialog Box
    • Add Work Package Dialog Box
    • Process Complete Page of the Rolling Wave Wizard
    • Spread Curves Tab of the Application Preferences Dialog Box
    • Report Template Format
    • Settings Page of the New Project Wizard
    • Project Selection Page of the Advance Calendar Wizard
    • Delete Project Process
    • Process Running Page of the Advance Calendar Wizard
    • Copy Control Account Dialog Box
    • Calendar Page of the Report Wizard
    • Advance to Period Page of the Advance Calendar Wizard
    • Validity Check Process
    • Process Complete Page of the Export Calendar to Open Plan Wizard
    • Rename an Ancillary File
    • Project Selection Page of the Respread Wizard
    • Reporting
    • General Information Page of the New Project Wizard
    • Projects
    • Process Running Page of the Export Calendar to Open Plan Wizard
    • Delete Calendar Sets
    • Integration Wizard
    • Edit Comment and Change Number Page of the Project Audit Wizard
    • Calendars Section of the XML File
    • Calculate Hours Dialog Box
    • Files Tab of the Project Properties Dialog Box
    • Calendar Periods Tab of the Calendar View
    • Edit Calendar Sets
    • Sub-Projects Validation Dialog Box
    • Report Wizard
    • Add Control Account Dialog Box
    • Report Categories
    • Ancillary File Validations Page of the Validity Check Wizard
    • Project Dates Page of the New Project Wizard
    • Data Import-Ancillary Data
    • Miscellaneous Page of the wInsight Wizard
    • Resource-Loaded Schedule
    • Calendars
    • Required Template Files
    • Save As Dialog Box (Ancillary Files)
    • Manage Sorts Dialog Box of the Report Wizard
    • General Tab of the Classes Tab
    • Add a Resource Assignment
    • Classes Tab of the Project Properties Dialog Box
    • File Selection Page of the Integration Wizard
    • Confirmation Page of the New Calendar File Wizard
    • Set the TODATE Period
    • General Information Page of the New Calendar File Wizard
    • Custom Cost Classes
    • Assign a Calendar Set to a Forecast or Budget Class
    • Multiproject Operations (Master and Subprojects)
    • Open File Dialog Box
    • Apportionment Process
    • Process Running Page of the Export Calendar to Open Plan Wizard
    • Open File Dialog Box
    • Class Information Tags
    • Run the Rolling Wave Process Without Advancing the Calendar
    • Report Types
    • Target Class Page of the Reclass Wizard
    • XML Configuration File
    • Lookup Dialog Box
    • Advance Calendar
    • Preparing the Open Plan Schedule
    • Preparing Cobra for Schedule Integration
    • Calendar Page of the Integration Wizard
    • Purge Dialog Box
    • Cobra Components
    • Flag Periods
    • Extend the Calendar Periods
    • Periods Page of the New Calendar File Wizard
    • Configure Calendar Set 19 for IPMR Reports, wInsight Integration, and Cost Data Export/DCDE Format
    • Confirmation Page of the Advance Calendar Wizard
    • Save As Dialog Box (Projects)
    • Process Complete Page of the Advance Calendar Wizard
    • Copy Project Process
    • Enable a Group to Access a Calendar File
    • Element of Cost Page of the wInsight Wizard
    • Additional Project Files
    • New File Dialog Box
    • Delete an Existing Holiday from the Calendar
    • Run the Rolling Wave Process Without Advancing the Calendar
    • Save As Dialog Box (Projects)
    • Advance Calendar Process
    • New File Dialog Box
    • Edit Calendar Set Dialog Box
    • Process Lock
    • Run the Rolling Wave Process
    • Process Logs Dialog Box
    • Resource-Loaded Schedule
    • Calendar View
    • Advance the Calendar
    • Calendar Selection Page of the Export Calendar to Open Plan Wizard
    • Included Budget Classes Tab of the Classes Tab
    • Date Range Page of the Recalc Wizard
    • Save As Dialog Box (Ancillary Files)
    • Period Labels Page of the New Calendar File Wizard
    • Calendar Sets
    • Rename a Project
    • Options Page of the Advance Calendar Wizard
    • Ancillary Files Page of the New Project Wizard
    • Time-phased Reports
    • Confirmation Page of the Export Calendar to Open Plan Wizard
    • Options Page of the ANSI EIA X12 Wizard
    • Manual Forecasts
  • calendar edit tab
  • calendar file
  • calendar file properties
    • Calendar File Properties Dialog Box
    • Display the Calendar File Properties Dialog Box Tabs from an Open Calendar File
    • Display the Calendar File Properties Dialog Box Tabs without Opening a Calendar File
  • calendar file properties dialog box
    • Access Control Tab of the Calendar File Properties Dialog Box
    • Enable a Group to Access a Calendar File
    • Procedures
    • General Tab of the Calendar File Properties Dialog Box
  • calendar page
    • Calendar Page of the Report Wizard
    • Calendar Page of the Integration Wizard
  • calendar periods
    • Procedures
    • Extend the Calendar Periods
    • Calendar Periods
  • calendar set
    • Add Calendar Set Dialog Box
    • Report Template Format
    • Reporting
    • Delete Calendar Sets
    • Calculate Hours Dialog Box
    • Edit Calendar Sets
    • Sub-Projects Validation Dialog Box
    • Report Wizard
    • Ancillary File Validations Page of the Validity Check Wizard
    • Calendars
    • Add Calendar Sets
    • General Tab of the Classes Tab
    • Classes Tab of the Project Properties Dialog Box
    • General Information Page of the New Calendar File Wizard
    • Custom Cost Classes
    • Assign a Calendar Set to a Forecast or Budget Class
    • Class Information Tags
    • Target Class Page of the Reclass Wizard
    • XML Configuration File
    • Calendar Sets Tab of the Calendar View
    • Advance Calendar
    • Calendar Page of the Integration Wizard
    • Flag Periods
    • Element of Cost Page of the wInsight Wizard
    • Advance Calendar Process
    • Edit Calendar Set Dialog Box
    • Calendar View
    • Included Budget Classes Tab of the Classes Tab
    • Date Range Page of the Recalc Wizard
    • Period Labels Page of the New Calendar File Wizard
    • Calendar Sets
    • Time-phased Reports
  • calendar sets
  • calendar view
    • Add Calendar Set Dialog Box
    • Access Control Tab of the Calendar File Properties Dialog Box
    • Calculate Hours for a Calendar
    • Add Calendar Periods
    • Delete Calendar Sets
    • Delete Calendar Periods
    • Calculate Hours Dialog Box
    • Calendar Periods Tab of the Calendar View
    • Edit Calendar Sets
    • Flag Periods Dialog Box
    • Set the TODATE Period
    • Calendar Sets Tab of the Calendar View
    • Add Holidays to a Calendar
    • Flag Periods
    • Display the Calendar View using the Cobra Button
    • Enable a Group to Access a Calendar File
    • Delete an Existing Holiday from the Calendar
    • Edit Calendar Set Dialog Box
    • Procedures
    • Calendar View
    • Shortcut Menu
    • Generate Calendar Periods
    • Display the Calendar View using the Calendars Group Bar
  • calendars
    • Add Calendar Set Dialog Box
    • Calculate Hours for a Calendar
    • Add Calendar Periods
    • Generate Periods Dialog Box
    • Delete Calendar Periods
    • When Calendar Dates Change
    • Flag Periods Dialog Box
    • Assigning a Calendar to a Project
    • Add Calendar Sets
    • Access Control Page of the New Calendar File Wizard
    • Calendar Sets Tab of the Calendar View
    • Add Holidays to a Calendar
    • Calendar Periods
    • Enable a User to Access a Calendar File
    • Rolling Wave Process or Weekly Earned Value
    • Calendars
    • General Tab of the Calendar File Properties Dialog Box
    • Shortcut Menu
    • Generate Calendar Periods
  • calendars pane
    • Calendars Pane Column Definitions
    • Shortcut Menu
  • cam
    • Import File Field Mapper Page of the Integration Wizard
    • Criteria Page of the Replan Wizard
    • Schedule Mapping Page of the Integration Wizard-Primavera
    • Criteria Selection Page of the Respread Wizard
    • Criteria Selection Page of the Recalc Wizard
    • Criteria Selection Page of the Update Codes Wizard
    • Schedule Mapping Page of the Integration Wizard-Open Plan
    • General Tab of the Project View
    • Criteria Page of the Reclass Wizard
    • Criteria Selection Page of the Top-Down Planning Wizard
    • Schedule Mapping Page of the Integration Wizard-MS Project
  • change control page
  • change owner
    • Change Owner Dialog Box
    • Display the Change Ownership and Access Rights Dialog Box
    • Display the Change Owner Dialog Box
    • Procedures
    • Change Ownership and Access Rights
    • Change Ownership and Access Rights Dialog Box
    • Display the Change Ownership and Access Rights Dialog Box
    • Change Ownership and Access Rights Dialog Box
    • Change the Owner of an Object
    • Change Access Rights Dialog Box
    • Change the Access Rights of an Object
  • change password
    • Display the Change Password Dialog Box
    • Display the Change Password Dialog Box
  • chart
    • Code Files
    • Analyze Preferences
    • Report Template Format
    • Create Graph Reports from the Analyze Form
    • Analyze Options Dialog Box
    • Reporting
    • Report Categories
    • Report Templates
  • citrix
  • class
    • Resource Assignments Page of the Assignment Import/Assignment Export Wizard
    • Import File Field Mapper Page of the Integration Wizard
    • Class Settings Page for Actuals Class of the New Class Wizard
    • Add a Second Earned Value Class to Your Project
    • Forecast Class Page of the New Class Wizard
    • Resource Assignment Percent Complete Dialog Box
    • Associate a Budget Class with a Forecast Actual or Earned Class
    • Preparing the Primavera Schedule
    • Delete a Cost Set
    • Initialize Forecast Process
    • Resource Assignments Page of the Integration Wizard-Open Plan
    • Get Cobra Spread Process
    • Validity Check Process
    • Copy Classes Dialog Box
    • Display the New Class Wizard
    • Class and Results Page of the Integration Wizard
    • Merge Sub-Projects into a New Project
    • General Information Page of the New Project Wizard
    • Replan Preferences
    • Project and Apportionment Validations Page of the Validity Check Wizard
    • Status Page of the Integration Wizard-Scheduling Tools
    • Change Control Page of the Integration Wizard
    • Cost Set Information Tags
    • General Tab of the Application Preferences Dialog Box
    • Export Structures Page of the wInsight Wizard
    • Included Actual Classes Tab of the Classes Tab
    • The Field Mapper
    • Files Tab of the Project Properties Dialog Box
    • Field Mapper Page of the Integration Wizard
    • Sub-Projects Validation Dialog Box
    • Procedures
    • Merge Sub-Projects into a New Project
    • Report Wizard
    • Include in Actuals Cost Set Page of the New Class Wizard
    • Copy Cost Sets Dialog Box
    • Project Selection Page of the Calculate Forecast Wizard
    • Status Page of the Integration Wizard-Files
    • Recalc Preferences
    • Manual Performance Factors Page of the Calculate Forecast Wizard
    • Supported Processes, Operations, and Data
    • Ancillary File Validations Page of the Validity Check Wizard
    • Create a New Class
    • Assign a Forecast Method to a Forecast Class
    • General Information Page of the New Class Wizard
    • Apportionment Setup Steps
    • Resource Assignments Page of the Integration Wizard-Files
    • Class Settings Page for Budget Class of the New Class Wizard
    • Display the New Project Wizard
    • Calendars
    • Cost Sets Page of the Report Wizard
    • Calculate Progress
    • Associate an Earned Value Class with a Forecast Class
    • General Tab of the Classes Tab
    • Class Overview
    • Classes Tab of the Project Properties Dialog Box
    • Project Selection Page of the Reclass Wizard
    • Set Up a Retain EAC Forecast with the Scale EAC Option
    • Project Selection Page of the Freeze Forecast Wizard
    • How Cobra Calculates Progress to Determine Earned Value
    • Connecting to the Cobra Web Service Host
    • Custom Cost Classes
    • Assign a Calendar Set to a Forecast or Budget Class
    • Confirmation Page of the New Class Wizard
    • Procedures
    • Apportionment Process
    • Class Information Tags
    • Procedures
    • Target Class Page of the Reclass Wizard
    • Class Settings Page for Forecast Class of the New Class Wizard
    • Copy Existing Cost Sets to a Project
    • XML Configuration File
    • Preparing the Open Plan Schedule
    • Preparing Cobra for Schedule Integration
    • Control Account Fields Versus Codes
    • Class Settings Page for Earned Class of the New Class Wizard
    • Include in Earned Cost Set Page of the New Class Wizard
    • Resource Assignments
    • Include in EAC Cost Set Page of the New Class Wizard
    • Procedures
    • Purge Dialog Box
    • Included Earned Classes Tab of the Classes Tab
    • Log Change Comment Dialog Box
    • Running the Process or Operation
    • Create a New Cost Set
    • Reclass Preferences
    • Creating Service Operations Classes
    • Data Anomaly Validations Page of the Validity Check Wizard
    • Set Project Baseline Page of the Project Audit Wizard
    • Procedures
    • Integration Wizard Preferences
    • Assign a Budget Source to a Budget Class
    • New Class Wizard
    • Recalc
    • Frozen Forecasts
    • Options Page of the Replan Wizard
    • XML Configuration Object Interface
    • Assign a Rate File to a Forecast Actual or Budget Class
    • Classes and Cost Sets
    • Status Page of the Integration Wizard
    • Project Selection Page of the Top-Down Planning Wizard
    • Cobra Web Service
    • Filter by Classes or Cost Sets
    • Default Rates Page of the New Resource File Wizard
    • Process Lock
    • Options Page of the Calculate Forecast Wizard
    • Cost Sets Tab of the Project Properties Dialog Box
    • Entering Actual Costs Manually
    • Classes Page of the Respread Wizard
    • Include in Budget Cost Set Page of the New Class Wizard
    • Included Budget Classes Tab of the Classes Tab
    • Cost Sets Page of the Freeze Forecast Wizard
    • Procedures
    • Calendar Sets
    • Associate an Actual Class with a Forecast Class
    • Resource Components
    • Ancillary Files Page of the New Project Wizard
    • Status File Field Mapper Page of the Integration Wizard
    • Control Account Versus Work Package Level
    • Included Costs Page of the Integration Wizard
    • Manual Forecasts
    • Copy Budget to a Manual Forecast Using the Reclass Wizard
    • Reclass a Class
    • Fields Page of the New Project Wizard
  • class settings page
    • Class Settings Page for Actuals Class of the New Class Wizard
    • Class Settings Page for Budget Class of the New Class Wizard
    • Class Settings Page for Forecast Class of the New Class Wizard
    • Class Settings Page for Earned Class of the New Class Wizard
  • classes and cost sets
    • Class Settings Page for Actuals Class of the New Class Wizard
    • Forecast Class Page of the New Class Wizard
    • Associate a Budget Class with a Forecast Actual or Earned Class
    • Delete a Cost Set
    • Copy Classes Dialog Box
    • Display the New Class Wizard
    • Included Actual Classes Tab of the Classes Tab
    • Procedures
    • Include in Actuals Cost Set Page of the New Class Wizard
    • Copy Cost Sets Dialog Box
    • Create a New Class
    • Assign a Forecast Method to a Forecast Class
    • Class Settings Page for Budget Class of the New Class Wizard
    • Associate an Earned Value Class with a Forecast Class
    • General Tab of the Classes Tab
    • Custom Cost Classes
    • Assign a Calendar Set to a Forecast or Budget Class
    • Confirmation Page of the New Class Wizard
    • Procedures
    • Procedures
    • Class Settings Page for Forecast Class of the New Class Wizard
    • Copy Existing Cost Sets to a Project
    • Class Settings Page for Earned Class of the New Class Wizard
    • Include in Earned Cost Set Page of the New Class Wizard
    • Include in EAC Cost Set Page of the New Class Wizard
    • Procedures
    • Included Earned Classes Tab of the Classes Tab
    • Create a New Cost Set
    • Procedures
    • Assign a Budget Source to a Budget Class
    • New Class Wizard
    • Assign a Rate File to a Forecast Actual or Budget Class
    • Include in Budget Cost Set Page of the New Class Wizard
    • Procedures
    • Associate an Actual Class with a Forecast Class
  • classes and cost sets
  • classes page
    • Classes Page of the Apportionment Calculation Wizard
    • Resource Assignments Page of the Integration Wizard-Open Plan
    • Classes Page of the Zero-Out Data Wizard
    • Resource Assignments Page of the Integration Wizard-Files
    • Target Class Page of the Reclass Wizard
    • Classes Page of the Top-Down Planning Wizard
    • Classes Page of the Respread Wizard
    • Classes Page of the Recalc Wizard
  • classes tab
    • Class Settings Page for Actuals Class of the New Class Wizard
    • Forecast Class Page of the New Class Wizard
    • Associate a Budget Class with a Forecast Actual or Earned Class
    • Delete a Cost Set
    • Copy Classes Dialog Box
    • Display the New Class Wizard
    • Included Actual Classes Tab of the Classes Tab
    • Procedures
    • Include in Actuals Cost Set Page of the New Class Wizard
    • Copy Cost Sets Dialog Box
    • Create a New Class
    • Assign a Forecast Method to a Forecast Class
    • General Information Page of the New Class Wizard
    • Class Settings Page for Budget Class of the New Class Wizard
    • Calculate Progress
    • Associate an Earned Value Class with a Forecast Class
    • General Tab of the Classes Tab
    • Class Overview
    • Classes Tab of the Project Properties Dialog Box
    • Custom Cost Classes
    • Assign a Calendar Set to a Forecast or Budget Class
    • Confirmation Page of the New Class Wizard
    • Procedures
    • Procedures
    • Class Settings Page for Forecast Class of the New Class Wizard
    • Copy Existing Cost Sets to a Project
    • Class Settings Page for Earned Class of the New Class Wizard
    • Include in Earned Cost Set Page of the New Class Wizard
    • Include in EAC Cost Set Page of the New Class Wizard
    • Procedures
    • Included Earned Classes Tab of the Classes Tab
    • Create a New Cost Set
    • Procedures
    • Assign a Budget Source to a Budget Class
    • New Class Wizard
    • Assign a Rate File to a Forecast Actual or Budget Class
    • Include in Budget Cost Set Page of the New Class Wizard
    • Included Budget Classes Tab of the Classes Tab
    • Procedures
    • Associate an Actual Class with a Forecast Class
  • cobra
    • Set Cobra to Always Run as an Administrator
    • Launching Cobra
  • cobra button
    • Keyboard Shortcuts
    • Preferences
    • Cobra Button
    • Manage
    • Help
  • cobra explorer
    • Code Assignments Tab of the Project Properties Dialog Box
    • Class Settings Page for Actuals Class of the New Class Wizard
    • Confirmation Page of the New Project Wizard
    • Criteria Page of the Slip Wizard
    • Enable a User to Access a Resource File
    • Insert Column Dialog Box
    • Process Running Page of the Apportionment Calculation Wizard
    • Edit Tab of the Rate View
    • Process Running Page of the Reclass Wizard
    • Processes Tab
    • Access Control Tab of the Calendar File Properties Dialog Box
    • Associate a Budget Class with a Forecast Actual or Earned Class
    • Color Band
    • Rename Dialog Box
    • Process Complete Page of the Rolling Wave Wizard
    • Reorder Resources
    • Analyze Preferences
    • Delete a Cost Set
    • Process Complete Page of the Replan Wizard
    • Work Package Name Page of the Replan Wizard
    • Settings Page of the New Project Wizard
    • Project Selection Page of the Advance Calendar Wizard
    • Confirmation Page of the Calculate Progress Wizard
    • Confirmation Page of the New Resource File Wizard
    • Copy Project Codes Dialog Box
    • Spreadsheet Pane of the Project View
    • Perform Apportionment Mapping
    • Add a Child Resource to a Resource
    • Quick Access Toolbar
    • Copy Preferences Dialog Box
    • Process Running Page of the Advance Calendar Wizard
    • Thresholds Tab of the Code File Properties Dialog Box
    • Process Running Page of the Calculate Forecast Wizard
    • Projects Pane Column Definitions
    • Process Running Page of the Replan Wizard
    • Method Page of the Replan Wizard
    • Reorder Resources/Codes Dialog Box
    • Rates Pane Column Definitions
    • Advance to Period Page of the Advance Calendar Wizard
    • Display the Project Properties Dialog Box from an Open Project
    • Analyze Options Dialog Box
    • Batch Reports Pane Column Definitions
    • Rename an Ancillary File
    • Spread Budgets Using Pre-defined Spread Methods
    • Create a New Resource File
    • Display the Open File Dialog Box
    • Structure Tab of the Code File Properties Dialog Box
    • Resource File Security
    • Thresholds Tab of the Code View
    • Calculations Tab of the Resource View
    • Project Selection Page of the Respread Wizard
    • Batch Reports Pane
    • Merge Sub-Projects into a New Project
    • General Information Page of the New Project Wizard
    • Thresholds Page of the New Code File Wizard
    • Calendars Pane Column Definitions
    • Actual Costs Preferences
    • Personal Reports Pane
    • Preferences
    • Copy Down Code Assignments to Child Resources
    • Apportionment Definition Tab of the Resource View
    • Remove Sub-Projects from a Master Project
    • Cobra Login Dialog Box
    • Process Complete Page of the Calculate Forecast Wizard
    • Copy Project Preferences
    • Cobra Views
    • Delete Calendar Sets
    • Replan Preferences
    • Project and Apportionment Validations Page of the Validity Check Wizard
    • Access Control Tab of the Resource File Properties Dialog Box
    • Projects Pane
    • Copy Child Resources to a Resource
    • Access Control Tab of the Code File Properties Dialog Box
    • Change Password Dialog Box
    • Included Actual Classes Tab of the Classes Tab
    • Code Fields Page of the New Code File Wizard
    • Assign Control Account and Work Package Structures to a Project
    • Files Tab of the Project Properties Dialog Box
    • Edit Calendar Sets
    • Sub-Projects Validation Dialog Box
    • Merge Sub-Projects into a New Project
    • Include in Actuals Cost Set Page of the New Class Wizard
    • Process Complete Page of the Apportionment Calculation Wizard
    • Preferences Tab of the Project Properties Dialog Box
    • Confirmation Page of the Reclass Wizard
    • Edit Tab of the Calendar View
    • Project Selection Page of the Calculate Forecast Wizard
    • Project Selection Page of the Update Totals Wizard
    • Recalc Preferences
    • Manual Performance Factors Page of the Calculate Forecast Wizard
    • Save As Dialog Box (Merging Projects)
    • Select the Level at Which to Capture Actual Costs
    • Ancillary File Validations Page of the Validity Check Wizard
    • Find Dialog Box
    • Cobra Button
    • Apportionment Dialog Box
    • Remove Sub-Projects from a Master Project
    • Assign a Forecast Method to a Forecast Class
    • General Information Page of the New Code File Wizard
    • Select EVMS Acceptance for a Project
    • Spreadsheet Pane Column Definitions
    • About Deltek Cobra Dialog Box
    • Reorder Resources/Codes Dialog Box
    • Details Tab of the Code View
    • Project Dates Page of the New Project Wizard
    • General Information Page of the New Class Wizard
    • Process Running Page of the Validity Check Wizard
    • Project Code Assignments Page of the New Project Wizard
    • Reports Pane Column Definitions
    • Custom Menu Tab
    • Display the New Project Wizard
    • Delete a Result from a Resource
    • Change Password Dialog Box
    • Save As Dialog Box (Ancillary Files)
    • Associate an Earned Value Class with a Forecast Class
    • General Tab of the Classes Tab
    • Add a Resource Assignment
    • Explore Cobra
    • Classes Tab of the Project Properties Dialog Box
    • Confirmation Page of the New Calendar File Wizard
    • Project Selection Page of the Reclass Wizard
    • Process Running Page of the Slip Wizard
    • Access Control Page of the New Code File Wizard
    • Process Running Page of the Calculate Progress Wizard
    • Project Selection Page of the Freeze Forecast Wizard
    • Tools Tab
    • General Tab of the Resource File Properties Dialog Box
    • General Information Page of the New Calendar File Wizard
    • Order Resource Results Dialog Box
    • Assign a Calendar Set to a Forecast or Budget Class
    • Confirmation Page of the New Class Wizard
    • Validations Page of the Validity Check Wizard
    • Open File Dialog Box
    • Open File Dialog Box
    • Delete a Resource from a Resource File
    • Codes Grid of the Code View
    • Run the Rolling Wave Process Without Advancing the Calendar
    • Codes Pane
    • Code Fields Page of the New Resource File Wizard
    • Add Results to a Resource
    • Target Class Page of the Reclass Wizard
    • Copy Existing Cost Sets to a Project
    • Process Complete Page of the Reclass Wizard
    • Edit Tab of the Code View
    • Structure Tab of the Resource File Properties Dialog Box
    • Resources Pane Column Definitions
    • Code View
    • Lookup Dialog Box
    • Assign a Rate Set to a Result
    • Standard Dialog Boxes and Procedures
    • Thresholds Page of the New Resource File Wizard
    • Results Tab of the Resource File Properties Dialog Box
    • Enable a User to Access a Code File
    • Calendars Pane
    • Class Settings Page for Earned Class of the New Class Wizard
    • Display the Project Properties Dialog Box without Opening the Project
    • Codes Pane Column Definitions
    • Include in EAC Cost Set Page of the New Class Wizard
    • Notes Tab of the Resource View
    • Help
    • Purge Dialog Box
    • Included Earned Classes Tab of the Classes Tab
    • Contract Information Tab of the Project Properties Dialog Box
    • Flag Periods
    • SQL Command Utility Dialog Box
    • Process Running Page of the Freeze Forecast Wizard
    • Reclass Preferences
    • Periods Page of the New Calendar File Wizard
    • Rates Pane
    • Data Anomaly Validations Page of the Validity Check Wizard
    • Keyboard Shortcuts
    • Adjust Budget Spreads Manually
    • Delete a Code
    • Confirmation Page of the Advance Calendar Wizard
    • Reconcile Milestone Weights
    • Create a New Code File
    • Access Control Page of the New Project Wizard
    • Save As Dialog Box (Projects)
    • Process Complete Page of the Advance Calendar Wizard
    • Integration Wizard Preferences
    • Assign a Budget Source to a Budget Class
    • Criteria Selection Page of the Recalc Wizard
    • Run the SQL Command Utility
    • Enable a Group to Access a Calendar File
    • Edit Column Dialog Box
    • Copy Codes to Another Project
    • New File Dialog Box
    • Options Page of the Replan Wizard
    • Cobra 8.4 Help System
    • Enter Contract Information
    • Code File Structure Page of the New Code File Wizard
    • Delete an Existing Holiday from the Calendar
    • Shortcut Menu
    • Freeze a Forecast
    • Resources Pane
    • Perform Project Analysis
    • Sub-Projects Page of the New Project Wizard
    • Process Complete Page of the Recalc Wizard
    • Confirmation Page of the Replace Resources Wizard
    • Project Selection Page of the Calculate Progress Wizard
    • Thresholds Tab of the Resource View
    • Confirmation Page of the New Code File Wizard
    • Process Complete Page of the Validity Check Wizard
    • Earned Preferences
    • Run the Rolling Wave Process Without Advancing the Calendar
    • Display the Open File Dialog Box
    • Confirmation Page of the Respread Wizard
    • Edit Tab of the Resource View
    • Reporting Tab
    • Access Control Tab of the Project Properties Dialog Box
    • Save As Dialog Box (Projects)
    • Resource Selection Page of the Replace Resources Wizard
    • Resource File Structure Page of the New Resource File Wizard
    • Slip a Project
    • Set Reporting Options
    • Criteria Page of the Reclass Wizard
    • Project Selection Page of the Top-Down Planning Wizard
    • Cobra Login Dialog Box
    • New File Dialog Box
    • Process Complete Page of the Calculate Progress Wizard
    • Default Rates Page of the New Resource File Wizard
    • Copy Resource Calculations Dialog Box
    • Process Complete Page of the Top-Down Planning Wizard
    • Milestones/Steps Tab of the Project View
    • Options Page of the Calculate Forecast Wizard
    • Cost Sets Tab of the Project Properties Dialog Box
    • All Reports Pane
    • Select Files to Restore Dialog Box
    • Run the Rolling Wave Process
    • Confirmation Page of the Apportionment Calculation Wizard
    • Classes Page of the Respread Wizard
    • Select the Level at Which to Capture Actual Costs
    • Enter Budget Information
    • Include in Budget Cost Set Page of the New Class Wizard
    • Display the Cobra Explorer Panes
    • Column Width Dialog Box
    • Calendar View
    • Advance the Calendar
    • Confirmation Page of the Validity Check Wizard
    • Confirmation Page of the Freeze Forecast Wizard
    • Included Budget Classes Tab of the Classes Tab
    • Integration Tab
    • Cost Sets Page of the Freeze Forecast Wizard
    • Results Pane of the Analyze Form
    • Notes Tab of the Project View
    • Date Range Page of the Recalc Wizard
    • Add a Child Code to a Code
    • Save As Dialog Box (Ancillary Files)
    • Period Labels Page of the New Calendar File Wizard
    • Rename a Project
    • Options Page of the Advance Calendar Wizard
    • Edit Tab of the Project View
    • Reorder Codes
    • Shortcut Menu
    • Add Resource Results Dialog Box
    • Ancillary Files Page of the New Project Wizard
    • Process Complete Page of the Slip Wizard
    • Access Control Page of the New Resource File Wizard
    • Reclass a Class
    • Fields Page of the New Project Wizard
  • cobra views
    • Insert Column Dialog Box
    • Rename Dialog Box
    • Projects Pane Column Definitions
    • Rates Pane Column Definitions
    • Batch Reports Pane Column Definitions
    • Batch Reports Pane
    • Calendars Pane Column Definitions
    • Personal Reports Pane
    • Cobra Login Dialog Box
    • Projects Pane
    • Change Password Dialog Box
    • Find Dialog Box
    • About Deltek Cobra Dialog Box
    • Reports Pane Column Definitions
    • Change Password Dialog Box
    • Save As Dialog Box (Ancillary Files)
    • Cobra Explorer
    • Open File Dialog Box
    • Open File Dialog Box
    • Codes Pane
    • Resources Pane Column Definitions
    • Lookup Dialog Box
    • Standard Dialog Boxes and Procedures
    • Calendars Pane
    • Codes Pane Column Definitions
    • Purge Dialog Box
    • Rates Pane
    • Save As Dialog Box (Projects)
    • Edit Column Dialog Box
    • New File Dialog Box
    • Resources Pane
    • Save As Dialog Box (Projects)
    • Cobra Login Dialog Box
    • New File Dialog Box
    • All Reports Pane
    • Display the Cobra Explorer Panes
    • Column Width Dialog Box
    • Save As Dialog Box (Ancillary Files)
  • cobra web service
    • Grant the Service Account Access to the Database
    • Cobra Web Service Instance Settings
    • Remove the Cobra Web Service Host from Windows Services
    • Provide Access to the [NT AuthoritySystem] User to the Database
    • The encryption type requested is not supported by the KDC
    • Configure a New Instance
    • Enable the WCF Trace Log
    • Configure the Cobra Web Service Instances and/or Gateway using Cobra Web Service Management Tool
    • Deploy the Cobra Web Service ClientAPI
    • Configure the Gateway
    • The encryption type requested is not supported by the KDC
    • Uninstall an Instance or the Gateway
    • Troubleshooting Cobra Web Service Issues
    • Cobra Web Service Management Tool
    • Configuring the Cobra Web Service to Use Secure Socket Layers
    • Cobra Web Service Log
    • Cobra Web Service Management Tool Interface
    • Bind the Windows Server Certificate to the Cobra Web Service HTTPS Ports
    • Stop an Instance or the Gateway
    • The encryption type requested is not supported by the KDC
    • Procedures
    • Deltek Products That Utilize the Cobra Web Service
    • Right Pane of the Cobra Web Service Management Tool
    • Using the Cobra Web Service ClientAPI in Your Application
    • Run the SampleClientAPI Files
    • Enable the WCF Trace Log
    • Explaining the SampleClientAPI Code
    • Obtain the Authentication Certificate Information on the Cobra Web Service Machines
    • Left Pane of the Cobra Web Service Management Tool
    • Create a Service Account for the Cobra Web Service
    • The encryption type requested is not supported by the KDC
    • Create a Sample Actual Cost Integration File
    • Deploy the Cobra Web Service Host
    • The encryption type requested is not supported by the KDC
    • Restart an Instance or the Gateway
    • Cobra Web Service ClientAPI Example
    • Configure the Cobra Web Service When Using Windows Authentication
    • Cobra Web Service Gateway Settings
  • code
    • Performance Data Page of the wInsight Wizard
    • Code Assignments Tab of the Project Properties Dialog Box
    • Import File Field Mapper Page of the Integration Wizard
    • Rename Work Package Dialog Box
    • Display the Code View using the Codes Group Bar
    • Application Preferences
    • Add a Note to a Code
    • IPMR Format 2 Summary Page of the Report Wizard
    • Code Files
    • Filter Page of the Integration Wizard-Scheduling Tools
    • Progress Page of the Integration Wizard-Scheduling Tools
    • Rename Dialog Box
    • Add Work Package Dialog Box
    • Reorder Resources
    • Preparing the Primavera Schedule
    • Date Selection Page of the Integration Wizard-MS Project
    • Action Selection Page of the Integration Wizard
    • Resource Assignments Page of the Integration Wizard-Open Plan
    • Copy Work Package Dialog Box
    • Results Page of the ANSI EIA X12 Wizard
    • Copy Project Codes Dialog Box
    • Spreadsheet Pane of the Project View
    • Explanation of Variance Narrative Tags
    • Thresholds Tab of the Code File Properties Dialog Box
    • Report Criterion Parameters
    • Get Cobra Spread Process
    • Copy Control Account Dialog Box
    • Reorder Resources/Codes Dialog Box
    • Use a Code File in Multiple Projects
    • Work Package Codes Page of the wInsight Wizard
    • Validity Check Process
    • Project Codes Tab of the Application Preferences Dialog Box
    • Codes
    • Structure Tab of the Code File Properties Dialog Box
    • Sub-Totals Page of the Report Wizard
    • Thresholds Tab of the Code View
    • Calculations Tab of the Resource View
    • Variance Thresholds
    • Reporting
    • General Information Page of the New Project Wizard
    • Thresholds Page of the New Code File Wizard
    • Copy Down Code Assignments to Child Resources
    • Deletion Criteria Dialog Box of the Integration Wizard
    • Projects
    • New Filter Expression Dialog Box of the Report Wizard
    • Display the Code View using the Cobra Button
    • Integration Wizard
    • Access Control Tab of the Code File Properties Dialog Box
    • Date Selection Page of the Integration Wizard-Open Plan
    • Add a Code to a Code File
    • Export Structures Page of the wInsight Wizard
    • Code Fields Page of the New Code File Wizard
    • Copy Down Threshold Values to Child Codes
    • The Field Mapper
    • Files Tab of the Project Properties Dialog Box
    • Procedures
    • Field Mapper Page of the Integration Wizard
    • Sub-Projects Validation Dialog Box
    • EPM Security Administrator Functions
    • Add Control Account Dialog Box
    • Resources and Rates Page of the Integration Wizard
    • Rename Control Account Dialog Box
    • Report Categories
    • Security Options for the Analyze Process
    • Integration Tab of the Application Preferences Dialog Box
    • Manual Performance Factors Page of the Calculate Forecast Wizard
    • Schedule Mapping Page of the Integration Wizard-Primavera
    • Ancillary File Validations Page of the Validity Check Wizard
    • General Information Page of the New Code File Wizard
    • Reorder Resources/Codes Dialog Box
    • Details Tab of the Code View
    • Resources
    • Data Import-Ancillary Data
    • Project Code Assignments Page of the New Project Wizard
    • Apportionment Setup Steps
    • Miscellaneous Page of the wInsight Wizard
    • Display the New Project Wizard
    • Variance Thresholds
    • Required Template Files
    • Save As Dialog Box (Ancillary Files)
    • Manage Sorts Dialog Box of the Report Wizard
    • Resource File Information Tags
    • Copy Child Codes to a Code
    • Import File Validation
    • File Selection Page of the Integration Wizard
    • Filter Page of the Integration Wizard-Files
    • Project Selection Page of the Reclass Wizard
    • Access Control Page of the New Code File Wizard
    • Master Project Versus Individual Projects
    • Custom Cost Classes
    • Open File Dialog Box
    • Copy Down Code Assignments to Child Codes
    • Codes and the Integration Wizard
    • Open File Dialog Box
    • Class Information Tags
    • Codes Grid of the Code View
    • Code Fields Page of the New Resource File Wizard
    • Report Types
    • Data Import Using Scheduling Tools and Files
    • Code View
    • Structures Section of the XML File
    • XML Configuration File
    • Lookup Dialog Box
    • Preparing the Open Plan Schedule
    • Guidelines for Accurate Earned Value Management
    • Preparing Cobra for Schedule Integration
    • Thresholds Page of the New Resource File Wizard
    • Control Account Fields Versus Codes
    • Results Tab of the Resource File Properties Dialog Box
    • Enable a User to Access a Code File
    • Set Threshold Values for a Code
    • Move Work Package Dialog Box
    • Purge Dialog Box
    • Cobra Components
    • Log Change Comment Dialog Box
    • Delete a Code
    • Create a New Code File
    • Criteria Selection Page of the Recalc Wizard
    • Resources and Code Files
    • Types of Code Files
    • Element of Cost Page of the wInsight Wizard
    • Additional Project Files
    • Code File Security
    • Schedule Mapping Page of the Integration Wizard-Open Plan
    • Copy Codes to Another Project
    • Export Structures Page of the ANSI EIA X12 Wizard
    • IPMR Format 2 Summary Page of the wInsight Wizard
    • New File Dialog Box
    • Code File Structure Page of the New Code File Wizard
    • Data Import-Actual Costs
    • Shortcut Menu
    • Perform Project Analysis
    • Codes Page of the Integration Wizard-MS Project
    • Code File Structures
    • Validate Code Assignments — Solve Roll-Up Issues
    • Confirmation Page of the New Code File Wizard
    • Loading Resource Files from Open Plan
    • Resource Calculation Tags
    • Resources
    • Resource File Structure Page of the New Resource File Wizard
    • Criteria Page of the Reclass Wizard
    • Codes
    • Filter Page of the Integration Wizard
    • Resource Tags
    • New File Dialog Box
    • Loading Resource Files from Open Plan
    • Code Usage in Cobra
    • Codes Page of the Integration Wizard-Open Plan
    • Results Pane of the Analyze Form
    • SQL Language Extended Support
    • Data Formats
    • Add a Child Code to a Code
    • Save As Dialog Box (Ancillary Files)
    • Resource Components
    • Options Page of the Advance Calendar Wizard
    • Reorder Codes
    • Add Resource Results Dialog Box
    • Status File Field Mapper Page of the Integration Wizard
    • Control Account Versus Work Package Level
    • Date Selection Page of the Integration Wizard-Primavera
    • Options Page of the ANSI EIA X12 Wizard
    • Set Up Projects and Project Baselines
    • Fields Page of the New Project Wizard
  • code assignment
    • Code Assignments Tab of the Project Properties Dialog Box
    • Copy Project Codes Dialog Box
    • Procedures
    • Copy Codes to Another Project
    • Assign Codes to a Project
  • code assignments tab
  • code edit tab
  • code fields page
    • Code Fields Page of the New Code File Wizard
    • Code Fields Page of the New Rate File Wizard
    • Code Fields Page of the New Resource File Wizard
  • code fields tab
    • Code Fields Tab of the Resource File Properties Dialog Box
    • Code Fields Tab of the Code File Properties Dialog Box
    • Code Fields Tab of the Rate File Properties Dialog Box
  • code file
    • Code Assignments Tab of the Project Properties Dialog Box
    • Rename Work Package Dialog Box
    • Add a Note to a Code
    • IPMR Format 2 Summary Page of the Report Wizard
    • Code Files
    • Filter Page of the Integration Wizard-Scheduling Tools
    • Add Work Package Dialog Box
    • Reorder Resources
    • Action Selection Page of the Integration Wizard
    • Copy Work Package Dialog Box
    • Spreadsheet Pane of the Project View
    • Thresholds Tab of the Code File Properties Dialog Box
    • Copy Control Account Dialog Box
    • Reorder Resources/Codes Dialog Box
    • Use a Code File in Multiple Projects
    • Validity Check Process
    • Project Codes Tab of the Application Preferences Dialog Box
    • Codes
    • Structure Tab of the Code File Properties Dialog Box
    • Sub-Totals Page of the Report Wizard
    • Thresholds Tab of the Code View
    • Reporting
    • Thresholds Page of the New Code File Wizard
    • Projects
    • Access Control Tab of the Code File Properties Dialog Box
    • Add a Code to a Code File
    • Export Structures Page of the wInsight Wizard
    • Code Fields Page of the New Code File Wizard
    • Copy Down Threshold Values to Child Codes
    • The Field Mapper
    • Files Tab of the Project Properties Dialog Box
    • Sub-Projects Validation Dialog Box
    • EPM Security Administrator Functions
    • Add Control Account Dialog Box
    • Resources and Rates Page of the Integration Wizard
    • Rename Control Account Dialog Box
    • Report Categories
    • Enable a Group to Access a Code File
    • Ancillary File Validations Page of the Validity Check Wizard
    • General Information Page of the New Code File Wizard
    • Reorder Resources/Codes Dialog Box
    • Details Tab of the Code View
    • Resources
    • Project Code Assignments Page of the New Project Wizard
    • Display the New Project Wizard
    • Required Template Files
    • Resource File Information Tags
    • Access Control Page of the New Code File Wizard
    • Custom Cost Classes
    • Codes and the Integration Wizard
    • Class Information Tags
    • Codes Grid of the Code View
    • Code Fields Page of the New Resource File Wizard
    • Report Types
    • Data Import Using Scheduling Tools and Files
    • Code View
    • Structures Section of the XML File
    • XML Configuration File
    • Preparing Cobra for Schedule Integration
    • Thresholds Page of the New Resource File Wizard
    • Enable a User to Access a Code File
    • Set Threshold Values for a Code
    • Move Work Package Dialog Box
    • Purge Dialog Box
    • Delete a Code
    • Create a New Code File
    • Resources and Code Files
    • Types of Code Files
    • Additional Project Files
    • Export Structures Page of the ANSI EIA X12 Wizard
    • IPMR Format 2 Summary Page of the wInsight Wizard
    • Code File Structure Page of the New Code File Wizard
    • Shortcut Menu
    • Codes Page of the Integration Wizard-MS Project
    • Code File Structures
    • Validate Code Assignments — Solve Roll-Up Issues
    • Confirmation Page of the New Code File Wizard
    • Notes Tab of the Code View
    • Loading Resource Files from Open Plan
    • Resources
    • Criteria Page of the Reclass Wizard
    • Codes
    • Loading Resource Files from Open Plan
    • Codes Page of the Integration Wizard-Open Plan
    • Add a Child Code to a Code
    • Reorder Codes
    • Set Up Projects and Project Baselines
    • Fields Page of the New Project Wizard
  • code file properties
    • General Tab of the Code File Properties Dialog Box
    • Code File Properties Dialog Box
    • Display the Code File Properties Dialog Box Tabs without Opening a Code File
    • Display the Code File Properties Dialog Box Tabs from an Open Code File
    • Procedures
  • code file properties dialog box
    • Thresholds Tab of the Code File Properties Dialog Box
    • Structure Tab of the Code File Properties Dialog Box
    • Access Control Tab of the Code File Properties Dialog Box
    • Enable a Group to Access a Code File
    • Code Fields Tab of the Code File Properties Dialog Box
    • Enable a User to Access a Code File
    • Shortcut Menu
  • code file structure page
  • code view
    • Procedures
    • Display the Code View using the Codes Group Bar
    • Add a Note to a Code
    • Thresholds Tab of the Code File Properties Dialog Box
    • Reorder Resources/Codes Dialog Box
    • Structure Tab of the Code File Properties Dialog Box
    • Thresholds Tab of the Code View
    • Display the Code View using the Cobra Button
    • Access Control Tab of the Code File Properties Dialog Box
    • Copy Down Threshold Values to Child Codes
    • Enable a Group to Access a Code File
    • Reorder Resources/Codes Dialog Box
    • Details Tab of the Code View
    • Copy Child Codes to a Code
    • Copy Down Code Assignments to Child Codes
    • Codes Grid of the Code View
    • Code View
    • Procedures
    • Enable a User to Access a Code File
    • Set Threshold Values for a Code
    • Delete a Code
    • Notes Tab of the Code View
    • Add a Child Code to a Code
    • Reorder Codes
  • coded ranges
    • Coded Ranges Method
    • Forecast Class Page of the New Class Wizard
  • codes
    • Code Assignments Tab of the Project Properties Dialog Box
    • Code the Resources for IPMR Format 2 Reports
    • Codes and the Report Wizard
    • Copy Down Codes Dialog Box
    • Copy Children Dialog Box
    • Copy Down Codes Dialog Box
    • Copy Children Dialog Box
    • Copy Codes to Another Project
    • Procedures
    • Assign Codes to a Project
  • codes and structures page
  • codes grid
    • Codes Grid of the Code View
    • Shortcut Menu
    • Add a Child Code to a Code
  • codes page
    • Codes Page of the Integration Wizard
    • Codes Page of the Integration Wizard-Primavera
    • Codes Page of the Integration Wizard-MS Project
    • Codes Page of the Integration Wizard-Open Plan
  • codes pane
    • Codes Pane
    • Codes Pane Column Definitions
    • Shortcut Menu
  • codes tab
  • column
    • Code Assignments Tab of the Project Properties Dialog Box
    • Import File Field Mapper Page of the Integration Wizard
    • Insert Column Dialog Box
    • IPMR Format 2 Summary Page of the Report Wizard
    • Resource Assignment Percent Complete Dialog Box
    • Add Work Package Dialog Box
    • Spread Curves Tab of the Application Preferences Dialog Box
    • Analyze Preferences
    • Report Template Format
    • Data Dictionary
    • Spreadsheet Pane of the Project View
    • Audit Log Comparison Page of the Project Audit Wizard
    • Copy Preferences Dialog Box
    • Report Criterion Parameters
    • File Format for Importing Apportionment Mapping
    • Work Package Codes Page of the wInsight Wizard
    • Analyze Options Dialog Box
    • Class and Results Page of the Integration Wizard
    • Personal Reports Pane
    • Copy Down Code Assignments to Child Resources
    • New Filter Expression Dialog Box of the Report Wizard
    • Integration Configuration Page of the Integration Wizard
    • Progress Page of the Integration Wizard-Files
    • Edit Comment and Change Number Page of the Project Audit Wizard
    • General Tab of the Application Preferences Dialog Box
    • Export Structures Page of the wInsight Wizard
    • Code Fields Page of the New Code File Wizard
    • The Field Mapper
    • Field Mapper Page of the Integration Wizard
    • Remove a Column from a View
    • Add Control Account Dialog Box
    • Status Page of the Integration Wizard-Files
    • Manual Performance Factors Page of the Calculate Forecast Wizard
    • Schedule Mapping Page of the Integration Wizard-Primavera
    • Spreadsheet Pane Column Definitions
    • Miscellaneous Page of the wInsight Wizard
    • Resource Assignments Page of the Integration Wizard-Files
    • Display the New Project Wizard
    • Calendars
    • Insert a Column in a View
    • Codes Grid of the Code View
    • Code Fields Page of the New Resource File Wizard
    • Report Types
    • Integration Configuration Page of the Integration Wizard
    • Integration Configuration Page of the Integration Wizard
    • Results Tab of the Resource File Properties Dialog Box
    • Adjust Budget Spreads Manually
    • Edit Exported Data in Excel
    • Formula Tags
    • Configuration Security Dialog Box
    • Edit Column Dialog Box
    • Schedule Mapping Page of the Integration Wizard-Open Plan
    • IPMR Format 2 Summary Page of the wInsight Wizard
    • Resources Pane
    • Planning Reports
    • Earned Preferences
    • New Sort Expression Dialog Box of the Report Wizard
    • Status Page of the Integration Wizard
    • Milestones/Steps Tab of the Project View
    • Cost Sets Tab of the Project Properties Dialog Box
    • Edit Sort Expression Dialog Box of the Report Wizard
    • Process Logs Dialog Box
    • Calendar View
    • Results Pane of the Analyze Form
    • Data Formats
    • Adjust Column Width
    • Calendar Sets
    • Column Reports
    • Add Resource Results Dialog Box
    • Time-phased Reports
    • Status File Field Mapper Page of the Integration Wizard
    • Results or Field Names
    • Fields Page of the New Project Wizard
  • command line parameters
    • Pass Command Line Parameters using the New Application Shortcut
    • Running Cobra with Command Line Parameters
    • Running Cobra with Command Line Parameters
    • Running Cobra with Command Line Parameters
  • concurrency
    • The server was unable to process the request due to an internal error
    • Data Access Tab of the Application Preferences Dialog Box
    • There was no endpoint listening at http://:/CobraWebService/service that could accept the message
    • Use the Process Queue Manager form in PM Compass to Check Job Status
    • View Job Status and Process Logs
    • The encryption type requested is not supported by the KDC
    • Use the Process Queue Manager form in PM Compass to Check Job Status
    • Concurrent Apportionment Calculations
    • The server was unable to process the request due to an internal error
    • The server was unable to process the request due to an internal error
    • The encryption type requested is not supported by the KDC
    • Troubleshooting Concurrency Issues
    • Use the Process Queue Manager form in PM Compass to Check Job Status
    • Troubleshooting Cobra Web Service Issues
    • Run Page of the Calculate Progress Wizard
    • There was no endpoint listening at http://:/CobraWebService/service that could accept the message
    • There was no endpoint listening at http://:/CobraWebService/service that could accept the message
    • Concurrent Progress Calculations
    • The encryption type requested is not supported by the KDC
    • Concurrency in Cobra
    • Run Page of the Calculate Forecast Wizard
    • Troubleshooting Concurrency Issues
    • There was no endpoint listening at http://:/CobraWebService/service that could accept the message
    • Run Concurrent Progress Calculations
    • The server was unable to process the request due to an internal error
    • View Job Status and Process Logs in PM Compass
    • View Job Status and Process Logs in Cobra
    • Troubleshooting Concurrency Issues
    • Concurrent Forecast Calculations
    • Troubleshooting Concurrency Issues
    • The encryption type requested is not supported by the KDC
    • The encryption type requested is not supported by the KDC
    • Run Concurrent Forecast Calculations
    • Use the Process Queue Manager form in PM Compass to Check Job Status
  • concurrent
    • Load an Import File with Multiple Projects Concurrently
    • Multi-Project Concurrent Integration
    • Run Concurrent Apportionment Calculations
    • Run Page of the Apportionment Calculation Wizard
  • configuration
    • Confirmation Page of the Integration Wizard
    • Configuration Security
    • Save and Load Page of the Integration Wizard
    • Filter Page of the Integration Wizard-Scheduling Tools
    • Process Running Page of the wInsight Wizard
    • Reporting
    • Back Up Your Data
    • Integration Configuration Page of the Integration Wizard
    • Deploy the Cobra Web Service ClientAPI
    • Results Page of the Integration Wizard
    • Select Configuration Page of the Update Open Plan Resources Wizard
    • Modify the Cobra.WinUI.Exe.Config File in the Workstation Folder (netTcpBinding Message Level)
    • Hook Program Methods
    • Integrate Ancillary Data Process
    • Filter Page of the Integration Wizard-Files
    • Create Project from Template Process
    • Edit Connection Dialog Box of the Integration Wizard-Primavera
    • Integration Configuration Page of the Integration Wizard
    • New Connection Dialog Box of the Integration Wizard-MS Project
    • Data Import Using Scheduling Tools and Files
    • XML Configuration File
    • Modify the Cobra.Api.Exe.Config File in the Workstation Folder
    • Configuration Page of the wInsight Wizard
    • Integration Configuration Page of the Integration Wizard
    • Running the Process or Operation
    • wInsight Database Page of the wInsight Wizard
    • New Connection Dialog Box of the Integration Wizard-Primavera
    • Configuration Security Dialog Box
    • Cobra 8.4 Help System
    • XML Configuration Object Interface
    • Edit Connection Dialog Box of the Integration Wizard-MS Project
    • Filter Page of the Integration Wizard
    • API Script to Create a New Project from a Project Template
  • configuration page
  • configuration security
  • configuration security dialog box
  • configuration selection page
  • configurations
  • configure dialog box
  • confirmation page
    • Confirmation Page of the Integration Wizard
    • Confirmation Page of the New Project Wizard
    • Confirmation Page of the Slip Wizard
    • Confirmation Page of the Calculate Progress Wizard
    • Confirmation Page of the New Resource File Wizard
    • Confirmation Page of the Report Wizard
    • Confirmation Page of the Update Codes Wizard
    • Confirmation Page of the Add Rate Set Wizard
    • Confirmation Page of the Top-Down Planning Wizard
    • Confirmation Page of the Replan Wizard
    • Confirmation Page of the Reclass Wizard
    • Confirmation Page of the ANSI EIA X12 Wizard
    • Confirmation Page of the Assignment Import/Export Wizard
    • Confirmation Page of the Update Totals Wizard
    • Confirmation Page of the Integration Wizard
    • Confirmation Page of the New Calendar File Wizard
    • Confirmation Page of the New Class Wizard
    • Confirmation Page of the Rolling Wave Wizard
    • Confirmation Page of the Advance Calendar Wizard
    • Confirmation Page of the Zero-Out Data Wizard
    • Confirmation Page of the New Rate File Wizard
    • Confirmation Page of the Cost Data Wizard
    • Confirmation Page of the Replace Resources Wizard
    • Confirmation Page of the New Code File Wizard
    • Confirmation Page of the Project Audit Wizard
    • Confirmation Page of the Respread Wizard
    • Confirmation Page of the Calculate Forecast Wizard
    • Confirmation Page of the wInsight Wizard
    • Confirmation Page of the Recalc Wizard
    • Confirmation Page of the Update Open Plan Resources Wizard
    • Confirmation Page of the Apportionment Calculation Wizard
    • Confirmation Page of the Integration Wizard
    • Confirmation Page of the Validity Check Wizard
    • Confirmation Page of the Freeze Forecast Wizard
    • Confirmation Page of the Export Calendar to Open Plan Wizard
    • Confirmation Page of the Integration Wizard
    • Confirmation Page of the Align Time-phased Dates Wizard
  • connection selection page
  • control account
    • Resource Assignments Page of the Assignment Import/Assignment Export Wizard
    • Milestones/Steps
    • Import File Field Mapper Page of the Integration Wizard
    • Class Settings Page for Actuals Class of the New Class Wizard
    • Rename Work Package Dialog Box
    • Criteria Page of the Slip Wizard
    • Data Access Tab of the Application Preferences Dialog Box
    • Code Files
    • Filter Page of the Integration Wizard-Scheduling Tools
    • Color Band
    • Progress Page of the Integration Wizard-Scheduling Tools
    • Add Work Package Dialog Box
    • Spread Curves Tab of the Application Preferences Dialog Box
    • Preparing the Primavera Schedule
    • Report Template Format
    • Work Package Name Page of the Replan Wizard
    • Rename a Work Package
    • Settings Page of the New Project Wizard
    • Date Selection Page of the Integration Wizard-MS Project
    • Action Selection Page of the Integration Wizard
    • Resource Assignments Page of the Integration Wizard-Open Plan
    • Copy Work Package Dialog Box
    • Examples of Manual Forecast Calculations
    • Spreadsheet Pane of the Project View
    • Audit Reports
    • Baseline Tags
    • Perform Apportionment Mapping
    • Copy Control Account Dialog Box
    • Progress Techniques
    • Use a Code File in Multiple Projects
    • Save the Contents of the Spreadsheet Pane as an Excel File
    • Validity Check Process
    • Sub-Totals Page of the Report Wizard
    • Class and Results Page of the Integration Wizard
    • Merge Sub-Projects into a New Project
    • Reporting
    • General Information Page of the New Project Wizard
    • Actual Costs Preferences
    • Deletion Criteria Dialog Box of the Integration Wizard
    • Projects
    • Export and Import Time-Phased Resource Assignments
    • New Filter Expression Dialog Box of the Report Wizard
    • Project and Apportionment Validations Page of the Validity Check Wizard
    • Integration Configuration Page of the Integration Wizard
    • Progress Page of the Integration Wizard-Files
    • Date Selection Page of the Integration Wizard-Open Plan
    • Change Control Page of the Integration Wizard
    • Edit Comment and Change Number Page of the Project Audit Wizard
    • General Tab of the Application Preferences Dialog Box
    • Export Structures Page of the wInsight Wizard
    • Calculated Fields
    • The Field Mapper
    • Assign Control Account and Work Package Structures to a Project
    • Files Tab of the Project Properties Dialog Box
    • Field Mapper Page of the Integration Wizard
    • Sub-Projects Validation Dialog Box
    • Merge Sub-Projects into a New Project
    • Add a New Work Package using the Dialog Box
    • EPM Security Administrator Functions
    • Add Control Account Dialog Box
    • Rename Control Account Dialog Box
    • Project Selection Page of the Update Totals Wizard
    • Adding a New Control Account
    • Recalc Preferences
    • Security Options for the Analyze Process
    • Integration Tab of the Application Preferences Dialog Box
    • Manual Performance Factors Page of the Calculate Forecast Wizard
    • Supported Processes, Operations, and Data
    • Update EAC Dialog Box
    • Select the Level at Which to Capture Actual Costs
    • Schedule Mapping Page of the Integration Wizard-Primavera
    • Prompt Level Page of the Project Audit Wizard
    • Spreadsheet Pane Column Definitions
    • Resources
    • Examples of Forecast Calculations
    • Apportionment Setup Steps
    • Miscellaneous Page of the wInsight Wizard
    • Resource Assignments Page of the Integration Wizard-Files
    • Display the New Project Wizard
    • Cost Sets Page of the Report Wizard
    • Process Complete Page of the Assignment Import/Assignment Export Wizard
    • Copy a Work Package
    • General Tab of the Classes Tab
    • Add a Resource Assignment
    • Control Accounts and Work Packages
    • Import File Validation
    • Import Location Page of the Assignment Import Wizard
    • Filter Page of the Integration Wizard-Files
    • Project Selection Page of the Reclass Wizard
    • Notes Page of the Integration Wizard
    • New Calculated Field Dialog Box
    • Master Project Versus Individual Projects
    • Progress Techniques
    • Custom Cost Classes
    • Multiproject Operations (Master and Subprojects)
    • Calculated Field Expression Dialog Box
    • Codes and the Integration Wizard
    • Report Types
    • How Cobra Spreads ETC
    • Target Class Page of the Reclass Wizard
    • Integration Configuration Page of the Integration Wizard
    • Data Import Using Scheduling Tools and Files
    • Display the Rename Control Account Dialog Box
    • Lookup Dialog Box
    • Move a Control Account
    • Integration Configuration Page of the Integration Wizard
    • Advance Calendar
    • Display the Copy Control Account Dialog Box
    • Preparing the Open Plan Schedule
    • Guidelines for Accurate Earned Value Management
    • Rename a Control Account
    • Control Account Fields Versus Codes
    • Calculated Fields Dialog Box
    • Move Work Package Dialog Box
    • Class Settings Page for Earned Class of the New Class Wizard
    • Resource Assignments
    • Forecast Calculations
    • Purge Dialog Box
    • Log Change Comment Dialog Box
    • Reclass Preferences
    • Data Anomaly Validations Page of the Validity Check Wizard
    • Add a New Control Account using the Dialog Box
    • Reconcile Milestone Weights
    • Integration Wizard Preferences
    • Criteria Selection Page of the Recalc Wizard
    • Schedule Mapping Page of the Integration Wizard-Open Plan
    • Export Structures Page of the ANSI EIA X12 Wizard
    • Display the Move Control Account Dialog Box
    • Options Page of the Replan Wizard
    • Change Management Tags
    • Data Import-Actual Costs
    • Planning Reports
    • Examples of Statistical Forecast Calculations
    • Fields Dialog Box
    • Perform Project Analysis
    • Validate Code Assignments — Solve Roll-Up Issues
    • Considerations When Creating Field Names
    • Project Selection Page of the Assignment Import/Assignment Export Wizard
    • Resources
    • Slip a Project
    • Criteria Page of the Reclass Wizard
    • Project Selection Page of the Top-Down Planning Wizard
    • Filter Page of the Integration Wizard
    • Control Account and Work Package Note Tags
    • Cobra Web Service
    • Process Lock
    • Options Page of the Calculate Forecast Wizard
    • Process Logs Dialog Box
    • Update Totals Process
    • Select the Level at Which to Capture Actual Costs
    • Log Comment Page of the Assignment Import/Assignment Export Wizard
    • Notes Tab of the Project View
    • Data Formats
    • Column Reports
    • Status File Field Mapper Page of the Integration Wizard
    • Control Account Versus Work Package Level
    • Date Selection Page of the Integration Wizard-Primavera
    • Options Page of the ANSI EIA X12 Wizard
    • Included Costs Page of the Integration Wizard
    • Manual Forecasts
    • Set Up Projects and Project Baselines
    • Fields Page of the New Project Wizard
  • control account codes page
  • control account manager
    • Import File Field Mapper Page of the Integration Wizard
    • Criteria Page of the Replan Wizard
    • Schedule Mapping Page of the Integration Wizard-Primavera
    • Criteria Selection Page of the Respread Wizard
    • Criteria Selection Page of the Recalc Wizard
    • Criteria Selection Page of the Update Codes Wizard
    • Schedule Mapping Page of the Integration Wizard-Open Plan
    • General Tab of the Project View
    • Criteria Page of the Reclass Wizard
    • Criteria Selection Page of the Top-Down Planning Wizard
    • Schedule Mapping Page of the Integration Wizard-MS Project
  • copy
  • copy batch report
  • copy batch report dialog box
    • Copy Batch Report Dialog Box
    • Display the Copy Batch Report Dialog Box
  • copy child resources
  • copy children
    • Copy Children Dialog Box
    • Copy Children Dialog Box
  • copy children dialog box
    • Display the Copy Children Dialog Box
    • Copy Children Dialog Box
    • Copy Children Dialog Box
    • Display the Copy Children Dialog Box
  • copy class
  • copy control account dialog box
  • copy down codes
    • Copy Down Codes Dialog Box
    • Copy Down Codes Dialog Box
  • copy down codes dialog box
    • Copy Down Codes Dialog Box
    • Display the Copy Down Codes Dialog Box
    • Copy Down Codes Dialog Box
    • Display the Copy Down Codes Dialog Box
  • copy filter dialog box
  • copy project codes dialog box
  • copy resource calculation
  • copy resource calculation dialog box
    • Copy Resource Calculations Dialog Box
    • Display the Copy Resource Calculations Dialog Box
  • copy sort dialog box
  • copy threshold values
  • copy work package
  • copy work package dialog box
  • cost
    • Performance Data Page of the wInsight Wizard
    • Milestones/Steps
    • Class Settings Page for Actuals Class of the New Class Wizard
    • Data Access Tab of the Application Preferences Dialog Box
    • Code Files
    • Log Transaction Page of the Project Audit Wizard
    • Spread Curves Tab of the Application Preferences Dialog Box
    • First Result and Derived Costs
    • Preparing the Primavera Schedule
    • Report Template Format
    • Delete a Cost Set
    • Settings Page of the New Project Wizard
    • Resource Assignments Page of the Integration Wizard-Open Plan
    • Results Page of the ANSI EIA X12 Wizard
    • Examples of Manual Forecast Calculations
    • Spreadsheet Pane of the Project View
    • Audit Reports
    • Baseline Tags
    • Thresholds Tab of the Code File Properties Dialog Box
    • Get Cobra Spread Process
    • Validity Check Process
    • Analyze Options Dialog Box
    • Codes
    • Sub-Totals Page of the Report Wizard
    • Thresholds Tab of the Code View
    • Class and Results Page of the Integration Wizard
    • Variance Thresholds
    • Project Selection Page of the Respread Wizard
    • Merge Sub-Projects into a New Project
    • Reporting
    • General Information Page of the New Project Wizard
    • Thresholds Page of the New Code File Wizard
    • Actual Costs Preferences
    • Projects
    • Replan Preferences
    • Project and Apportionment Validations Page of the Validity Check Wizard
    • Cost Set Information Tags
    • General Tab of the Application Preferences Dialog Box
    • Export Structures Page of the wInsight Wizard
    • Statistical Forecasts
    • Merge Sub-Projects into a New Project
    • Include in Actuals Cost Set Page of the New Class Wizard
    • EPM Security Administrator Functions
    • Project Selection Page of the Update Totals Wizard
    • Report Categories
    • Recalc Preferences
    • Integration Tab of the Application Preferences Dialog Box
    • Schedule Mapping Page of the Integration Wizard-Primavera
    • Spreadsheet Pane Column Definitions
    • Resources
    • Examples of Forecast Calculations
    • Apportionment Setup Steps
    • Calendars
    • Cost Sets Page of the Report Wizard
    • Variance Thresholds
    • Calculate Progress
    • General Tab of the Classes Tab
    • Classes Tab of the Project Properties Dialog Box
    • Set Up a Retain EAC Forecast with the Scale EAC Option
    • Project Selection Page of the Freeze Forecast Wizard
    • How Cobra Calculates Progress to Determine Earned Value
    • Custom Cost Classes
    • Apportionment Process
    • Report Types
    • How Cobra Spreads ETC
    • Target Class Page of the Reclass Wizard
    • Copy Existing Cost Sets to a Project
    • Data Import Using Scheduling Tools and Files
    • Structures Section of the XML File
    • Sample Earned Value Calculation
    • Preparing the Open Plan Schedule
    • Guidelines for Accurate Earned Value Management
    • Preparing Cobra for Schedule Integration
    • Thresholds Page of the New Resource File Wizard
    • Results Tab of the Resource File Properties Dialog Box
    • Class Settings Page for Earned Class of the New Class Wizard
    • Resource Assignments
    • Include in EAC Cost Set Page of the New Class Wizard
    • Forecast Calculations
    • Contract Information Tab of the Project Properties Dialog Box
    • Flag Periods
    • Reclass Preferences
    • Set Project Baseline Page of the Project Audit Wizard
    • Adjust Budget Spreads Manually
    • Criteria Selection Page of the Recalc Wizard
    • Resources and Code Files
    • Element of Cost Page of the wInsight Wizard
    • Recalc
    • Frozen Forecasts
    • Options Page of the Replan Wizard
    • Change Management Tags
    • Cobra 8.4 Help System
    • Data Import-Actual Costs
    • Retain EAC
    • Resources Pane
    • Examples of Statistical Forecast Calculations
    • Process Complete Page of the Recalc Wizard
    • Thresholds Tab of the Resource View
    • Earned Preferences
    • Resources
    • Project Selection Page of the Top-Down Planning Wizard
    • Codes
    • Process Lock
    • Options Page of the Calculate Forecast Wizard
    • Cost Sets Tab of the Project Properties Dialog Box
    • Entering Actual Costs Manually
    • Include in Budget Cost Set Page of the New Class Wizard
    • Cost Sets Page of the Freeze Forecast Wizard
    • Results Pane of the Analyze Form
    • Date Range Page of the Recalc Wizard
    • Calendar Sets
    • Resource Components
    • Column Reports
    • Ancillary Files Page of the New Project Wizard
    • Time-phased Reports
    • Results or Field Names
    • Control Account Versus Work Package Level
    • Included Costs Page of the Integration Wizard
    • Set Up Projects and Project Baselines
    • Reclass a Class
  • cost data
    • Configure Calendar Set 19 for IPMR Reports, wInsight Integration, and Cost Data Export/DCDE Format
    • Cost Data Export
  • cost data export
    • Export Structures Page of the Cost Data Wizard
    • Cost Sets Page of the Cost Data Wizard
    • Export Cost Data
    • Cost Data Export Process
    • Process Complete Page of the Cost Data Wizard
    • Procedures
    • Project and Format Page of the Cost Data Wizard
    • Data Options Page of the Cost Data Wizard
    • Integration Tab of the Application Preferences Dialog Box
    • Configuration Selection Page of the Cost Data Wizard
    • Cost Data Export
    • Confirmation Page of the Cost Data Wizard
    • Access Control Page of the Cost Data Wizard
    • Process Logs Dialog Box
    • Save and Run Page of the Cost Data Wizard
  • cost data wizard
    • Configuration Security
    • Export Structures Page of the Cost Data Wizard
    • Cost Sets Page of the Cost Data Wizard
    • Export Cost Data
    • Cost Data Export Process
    • Process Complete Page of the Cost Data Wizard
    • Procedures
    • Project and Format Page of the Cost Data Wizard
    • Data Options Page of the Cost Data Wizard
    • Configuration Selection Page of the Cost Data Wizard
    • Cost Data Wizard
    • Codes and Structures Page of the Cost Data Wizard
    • Configuration Security Dialog Box
    • Confirmation Page of the Cost Data Wizard
    • Access Control Page of the Cost Data Wizard
    • Process Running Page of the Cost Data Wizard
    • Save and Run Page of the Cost Data Wizard
  • cost set
    • Class Settings Page for Actuals Class of the New Class Wizard
    • Report Template Format
    • Delete a Cost Set
    • Validity Check Process
    • Sub-Totals Page of the Report Wizard
    • Merge Sub-Projects into a New Project
    • Reporting
    • General Information Page of the New Project Wizard
    • Project and Apportionment Validations Page of the Validity Check Wizard
    • Cost Set Information Tags
    • General Tab of the Application Preferences Dialog Box
    • Merge Sub-Projects into a New Project
    • Include in Actuals Cost Set Page of the New Class Wizard
    • Project Selection Page of the Update Totals Wizard
    • Cost Sets Page of the Report Wizard
    • Set Up a Retain EAC Forecast with the Scale EAC Option
    • Project Selection Page of the Freeze Forecast Wizard
    • Custom Cost Classes
    • Report Types
    • Copy Existing Cost Sets to a Project
    • Class Settings Page for Earned Class of the New Class Wizard
    • Include in EAC Cost Set Page of the New Class Wizard
    • Add a Class to a Cost Set
    • Frozen Forecasts
    • Classes and Cost Sets
    • Options Page of the Calculate Forecast Wizard
    • Cost Sets Tab of the Project Properties Dialog Box
    • Include in Budget Cost Set Page of the New Class Wizard
    • Cost Sets Page of the Freeze Forecast Wizard
    • Column Reports
    • Time-phased Reports
  • cost sets page
    • Cost Sets Page of the Cost Data Wizard
    • Cost Sets Page of the Report Wizard
    • Cost Sets Page of the wInsight Wizard
    • Cost Sets Page of the Freeze Forecast Wizard
  • cost sets tab
  • costs
  • criteria page
    • Criteria Page of the Slip Wizard
    • Criteria Page of the Replan Wizard
    • Criteria Page of the Update Open Plan Resources Wizard
    • Criteria Page of the Reclass Wizard
  • criteria selection page
    • Criteria Selection Page of the Respread Wizard
    • Criteria Selection Page of the Recalc Wizard
    • Criteria Selection Page of the Update Codes Wizard
    • Criteria Selection Page of the Zero-Out Data Wizard
    • Criteria Selection Page of the Freeze Forecast Wizard
    • Criteria Selection Page of the Top-Down Planning Wizard
  • currency
    • Performance Data Page of the wInsight Wizard
    • Resource Assignments Page of the Assignment Import/Assignment Export Wizard
    • Report Template Format
    • Settings Page of the New Project Wizard
    • Spreadsheet Pane of the Project View
    • Calculations Tab of the Resource View
    • Update EAC Dialog Box
    • Spreadsheet Pane Column Definitions
    • Miscellaneous Page of the wInsight Wizard
    • Required Template Files
    • Resource File Information Tags
    • Set Up a Retain EAC Forecast with the Scale EAC Option
    • Custom Cost Classes
    • XML Configuration File
    • Results Tab of the Resource File Properties Dialog Box
    • Log Operation Page of the Project Audit Wizard
    • Set Project Baseline Page of the Project Audit Wizard
    • Element of Cost Page of the wInsight Wizard
    • Additional Project Files
    • Earned Preferences
    • Resource Calculation Tags
    • Style Page of the Report Wizard
    • Options Page of the Calculate Forecast Wizard
    • Resource Components
    • Add Resource Results Dialog Box
    • Results or Field Names
  • custom hooks
    • Application Preferences
    • General Tab of the Application Preferences Dialog Box
    • Integration Tab of the Application Preferences Dialog Box
    • Hook Program Methods
    • MsgLogger Object Interface
    • XML Configuration File
    • Customization of Integration Process
    • XML Configuration Object Interface
    • Customization of Processes
    • Custom Hooks
  • custom menu tab
  • custom table
  • data
    • Data Tool
    • Performance Data Page of the wInsight Wizard
    • Confirmation Page of the Integration Wizard
    • Code Assignments Tab of the Project Properties Dialog Box
    • Resource Assignments Page of the Assignment Import/Assignment Export Wizard
    • Milestones/Steps
    • Import File Field Mapper Page of the Integration Wizard
    • Create Windows Shortcut for the API Script
    • Application Preferences
    • Insert Column Dialog Box
    • Save and Load Page of the Integration Wizard
    • Data Access Tab of the Application Preferences Dialog Box
    • IPMR Format 2 Summary Page of the Report Wizard
    • Code Files
    • SQL Command Utility
    • Filter Page of the Integration Wizard-Scheduling Tools
    • Process Running Page of the wInsight Wizard
    • Progress Page of the Integration Wizard-Scheduling Tools
    • Spread Curves Tab of the Application Preferences Dialog Box
    • Preparing the Primavera Schedule
    • Report Template Format
    • Process Logs
    • Date Selection Page of the Integration Wizard-MS Project
    • Action Selection Page of the Integration Wizard
    • Data Dictionary
    • Resource Assignments Page of the Integration Wizard-Open Plan
    • Results Page of the ANSI EIA X12 Wizard
    • Examples of Manual Forecast Calculations
    • Spreadsheet Pane of the Project View
    • Process Running Page of the Project Audit Wizard
    • Perform Apportionment Mapping
    • Report Criterion Parameters
    • File Format for Importing Apportionment Mapping
    • Use a Code File in Multiple Projects
    • Work Package Codes Page of the wInsight Wizard
    • Validity Check Process
    • Project Codes Tab of the Application Preferences Dialog Box
    • Codes
    • Sub-Totals Page of the Report Wizard
    • Class and Results Page of the Integration Wizard
    • Merge Sub-Projects into a New Project
    • Reporting
    • General Information Page of the New Project Wizard
    • Back Up Your Data
    • Deletion Criteria Dialog Box of the Integration Wizard
    • Projects
    • Process Running Page of the Export Calendar to Open Plan Wizard
    • Integration Configuration Page of the Integration Wizard
    • Progress Page of the Integration Wizard-Files
    • Integration Wizard
    • Status Page of the Integration Wizard-Scheduling Tools
    • Date Selection Page of the Integration Wizard-Open Plan
    • Change Control Page of the Integration Wizard
    • General Tab of the Application Preferences Dialog Box
    • Export Structures Page of the wInsight Wizard
    • Results Page of the Integration Wizard
    • Process Complete Page of the ANSI EIA X12 Wizard
    • Field Mapper Page of the Integration Wizard
    • Sub-Projects Validation Dialog Box
    • Merge Sub-Projects into a New Project
    • EPM Security Administrator Functions
    • Confirmation Page of the ANSI EIA X12 Wizard
    • Resources and Rates Page of the Integration Wizard
    • Project Selection Page of the Calculate Forecast Wizard
    • Project Selection Page of the Update Totals Wizard
    • Status Page of the Integration Wizard-Files
    • Report Categories
    • Integration Tab of the Application Preferences Dialog Box
    • Schedule Mapping Page of the Integration Wizard-Primavera
    • File Format for Importing Status Information
    • General Information Page of the New Code File Wizard
    • Select Configuration Page of the Update Open Plan Resources Wizard
    • Data Import-Ancillary Data
    • Examples of Forecast Calculations
    • Apportionment Setup Steps
    • Miscellaneous Page of the wInsight Wizard
    • Resource Assignments Page of the Integration Wizard-Files
    • Set the Date Format
    • Calendars
    • Actual Cost Import File
    • Cost Sets Page of the Report Wizard
    • Modify the Cobra.WinUI.Exe.Config File in the Workstation Folder (netTcpBinding Message Level)
    • Data Import-Budget Data
    • Manage Sorts Dialog Box of the Report Wizard
    • Hook Program Methods
    • Insert a Column in a View
    • Import File Validation
    • File Selection Page of the Integration Wizard
    • Integrate Ancillary Data Process
    • Filter Page of the Integration Wizard-Files
    • Notes Page of the Integration Wizard
    • File Selection Page of the Integration Wizard
    • Set Up a Retain EAC Forecast with the Scale EAC Option
    • SQL Command Process
    • General Information Page of the New Calendar File Wizard
    • Custom Cost Classes
    • Multiproject Operations (Master and Subprojects)
    • Apportionment Process
    • Process Running Page of the Export Calendar to Open Plan Wizard
    • Edit Connection Dialog Box of the Integration Wizard-Primavera
    • Report Types
    • Add Results to a Resource
    • How Cobra Spreads ETC
    • User Preferences Dialog Box
    • Integration Configuration Page of the Integration Wizard
    • New Connection Dialog Box of the Integration Wizard-MS Project
    • Data Import Using Scheduling Tools and Files
    • Code View
    • XML Configuration File
    • Process Running Page of the ANSI EIA X12 Wizard
    • Modify the Cobra.Api.Exe.Config File in the Workstation Folder
    • Custom Project Tables
    • Sample Earned Value Calculation
    • Configuration Page of the wInsight Wizard
    • Integration Configuration Page of the Integration Wizard
    • Advance Calendar
    • Preparing the Open Plan Schedule
    • Guidelines for Accurate Earned Value Management
    • Preparing Cobra for Schedule Integration
    • Results Tab of the Resource File Properties Dialog Box
    • Forecast Calculations
    • Template Resource Files
    • Calendar Page of the Integration Wizard
    • Import Budget Data into Cobra
    • Log Operation Page of the Project Audit Wizard
    • Customization of Integration Process
    • Flag Periods
    • Log Change Comment Dialog Box
    • Data Import from Primavera
    • Data Anomaly Validations Page of the Validity Check Wizard
    • Log Significant Changes for IPMR Format 3 Reports
    • wInsight Database Page of the wInsight Wizard
    • New Connection Dialog Box of the Integration Wizard-Primavera
    • Save As Dialog Box (Projects)
    • Integration Wizard Preferences
    • Edit Exported Data in Excel
    • Copy Project Process
    • Element of Cost Page of the wInsight Wizard
    • Edit Column Dialog Box
    • Schedule Mapping Page of the Integration Wizard-Open Plan
    • Export Structures Page of the ANSI EIA X12 Wizard
    • IPMR Format 2 Summary Page of the wInsight Wizard
    • Options Page of the Replan Wizard
    • Cobra 8.4 Help System
    • Shortcut Menu
    • Planning Reports
    • Examples of Statistical Forecast Calculations
    • Codes Page of the Integration Wizard-MS Project
    • Project Selection Page of the Calculate Progress Wizard
    • XML Configuration Object Interface
    • Validate Code Assignments — Solve Roll-Up Issues
    • Process Log Viewer
    • New Sort Expression Dialog Box of the Report Wizard
    • Project Selection Page of the Assignment Import/Assignment Export Wizard
    • Status Page of the Integration Wizard
    • Save As Dialog Box (Projects)
    • Style Page of the Report Wizard
    • Edit Connection Dialog Box of the Integration Wizard-MS Project
    • Codes
    • Filter Page of the Integration Wizard
    • Default Rates Page of the New Resource File Wizard
    • Process Complete Page of the wInsight Wizard
    • Edit Sort Expression Dialog Box of the Report Wizard
    • Run the Rolling Wave Process
    • Process Logs Dialog Box
    • Manage Filters Dialog Box of the Report Wizard
    • Codes Page of the Integration Wizard-Open Plan
    • Data Formats
    • Date Range Page of the Recalc Wizard
    • Calendar Sets
    • Resource Components
    • Customization of Processes
    • Options Page of the Advance Calendar Wizard
    • Column Reports
    • Shortcut Menu
    • Ancillary Files Page of the New Project Wizard
    • Time-phased Reports
    • Status File Field Mapper Page of the Integration Wizard
    • Reports Tab of the Application Preferences Dialog Box
    • Date Selection Page of the Integration Wizard-Primavera
    • Options Page of the ANSI EIA X12 Wizard
    • Included Costs Page of the Integration Wizard
    • Set Up Projects and Project Baselines
    • Report Templates
  • data conversion
  • data export
    • SQL Command Utility
    • Narrative Export Process
    • Export Structures Page of the Cost Data Wizard
    • Cost Sets Page of the Cost Data Wizard
    • Export Cost Data
    • Process Complete Page of the Cost Data Wizard
    • Project and Format Page of the Cost Data Wizard
    • SQL Command Process
    • User Preferences Dialog Box
    • wInsight Wizard
    • Configuration Page of the wInsight Wizard
    • Configuration Selection Page of the Cost Data Wizard
    • Cost Data Wizard
    • Cost Data Export
    • Cobra to wInsight Data Export
    • Cobra 8.4 Help System
    • Confirmation Page of the Cost Data Wizard
    • Data Export
    • Access Control Page of the Cost Data Wizard
    • Process Running Page of the Cost Data Wizard
    • Data Formats
    • wInsight DTD
    • Save and Run Page of the Cost Data Wizard
  • data import
    • Save and Load Page of the Integration Wizard
    • Edit Exported Data in Excel
  • data import actual cost
    • Confirmation Page of the Integration Wizard
    • Save and Load Page of the Integration Wizard
    • First Result and Derived Costs
    • Class and Results Page of the Integration Wizard
    • Cumulative versus Current Period Costs
    • Process Running Page of the Integration Wizard
    • Process Running Page of the Integration Wizard
    • Integration Configuration Page of the Integration Wizard
    • The Field Mapper
    • Field Mapper Page of the Integration Wizard
    • Import File Preparation
    • Entering Actual Costs
    • Actual Cost Import File
    • Import File Validation
    • Master Project Versus Individual Projects
    • Integration Configuration Page of the Integration Wizard
    • Entering Actual Costs Using an Import File
    • Control Account Fields Versus Codes
    • Cost Classes
    • Loading Actual Cost Records from a CSV File
    • Integration Wizard-Actual Costs
    • File Selection Page of the Integration Wizard
    • Database Table Selection Page of the Integration Wizard
    • Data Import-Actual Costs
    • Access Control Page of the Integration Wizard
    • Process Complete Page of the Integration Wizard
    • Entering Actual Costs Manually
    • Data Formats
    • Control Account Versus Work Package Level
    • Included Costs Page of the Integration Wizard
    • Options Page of the Integration Wizard
  • data import ancillary data
  • data import apportionment definition
    • Process Running Page of the Integration Wizard
    • Integration Wizard-Apportionment Definition and Mapping Data
    • Process Complete Page of the Integration Wizard
    • File Selection Page of the Integration Wizard
    • Data Import-Apportionment Definition
    • Edit Exported Data in Excel
    • Data Import-Apportionment Definition and Mapping Data
    • Data Import-Apportionment Mapping
    • File Format for Importing Apportionment Definition
    • Confirmation Page of the Integration Wizard
  • data import apportionment mapping
    • Process Running Page of the Integration Wizard
    • Integration Wizard-Apportionment Definition and Mapping Data
    • Process Complete Page of the Integration Wizard
    • File Selection Page of the Integration Wizard
    • Edit Exported Data in Excel
    • Data Import-Apportionment Definition and Mapping Data
    • Data Import-Apportionment Mapping
    • File Format for Importing Apportionment Definition
    • Confirmation Page of the Integration Wizard
  • data import budget data
  • data import status data
  • data locking
  • data options
  • data source
    • ODBC DSN
    • Cobra Database
  • data tool
    • ODBC DSN
    • Add Results to a Resource
    • Cobra Database
    • Results Tab of the Resource File Properties Dialog Box
  • database
    • Data Tool
    • Save and Load Page of the Integration Wizard
    • Data Access Tab of the Application Preferences Dialog Box
    • SQL Command Utility
    • Preparing the Primavera Schedule
    • Process Logs
    • Data Dictionary
    • Report Criterion Parameters
    • Work Package Codes Page of the wInsight Wizard
    • Send a Message to Users
    • Integration Configuration Page of the Integration Wizard
    • Results Page of the Integration Wizard
    • Recalc Preferences
    • Configure Cobra to Work with Microsoft Project Server
    • Miscellaneous Page of the wInsight Wizard
    • Batch Reports Dialog Box
    • Integrate Ancillary Data Process
    • Edit Connection Dialog Box of the Integration Wizard-Primavera
    • Integration Configuration Page of the Integration Wizard
    • New Connection Dialog Box of the Integration Wizard-MS Project
    • Configuration Page of the wInsight Wizard
    • Integration Configuration Page of the Integration Wizard
    • Preparing the Open Plan Schedule
    • Cobra Database
    • Results Tab of the Resource File Properties Dialog Box
    • Display a Login Message
    • wInsight Database Page of the wInsight Wizard
    • New Connection Dialog Box of the Integration Wizard-Primavera
    • Edit Connection Dialog Box of the Integration Wizard-MS Project
    • Process Logs Dialog Box
    • SQL Language Extended Support
    • Results or Field Names
  • database table selection page
  • date range page
    • Date Range Page of the Respread Wizard
    • Date Range Page of the Recalc Wizard
    • Date Range Page of the Zero-Out Data Wizard
    • Date Range Page of the Reclass Wizard
  • date selection page
    • Date Selection Page of the Integration Wizard-MS Project
    • Date Selection Page of the Integration Wizard-Open Plan
    • Date Selection Page of the Integration Wizard
    • Date Selection Page of the Integration Wizard-Primavera
  • dcde
    • Export Cost Data
    • Exported Cost Data File
    • Procedures
    • Data Options Page of the Cost Data Wizard
    • Cost Data Wizard
    • Configure Calendar Set 19 for IPMR Reports, wInsight Integration, and Cost Data Export/DCDE Format
    • Cost Data Export
    • Save and Run Page of the Cost Data Wizard
  • DCDE
    • Export Cost Data
    • Procedures
    • Data Options Page of the Cost Data Wizard
    • Cost Data Wizard
    • Cost Data Export
  • debug logs
    • Data Access Tab of the Application Preferences Dialog Box
    • ProcessLog.xml Log File
    • Procedures
    • Log SQL Statements in ClientDebugLog.xml
    • Debug Logs
    • ClientDebugLog.xml Log File
    • Log Memory Usage Details
    • Disable the Automatic Archiving of ClientDebugLog.xml Log File
    • Edit IdeaBlade.ibconfig File
    • ServerDebugLog.xml Log File
    • Log SQL Statements in ServerDebugLog.xml
    • Logging of Memory Usage Details
  • debugging
    • Log Memory Usage Details
    • Logging of Memory Usage Details
  • definition and mapping
    • Process Running Page of the Integration Wizard
    • Integration Wizard-Apportionment Definition and Mapping Data
    • Process Complete Page of the Integration Wizard
    • File Selection Page of the Integration Wizard
    • Edit Exported Data in Excel
    • Data Import-Apportionment Definition and Mapping Data
    • Data Import-Apportionment Mapping
    • File Format for Importing Apportionment Definition
    • Confirmation Page of the Integration Wizard
  • delete calendar periods
  • delete holiday
  • deltek common data
    • Export Structures Page of the Cost Data Wizard
    • Cost Sets Page of the Cost Data Wizard
    • Process Complete Page of the Cost Data Wizard
    • Procedures
    • Project and Format Page of the Cost Data Wizard
    • Data Options Page of the Cost Data Wizard
    • Integration Tab of the Application Preferences Dialog Box
    • Configuration Selection Page of the Cost Data Wizard
    • Cost Data Wizard
    • Cost Data Export
    • Confirmation Page of the Cost Data Wizard
    • Access Control Page of the Cost Data Wizard
    • Process Running Page of the Cost Data Wizard
    • Save and Run Page of the Cost Data Wizard
  • deltek cost data
  • details tab
    • Details Tab of the Resource View
    • Details Tab of the Code View
  • developer resources
  • dialog box
    • Display the Rate File Properties Dialog Box Tabs without Opening a Rate File
    • Code Assignments Tab of the Project Properties Dialog Box
    • Resource Assignments Page of the Assignment Import/Assignment Export Wizard
    • Class Settings Page for Actuals Class of the New Class Wizard
    • Confirmation Page of the New Project Wizard
    • Rename Work Package Dialog Box
    • Application Preferences
    • Criteria Page of the Slip Wizard
    • Copy Batch Report Dialog Box
    • Enable a User to Access a Resource File
    • Insert Column Dialog Box
    • Data Access Tab of the Application Preferences Dialog Box
    • Resource Assignment Percent Complete Dialog Box
    • Code Fields Tab of the Resource File Properties Dialog Box
    • Associate a Budget Class with a Forecast Actual or Earned Class
    • Rename Dialog Box
    • Add Work Package Dialog Box
    • Reorder Resources
    • Spread Curves Tab of the Application Preferences Dialog Box
    • Analyze Preferences
    • General Tab of the Code File Properties Dialog Box
    • Errors Dialog Box of the Process Log Viewer
    • Rename a Work Package
    • Backup Dialog Box
    • Settings Page of the New Project Wizard
    • Confirmation Page of the New Resource File Wizard
    • Copy Work Package Dialog Box
    • Copy Project Codes Dialog Box
    • Perform Apportionment Mapping
    • Copy Preferences Dialog Box
    • New Filter Dialog Box of the Report Wizard
    • Calendar File Properties Dialog Box
    • Copy Control Account Dialog Box
    • Reorder Resources/Codes Dialog Box
    • Progress Techniques
    • Save the Contents of the Spreadsheet Pane as an Excel File
    • Analyze Options Dialog Box
    • Rename an Ancillary File
    • Spread Budgets Using Pre-defined Spread Methods
    • Project Codes Tab of the Application Preferences Dialog Box
    • Create a New Resource File
    • Display the Open File Dialog Box
    • Resource File Security
    • Thresholds Tab of the Code View
    • Calculations Tab of the Resource View
    • Project Selection Page of the Respread Wizard
    • Merge Sub-Projects into a New Project
    • Display the Resource File Properties Dialog Box Tabs from an Open Resource File
    • General Information Page of the New Project Wizard
    • Thresholds Page of the New Code File Wizard
    • Back Up Your Data
    • Actual Costs Preferences
    • Copy Down Code Assignments to Child Resources
    • Apportionment Definition Tab of the Resource View
    • Deletion Criteria Dialog Box of the Integration Wizard
    • Cobra Login Dialog Box
    • Copy Project Preferences
    • New Filter Expression Dialog Box of the Report Wizard
    • Replan Preferences
    • Access Control Tab of the Resource File Properties Dialog Box
    • Report Properties Dialog Box
    • Copy Child Resources to a Resource
    • Access Control Tab of the Code File Properties Dialog Box
    • General Tab of the Application Preferences Dialog Box
    • Change Password Dialog Box
    • Code Fields Page of the New Code File Wizard
    • Calculate Hours Dialog Box
    • Files Tab of the Project Properties Dialog Box
    • Edit Calendar Sets
    • Backup Dialog Box
    • Sub-Projects Validation Dialog Box
    • Merge Sub-Projects into a New Project
    • Include in Actuals Cost Set Page of the New Class Wizard
    • Add a New Work Package using the Dialog Box
    • EPM Security Administrator Functions
    • Add Control Account Dialog Box
    • Preferences Tab of the Project Properties Dialog Box
    • Rename Control Account Dialog Box
    • Project Selection Page of the Update Totals Wizard
    • Report Categories
    • Recalc Preferences
    • Integration Tab of the Application Preferences Dialog Box
    • Save As Dialog Box (Merging Projects)
    • Update EAC Dialog Box
    • Add Apportionment Source Dialog Box
    • Find Dialog Box
    • Apportionment Dialog Box
    • General Information Page of the New Code File Wizard
    • Save a Project as a Different Project
    • About Deltek Cobra Dialog Box
    • Results Page of the Report Wizard
    • Reorder Resources/Codes Dialog Box
    • Details Tab of the Code View
    • Project Dates Page of the New Project Wizard
    • General Information Page of the New Class Wizard
    • Project Code Assignments Page of the New Project Wizard
    • Open Dialog Box of the Calculated Results Wizard
    • Apportionment Setup Steps
    • Set a Maximum Number of Login Tries
    • Set the Date Format
    • Display the New Project Wizard
    • Resource-Loaded Schedule
    • Calendars
    • Delete a Result from a Resource
    • Change Password Dialog Box
    • Additional Information in Resources
    • Save As Dialog Box (Ancillary Files)
    • Associate an Earned Value Class with a Forecast Class
    • Locate Custom Application Dialog Box
    • Copy a Work Package
    • Batch Reports Dialog Box
    • Insert a Column in a View
    • General Tab of the Classes Tab
    • Configure the Application Settings
    • Add a Resource Assignment
    • Other Tab of the Application Preferences Dialog Box
    • Import Location Page of the Assignment Import Wizard
    • Access Control Page of the New Code File Wizard
    • General Tab of the Resource File Properties Dialog Box
    • Progress Techniques
    • Order Resource Results Dialog Box
    • Assign a Calendar Set to a Forecast or Budget Class
    • Confirmation Page of the New Class Wizard
    • Open File Dialog Box
    • Move a Work Package
    • Open File Dialog Box
    • Codes Grid of the Code View
    • Run the Rolling Wave Process Without Advancing the Calendar
    • Code Fields Page of the New Resource File Wizard
    • Code File Properties Dialog Box
    • Add Results to a Resource
    • Target Class Page of the Reclass Wizard
    • User Preferences Dialog Box
    • Calculated Results Dialog Box
    • Copy Existing Cost Sets to a Project
    • Structure Tab of the Resource File Properties Dialog Box
    • Code View
    • Lookup Dialog Box
    • Move a Control Account
    • Add Calculated Result Dialog Box of the Calculated Results Wizard
    • Advance Calendar
    • Preparing the Open Plan Schedule
    • Thresholds Page of the New Resource File Wizard
    • Rename a Control Account
    • Results Tab of the Resource File Properties Dialog Box
    • Enable a User to Access a Code File
    • Move Work Package Dialog Box
    • Class Settings Page for Earned Class of the New Class Wizard
    • New Sort Dialog Box of the Report Wizard
    • Include in EAC Cost Set Page of the New Class Wizard
    • Notes Tab of the Resource View
    • Purge Dialog Box
    • Flag Periods
    • Display a Login Message
    • Log Change Comment Dialog Box
    • SQL Command Utility Dialog Box
    • Copy Calculated Result Dialog Box of the Calculated Results Wizard
    • Reclass Preferences
    • Procedures
    • Add a New Control Account using the Dialog Box
    • Adjust Budget Spreads Manually
    • Delete a Code
    • Display the Code File Properties Dialog Box Tabs without Opening a Code File
    • Display the Resource File Properties Dialog Box Tabs without Opening a Resource File
    • Reconcile Milestone Weights
    • Create a New Code File
    • Save Graph Reports as Graphic Files
    • Access Control Page of the New Project Wizard
    • Save As Dialog Box (Projects)
    • Integration Wizard Preferences
    • Criteria Selection Page of the Recalc Wizard
    • Run the SQL Command Utility
    • Move Control Account Dialog Box
    • Configuration Security Dialog Box
    • Enable a Group to Access a Calendar File
    • Code Fields Tab of the Rate File Properties Dialog Box
    • Copy Narrative Information
    • Edit Column Dialog Box
    • Copy Codes to Another Project
    • New File Dialog Box
    • Options Page of the Replan Wizard
    • Spread Curve Dialog Box
    • Code File Structure Page of the New Code File Wizard
    • Set Maximum Time of Inactivity
    • Shortcut Menu
    • Perform Project Analysis
    • Sub-Projects Page of the New Project Wizard
    • Add Apportionment Target Dialog Box
    • Thresholds Tab of the Resource View
    • Confirmation Page of the New Code File Wizard
    • Earned Preferences
    • Run the Rolling Wave Process Without Advancing the Calendar
    • Display the Open File Dialog Box
    • New Sort Expression Dialog Box of the Report Wizard
    • Project Selection Page of the Assignment Import/Assignment Export Wizard
    • Turn Windows Authentication On or Off
    • Access Control Tab of the Project Properties Dialog Box
    • Save As Dialog Box (Projects)
    • Resource Selection Page of the Replace Resources Wizard
    • Resource File Structure Page of the New Resource File Wizard
    • Criteria Page of the Reclass Wizard
    • Project Selection Page of the Top-Down Planning Wizard
    • Cobra Login Dialog Box
    • New File Dialog Box
    • Default Rates Page of the New Resource File Wizard
    • Copy Resource Calculations Dialog Box
    • Edit Calendar Set Dialog Box
    • Cost Sets Tab of the Project Properties Dialog Box
    • Edit Sort Expression Dialog Box of the Report Wizard
    • Select Files to Restore Dialog Box
    • Process Logs Dialog Box
    • Include in Budget Cost Set Page of the New Class Wizard
    • Column Width Dialog Box
    • Resource-Loaded Schedule
    • Calendar View
    • Cost Sets Page of the Freeze Forecast Wizard
    • Results Pane of the Analyze Form
    • Warnings Dialog Box of the Process Log Viewer
    • Date Range Page of the Recalc Wizard
    • Save As Dialog Box (Ancillary Files)
    • Calendar Sets
    • Rename a Project
    • Reorder Codes
    • Shortcut Menu
    • Add Resource Results Dialog Box
    • Ancillary Files Page of the New Project Wizard
    • Copy a Control Account
    • Reports Tab of the Application Preferences Dialog Box
    • Access Control Page of the New Resource File Wizard
    • Add Batch Report Dialog Box
    • Reconcile Milestone Weight Variance Dialog Box
    • Fields Page of the New Project Wizard
  • dsn
  • eac
  • earned
  • earned value
    • Performance Data Page of the wInsight Wizard
    • Milestones/Steps
    • Class Settings Page for Actuals Class of the New Class Wizard
    • Add a Second Earned Value Class to Your Project
    • Code Files
    • Select the Earned Value Method
    • ANSI Standard for Earned Value Management Systems
    • Associate a Budget Class with a Forecast Actual or Earned Class
    • Color Band
    • Progress Page of the Integration Wizard-Scheduling Tools
    • Add Work Package Dialog Box
    • Process Logs
    • Confirmation Page of the Calculate Progress Wizard
    • Results Page of the ANSI EIA X12 Wizard
    • Examples of Manual Forecast Calculations
    • Spreadsheet Pane of the Project View
    • Audit Reports
    • Thresholds Tab of the Code File Properties Dialog Box
    • Method Page of the Replan Wizard
    • Turn On the Opening % Feature When Integrating with Open Plan
    • Progress Techniques
    • Calculate Progress Wizard
    • Thresholds Tab of the Code View
    • Reporting
    • Thresholds Page of the New Code File Wizard
    • Calculate Progress
    • Apportionment Definition Tab of the Resource View
    • Earned Value Management
    • Projects
    • Replan Preferences
    • Project and Apportionment Validations Page of the Validity Check Wizard
    • Progress Page of the Integration Wizard-Files
    • Status Page of the Integration Wizard-Scheduling Tools
    • General Tab of the Application Preferences Dialog Box
    • Files Tab of the Project Properties Dialog Box
    • Statistical Forecasts
    • Options Page of the Calculate Progress Wizard
    • Status Page of the Integration Wizard-Files
    • Supported Processes, Operations, and Data
    • Select the Level at Which to Capture Actual Costs
    • Select EVMS Acceptance for a Project
    • Resources
    • Examples of Forecast Calculations
    • Apportionment Setup Steps
    • Calendars
    • Calculate Progress
    • Associate an Earned Value Class with a Forecast Class
    • General Tab of the Classes Tab
    • Classes Tab of the Project Properties Dialog Box
    • Process Running Page of the Calculate Progress Wizard
    • How Cobra Calculates Progress to Determine Earned Value
    • Progress Techniques
    • Connecting to the Cobra Web Service Host
    • Custom Cost Classes
    • Multiproject Operations (Master and Subprojects)
    • How Cobra Spreads ETC
    • Target Class Page of the Reclass Wizard
    • Data Import Using Scheduling Tools and Files
    • Sample Earned Value Calculation
    • Preparing the Open Plan Schedule
    • Guidelines for Accurate Earned Value Management
    • Thresholds Page of the New Resource File Wizard
    • Resource Assignments
    • Forecast Calculations
    • Possible Sources of Errors
    • Creating Service Operations Classes
    • Element of Cost Page of the wInsight Wizard
    • Earned Value Methods
    • Options Page of the Replan Wizard
    • Cobra 8.4 Help System
    • Planning Reports
    • Examples of Statistical Forecast Calculations
    • Project Selection Page of the Calculate Progress Wizard
    • Procedures
    • Thresholds Tab of the Resource View
    • Earned Preferences
    • Status Page of the Integration Wizard
    • Resources
    • Advance Calendar Process
    • Cobra Web Service
    • Process Complete Page of the Calculate Progress Wizard
    • Milestones/Steps Tab of the Project View
    • Options Page of the Calculate Forecast Wizard
    • Process Logs Dialog Box
    • Select the Level at Which to Capture Actual Costs
    • Include in Budget Cost Set Page of the New Class Wizard
    • Calendar View
    • Included Budget Classes Tab of the Classes Tab
    • Column Reports
    • Ancillary Files Page of the New Project Wizard
    • Status File Field Mapper Page of the Integration Wizard
    • Control Account Versus Work Package Level
    • Set Up Projects and Project Baselines
  • earned value method
  • earned value page
    • Progress Page of the Integration Wizard-Scheduling Tools
    • Progress Page of the Integration Wizard-Files
    • Progress Page of the Integration Wizard
  • earned value technique
    • Progress Techniques
    • Progress Techniques
  • edit batch report
  • edit batch report dialog box
    • Access Control Tab of the Edit Batch Report Dialog Box
    • Display the Edit Batch Report Dialog Box
  • edit calendar set
  • edit connection dialog box
    • Edit Connection Dialog Box of the Integration Wizard
    • Edit Connection Dialog Box of the Integration Wizard-Primavera
    • Edit Connection Dialog Box of the wInsight Wizard
    • Edit Connection Dialog Box of the Integration Wizard-MS Project
  • edit filter expression dialog box
  • edit sort expression dialog box
  • edit tab
  • element
    • Element of Cost Page of the wInsight Wizard
    • Element of Cost
  • element of cost
    • Details Tab of the Resource View
    • Sub-Totals Page of the Report Wizard
    • Resources Grid of the Resource View
    • Assign Element of Cost to a Resource
    • Copy Element of Cost Value to Child Resources
    • Cost Data Export
    • Element of Cost Page of the wInsight Wizard
    • Element of Cost
  • element of cost page
  • eoc
    • Details Tab of the Resource View
    • Sub-Totals Page of the Report Wizard
    • Resources Grid of the Resource View
    • Assign Element of Cost to a Resource
    • Copy Element of Cost Value to Child Resources
    • Cost Data Wizard
    • Cost Data Export
    • Element of Cost Page of the wInsight Wizard
    • Element of Cost
  • EOC
    • Cost Data Export
    • Element of Cost
  • estimate
  • evms
  • evt
    • Milestones/Steps
    • Import File Field Mapper Page of the Integration Wizard
    • Resource Assignment Percent Complete Dialog Box
    • Calculate Progress Process
    • Assign a Progress Technique to a Work Package
    • Progress Page of the Integration Wizard-Scheduling Tools
    • Add Work Package Dialog Box
    • Preparing the Primavera Schedule
    • Audit Reports
    • Turn On the Opening % Feature When Integrating with Open Plan
    • Progress Page of the Integration Wizard-Files
    • Status Page of the Integration Wizard-Scheduling Tools
    • General Tab of the Application Preferences Dialog Box
    • Spreadsheet Pane Column Definitions
    • Apportionment Setup Steps
    • Calculate Progress
    • How Cobra Calculates Progress to Determine Earned Value
    • Sample Earned Value Calculation
    • Preparing the Open Plan Schedule
    • Guidelines for Accurate Earned Value Management
    • Preparing Cobra for Schedule Integration
    • Earned Preferences
    • Milestones/Steps Tab of the Project View
    • Status File Field Mapper Page of the Integration Wizard
    • Set Up Projects and Project Baselines
  • explorer
  • export calendar
    • Process Complete Page of the Export Calendar to Open Plan Wizard
    • Process Running Page of the Export Calendar to Open Plan Wizard
    • Process Running Page of the Export Calendar to Open Plan Wizard
    • Confirmation Page of the Export Calendar to Open Plan Wizard
  • export calendar op wizard
    • Process Running Page of the Export Calendar to Open Plan Wizard
    • Process Running Page of the Export Calendar to Open Plan Wizard
    • Confirmation Page of the Export Calendar to Open Plan Wizard
  • export calendar to op wizard
    • Calendar Export to Open Plan
    • Export Calendar to Open Plan Wizard
    • Process Running Page of the Export Calendar to Open Plan Wizard
    • Process Running Page of the Export Calendar to Open Plan Wizard
    • Calendar Selection Page of the Export Calendar to Open Plan Wizard
  • export calendar to opwizard
    • Procedures
    • Export a Calendar to Open Plan
  • export location page
  • export structures page
    • Export Structures Page of the Cost Data Wizard
    • Export Structures Page of the wInsight Wizard
    • Export Structures Page of the ANSI EIA X12 Wizard
  • field mapper page
  • field name
    • Data Tool
    • Rename Work Package Dialog Box
    • Insert Column Dialog Box
    • Color Band
    • Copy Control Account Dialog Box
    • General Tab of the Application Preferences Dialog Box
    • Add Control Account Dialog Box
    • Rename Control Account Dialog Box
    • Resources
    • Resource File Information Tags
    • Insert a Column in a View
    • Results Tab of the Resource File Properties Dialog Box
    • Edit Column Dialog Box
    • Considerations When Creating Field Names
    • Resource Calculation Tags
    • Resources
    • Add Resource Results Dialog Box
    • Status File Field Mapper Page of the Integration Wizard
    • Results or Field Names
  • file
    • Performance Data Page of the wInsight Wizard
    • Confirmation Page of the Integration Wizard
    • Milestones/Steps
    • Import File Field Mapper Page of the Integration Wizard
    • Class Settings Page for Actuals Class of the New Class Wizard
    • Confirmation Page of the New Project Wizard
    • Enable a User to Access a Resource File
    • Insert Column Dialog Box
    • Save and Load Page of the Integration Wizard
    • Data Access Tab of the Application Preferences Dialog Box
    • Access Control Tab of the Calendar File Properties Dialog Box
    • SQL Command Utility
    • Filter Page of the Integration Wizard-Scheduling Tools
    • Process Running Page of the wInsight Wizard
    • Progress Page of the Integration Wizard-Scheduling Tools
    • Rename Dialog Box
    • Reorder Resources
    • Analyze Preferences
    • First Result and Derived Costs
    • Preparing the Primavera Schedule
    • Report Template Format
    • Errors Dialog Box of the Process Log Viewer
    • Process Logs
    • Settings Page of the New Project Wizard
    • Date Selection Page of the Integration Wizard-MS Project
    • Action Selection Page of the Integration Wizard
    • Confirmation Page of the New Resource File Wizard
    • Resource Assignments Page of the Integration Wizard-Open Plan
    • Results Page of the ANSI EIA X12 Wizard
    • Spreadsheet Pane of the Project View
    • Restore Process
    • Batch Report Process
    • File Format for Importing Apportionment Mapping
    • Get Cobra Spread Process
    • Reorder Resources/Codes Dialog Box
    • Turn On the Opening % Feature When Integrating with Open Plan
    • Use a Code File in Multiple Projects
    • Save the Contents of the Spreadsheet Pane as an Excel File
    • Work Package Codes Page of the wInsight Wizard
    • Validity Check Process
    • Analyze Options Dialog Box
    • Rename an Ancillary File
    • Spread Budgets Using Pre-defined Spread Methods
    • Create a New Resource File
    • Codes
    • Structure Tab of the Code File Properties Dialog Box
    • Sub-Totals Page of the Report Wizard
    • Resource File Security
    • Thresholds Tab of the Code View
    • Class and Results Page of the Integration Wizard
    • Calculations Tab of the Resource View
    • Variance Thresholds
    • Reporting
    • General Information Page of the New Project Wizard
    • Thresholds Page of the New Code File Wizard
    • Back Up Your Data
    • Copy Down Code Assignments to Child Resources
    • Apportionment Definition Tab of the Resource View
    • Deletion Criteria Dialog Box of the Integration Wizard
    • Projects
    • Export and Import Time-Phased Resource Assignments
    • Delete Calendar Sets
    • Project and Apportionment Validations Page of the Validity Check Wizard
    • Integration Configuration Page of the Integration Wizard
    • Progress Page of the Integration Wizard-Files
    • Integration Wizard
    • Access Control Tab of the Resource File Properties Dialog Box
    • Copy Child Resources to a Resource
    • Access Control Tab of the Code File Properties Dialog Box
    • Status Page of the Integration Wizard-Scheduling Tools
    • Date Selection Page of the Integration Wizard-Open Plan
    • General Tab of the Application Preferences Dialog Box
    • Export Structures Page of the wInsight Wizard
    • Change Password Dialog Box
    • Code Fields Page of the New Code File Wizard
    • Calendars Section of the XML File
    • The Field Mapper
    • Deploy the Cobra Web Service ClientAPI
    • Calculate Hours Dialog Box
    • Files Tab of the Project Properties Dialog Box
    • Edit Calendar Sets
    • Results Page of the Integration Wizard
    • Process Complete Page of the ANSI EIA X12 Wizard
    • Field Mapper Page of the Integration Wizard
    • Report Wizard
    • Include in Actuals Cost Set Page of the New Class Wizard
    • EPM Security Administrator Functions
    • EarnedValues Section of the XML File
    • Confirmation Page of the ANSI EIA X12 Wizard
    • Resources and Rates Page of the Integration Wizard
    • Status Page of the Integration Wizard-Files
    • Report Categories
    • Integration Tab of the Application Preferences Dialog Box
    • Select the Level at Which to Capture Actual Costs
    • Schedule Mapping Page of the Integration Wizard-Primavera
    • Ancillary File Validations Page of the Validity Check Wizard
    • General Information Page of the New Code File Wizard
    • Save a Project as a Different Project
    • Reorder Resources/Codes Dialog Box
    • Details Tab of the Code View
    • Configure Cobra to Work with Microsoft Project Server
    • Project Dates Page of the New Project Wizard
    • General Information Page of the New Class Wizard
    • Data Import-Ancillary Data
    • Project Code Assignments Page of the New Project Wizard
    • Miscellaneous Page of the wInsight Wizard
    • Backup Project Process
    • Resource Assignments Page of the Integration Wizard-Files
    • Display the New Project Wizard
    • Resource-Loaded Schedule
    • Actual Cost Import File
    • Delete a Result from a Resource
    • Cost Sets Page of the Report Wizard
    • Variance Thresholds
    • Modify the Cobra.WinUI.Exe.Config File in the Workstation Folder (netTcpBinding Message Level)
    • Required Template Files
    • Change Password Dialog Box
    • Save As Dialog Box (Ancillary Files)
    • Manage Sorts Dialog Box of the Report Wizard
    • Process Complete Page of the Assignment Import/Assignment Export Wizard
    • Hook Program Methods
    • Locate Custom Application Dialog Box
    • Batch Reports Dialog Box
    • General Tab of the Classes Tab
    • Add a Resource Assignment
    • Import File Validation
    • File Selection Page of the Integration Wizard
    • Import Location Page of the Assignment Import Wizard
    • Integrate Ancillary Data Process
    • Confirmation Page of the New Calendar File Wizard
    • Filter Page of the Integration Wizard-Files
    • Notes Page of the Integration Wizard
    • Log SQL Statements in ClientDebugLog.xml
    • Access Control Page of the New Code File Wizard
    • File Selection Page of the Integration Wizard
    • Master Project Versus Individual Projects
    • Create Project from Template Process
    • SQL Command Process
    • General Tab of the Resource File Properties Dialog Box
    • General Information Page of the New Calendar File Wizard
    • Custom Cost Classes
    • Order Resource Results Dialog Box
    • Confirmation Page of the New Class Wizard
    • Open File Dialog Box
    • Codes and the Integration Wizard
    • Open File Dialog Box
    • Delete a Resource from a Resource File
    • Edit Connection Dialog Box of the Integration Wizard-Primavera
    • Codes Grid of the Code View
    • Run the Rolling Wave Process Without Advancing the Calendar
    • Code Fields Page of the New Resource File Wizard
    • Report Types
    • Add Results to a Resource
    • User Preferences Dialog Box
    • Integration Configuration Page of the Integration Wizard
    • New Connection Dialog Box of the Integration Wizard-MS Project
    • Structure Tab of the Resource File Properties Dialog Box
    • Code View
    • Structures Section of the XML File
    • XML Configuration File
    • Process Running Page of the ANSI EIA X12 Wizard
    • Modify the Cobra.Api.Exe.Config File in the Workstation Folder
    • Lookup Dialog Box
    • Assign a Rate Set to a Result
    • Configuration Page of the wInsight Wizard
    • Integration Configuration Page of the Integration Wizard
    • Preparing the Open Plan Schedule
    • Preparing Cobra for Schedule Integration
    • Thresholds Page of the New Resource File Wizard
    • API Script
    • Control Account Fields Versus Codes
    • Results Tab of the Resource File Properties Dialog Box
    • Enable a User to Access a Code File
    • Class Settings Page for Earned Class of the New Class Wizard
    • Units Section of the XML File
    • Include in EAC Cost Set Page of the New Class Wizard
    • Notes Tab of the Resource View
    • Calendar Page of the Integration Wizard
    • Purge Dialog Box
    • Import Budget Data into Cobra
    • Customization of Integration Process
    • Flag Periods
    • SQL Command Utility Dialog Box
    • Periods Page of the New Calendar File Wizard
    • Loading Actual Cost Records from a CSV File
    • Adjust Budget Spreads Manually
    • Delete a Code
    • Reconcile Milestone Weights
    • Create a New Code File
    • wInsight Database Page of the wInsight Wizard
    • Save Graph Reports as Graphic Files
    • New Connection Dialog Box of the Integration Wizard-Primavera
    • Access Control Page of the New Project Wizard
    • Save As Dialog Box (Projects)
    • Integration Wizard Preferences
    • Edit Exported Data in Excel
    • Run the SQL Command Utility
    • Configuration Security Dialog Box
    • Enable a Group to Access a Calendar File
    • Element of Cost Page of the wInsight Wizard
    • Additional Project Files
    • Edit Column Dialog Box
    • Schedule Mapping Page of the Integration Wizard-Open Plan
    • Export Structures Page of the ANSI EIA X12 Wizard
    • IPMR Format 2 Summary Page of the wInsight Wizard
    • New File Dialog Box
    • Cobra 8.4 Help System
    • Code File Structure Page of the New Code File Wizard
    • Data Import-Actual Costs
    • Delete an Existing Holiday from the Calendar
    • Shortcut Menu
    • Sub-Projects Page of the New Project Wizard
    • Codes Page of the Integration Wizard-MS Project
    • XML Configuration Object Interface
    • Thresholds Tab of the Resource View
    • Confirmation Page of the New Code File Wizard
    • Run the Rolling Wave Process Without Advancing the Calendar
    • Process Log Viewer
    • Status Page of the Integration Wizard
    • Disable the Automatic Archiving of ClientDebugLog.xml Log File
    • Save As Dialog Box (Projects)
    • Resource Selection Page of the Replace Resources Wizard
    • Resource File Structure Page of the New Resource File Wizard
    • Edit Connection Dialog Box of the Integration Wizard-MS Project
    • Codes
    • Filter Page of the Integration Wizard
    • New File Dialog Box
    • Default Rates Page of the New Resource File Wizard
    • Copy Resource Calculations Dialog Box
    • Manpowers Section of the XML File
    • Milestones/Steps Tab of the Project View
    • Process Complete Page of the wInsight Wizard
    • Select Files to Restore Dialog Box
    • Process Logs Dialog Box
    • Select the Level at Which to Capture Actual Costs
    • Include in Budget Cost Set Page of the New Class Wizard
    • ServerDebugLog.xml Log File
    • Resource-Loaded Schedule
    • Manage Filters Dialog Box of the Report Wizard
    • Log SQL Statements in ServerDebugLog.xml
    • Calendar View
    • Codes Page of the Integration Wizard-Open Plan
    • Log Comment Page of the Assignment Import/Assignment Export Wizard
    • SQL Language Extended Support
    • Notes Tab of the Project View
    • Warnings Dialog Box of the Process Log Viewer
    • Data Formats
    • Add a Child Code to a Code
    • Save As Dialog Box (Ancillary Files)
    • Period Labels Page of the New Calendar File Wizard
    • API Script to Create a New Project from a Project Template
    • Customization of Processes
    • Rename a Project
    • Options Page of the Advance Calendar Wizard
    • Reorder Codes
    • Shortcut Menu
    • Add Resource Results Dialog Box
    • Ancillary Files Page of the New Project Wizard
    • Status File Field Mapper Page of the Integration Wizard
    • Access Control Page of the New Resource File Wizard
    • Date Selection Page of the Integration Wizard-Primavera
    • Options Page of the ANSI EIA X12 Wizard
    • Included Costs Page of the Integration Wizard
    • Set Up Projects and Project Baselines
    • Report Templates
    • Fields Page of the New Project Wizard
  • file backup
  • file level security
  • file restoration
    • Restore Dialog Box
    • Restore Dialog Box
  • file restore
    • File Restore
    • Restore Data from a Backup File
  • file selection page
    • File Selection Page of the Integration Wizard
    • File Selection Page of the Integration Wizard
    • File Selection Page of the Integration Wizard
  • files tab
  • filter
  • filter and sort page
  • filter page
    • Filter Page of the Integration Wizard-Scheduling Tools
    • Filter Page of the Integration Wizard-Files
    • Filter Page of the Integration Wizard
  • filtering
    • Filters
    • Apply a Filter to a Column in the Spreadsheet Pane
    • Spreadsheet Pane of the Project View
    • Standard Filter Dialog Box
    • Clear the Filter
    • Advanced Filter Dialog Box
    • Filter by Classes or Cost Sets
  • filters
    • Filters
    • Apply a Filter to a Column in the Spreadsheet Pane
    • Spreadsheet Pane of the Project View
    • Standard Filter Dialog Box
    • File Backup
    • Clear the Filter
    • Advanced Filter Dialog Box
  • find
  • find dialog box
  • find function
  • flag period
  • flag periods
  • forecast
    • Calculate Forecast
    • Resource Assignments Page of the Assignment Import/Assignment Export Wizard
    • Export Time-Phased Resource Assignments to Excel
    • Class Settings Page for Actuals Class of the New Class Wizard
    • Application Preferences
    • Coded Ranges Method
    • Progressing
    • Associate a Budget Class with a Forecast Actual or Earned Class
    • Forecast Preferences
    • Procedures
    • Preparing the Primavera Schedule
    • Initialize Forecast Process
    • Process Logs
    • Date Selection Page of the Integration Wizard-MS Project
    • Action Selection Page of the Integration Wizard
    • Resource Assignments Page of the Integration Wizard-Open Plan
    • Examples of Manual Forecast Calculations
    • Spreadsheet Pane of the Project View
    • Baseline Tags
    • Process Running Page of the Calculate Forecast Wizard
    • Reconcile Budgets and Forecasts
    • Validity Check Process
    • Import Time-Phased Resource Assignments from Excel
    • Actual Costs Preferences
    • Apportionment Definition Tab of the Resource View
    • Projects
    • Calculate Forecast Process
    • Process Complete Page of the Calculate Forecast Wizard
    • Project and Apportionment Validations Page of the Validity Check Wizard
    • Integration Configuration Page of the Integration Wizard
    • Status Page of the Integration Wizard-Scheduling Tools
    • Date Selection Page of the Integration Wizard-Open Plan
    • Included Actual Classes Tab of the Classes Tab
    • Statistical Forecasts
    • Include in Actuals Cost Set Page of the New Class Wizard
    • Procedures
    • Project Selection Page of the Calculate Forecast Wizard
    • Status Page of the Integration Wizard-Files
    • Manual Performance Factors Page of the Calculate Forecast Wizard
    • Supported Processes, Operations, and Data
    • Update EAC Dialog Box
    • Schedule Mapping Page of the Integration Wizard-Primavera
    • Assign a Forecast Method to a Forecast Class
    • Project Dates Page of the New Project Wizard
    • Resources
    • General Information Page of the New Class Wizard
    • Examples of Forecast Calculations
    • Apportionment Setup Steps
    • Miscellaneous Page of the wInsight Wizard
    • Resource Assignments Page of the Integration Wizard-Files
    • Associate an Earned Value Class with a Forecast Class
    • General Tab of the Classes Tab
    • Classes Tab of the Project Properties Dialog Box
    • Project Selection Page of the Reclass Wizard
    • Set Up a Retain EAC Forecast with the Scale EAC Option
    • Project Selection Page of the Freeze Forecast Wizard
    • General Information Page of the New Calendar File Wizard
    • Process Complete Page of the Freeze Forecast Wizard
    • Connecting to the Cobra Web Service Host
    • Custom Cost Classes
    • Assign a Calendar Set to a Forecast or Budget Class
    • Multiproject Operations (Master and Subprojects)
    • Apportionment Process
    • Class Information Tags
    • Milestone Tags
    • How Cobra Spreads ETC
    • Target Class Page of the Reclass Wizard
    • Integration Configuration Page of the Integration Wizard
    • Data Import Using Scheduling Tools and Files
    • Integration Configuration Page of the Integration Wizard
    • Advance Calendar
    • Guidelines for Accurate Earned Value Management
    • Preparing Cobra for Schedule Integration
    • Include in EAC Cost Set Page of the New Class Wizard
    • Forecast Calculations
    • Included Earned Classes Tab of the Classes Tab
    • Running the Process or Operation
    • Process Running Page of the Freeze Forecast Wizard
    • Reclass Preferences
    • Creating Service Operations Classes
    • Calculate Forecast Wizard
    • Element of Cost Page of the wInsight Wizard
    • Recalc
    • Frozen Forecasts
    • Schedule Mapping Page of the Integration Wizard-Open Plan
    • Create a Forecast
    • Cobra 8.4 Help System
    • Retain EAC
    • Freeze a Forecast
    • Forecast Details Pane
    • Examples of Statistical Forecast Calculations
    • Take your Implementation a Step Further
    • Status Page of the Integration Wizard
    • Resources
    • Confirmation Page of the Calculate Forecast Wizard
    • Forecasts
    • Project Selection Page of the Top-Down Planning Wizard
    • Cobra Web Service
    • Process Lock
    • Criteria Selection Page of the Freeze Forecast Wizard
    • Forecast Class Selection Page of the Calculate Forecast Wizard
    • Milestones/Steps Tab of the Project View
    • Options Page of the Calculate Forecast Wizard
    • Process Logs Dialog Box
    • Update Totals Process
    • Confirmation Page of the Freeze Forecast Wizard
    • Included Budget Classes Tab of the Classes Tab
    • Cost Sets Page of the Freeze Forecast Wizard
    • Results Pane of the Analyze Form
    • Resource Components
    • Status File Field Mapper Page of the Integration Wizard
    • Control Account Versus Work Package Level
    • Date Selection Page of the Integration Wizard-Primavera
    • Options Page of the ANSI EIA X12 Wizard
    • Manual Forecasts
    • Copy Budget to a Manual Forecast Using the Reclass Wizard
    • Set Up Projects and Project Baselines
    • Reclass a Class
  • forecast class
    • Coded Ranges Method
    • Forecast Details Pane
  • forecast class selection page
  • forecast method
  • format 3
    • Baseline Tags
    • Edit Comment and Change Number Page of the Project Audit Wizard
    • Calendars
    • Log Change Comment Dialog Box
    • Add Resource Results Dialog Box
  • formula
  • freeze forecast
  • freeze forecast wizard
    • Procedures
    • Freeze Forecast
    • Project Selection Page of the Freeze Forecast Wizard
    • Process Complete Page of the Freeze Forecast Wizard
    • Process Running Page of the Freeze Forecast Wizard
    • Freeze a Forecast
    • Freeze Forecast Wizard
    • Criteria Selection Page of the Freeze Forecast Wizard
    • Confirmation Page of the Freeze Forecast Wizard
    • Cost Sets Page of the Freeze Forecast Wizard
  • gateway
  • general information page
    • General Information Page of the New Project Wizard
    • General Information Page of the New Code File Wizard
    • General Information Page of the New Class Wizard
    • General Information Page of the New Calendar File Wizard
    • General Information Page of the New Rate File Wizard
    • General Information Page of the New Resource File Wizard
    • General Information Page of the Add Rate Set Wizard
    • General Information Page of the Update Open Plan Resources Wizard
  • general tab
    • Resource Assignment Percent Complete Dialog Box
    • General Tab of the Code File Properties Dialog Box
    • Progress Techniques
    • General Tab of the Application Preferences Dialog Box
    • General Tab of the Report Properties Dialog Box
    • Assign a Forecast Method to a Forecast Class
    • Select EVMS Acceptance for a Project
    • Resource-Loaded Schedule
    • General Tab of the Classes Tab
    • General Tab of the Resource File Properties Dialog Box
    • Progress Techniques
    • Assign a Calendar Set to a Forecast or Budget Class
    • General Tab of the Edit Batch Report Dialog Box
    • Assign a Budget Source to a Budget Class
    • General Tab of the Rate File Properties Dialog Box
    • General Tab of the Project View
    • General Tab of the Calendar File Properties Dialog Box
    • Set Reporting Options
    • General Tab of the Add Batch Report Dialog Box
    • Resource-Loaded Schedule
    • General Tab of the Project Properties Dialog Box
  • generate
  • generate calendar periods
  • generate periods
  • generate periods dialog box
  • generate rates
  • generate rates wizard
  • graphs
    • Spread Curves Tab of the Application Preferences Dialog Box
    • Analyze Preferences
    • Create Graph Reports from the Analyze Form
    • Analyze Options Dialog Box
    • Report Types
    • Save Graph Reports as Graphic Files
  • guidelines
  • IdeaBlade.ibconfig
    • Clear the Read-only Flag in the IdeaBlade.ibconfig File
    • Run Cobra Using a Different IdeaBlade.ibconfig File
  • IdeaBlade.ibconfig
  • import file
    • Multi-Project Concurrent Integration
    • Import File with Data from Multiple Projects
    • Import File Example
  • import file field mapper
  • inactivity
    • Set a Maximum Number of Login Tries
    • Set Maximum Time of Inactivity
    • Turn Windows Authentication On or Off
  • included costs page
  • included in budget
  • included reports tab
    • Included Reports Tab of the Add Batch Report Dialog Box
    • Included Reports Tab of the Edit Batch Report Dialog Box
  • information tab
  • integrate actual cost
    • Supported Processes, Operations, and Data
    • Integrate Actual Costs Process
    • Cobra Web Service
  • integration
    • Confirmation Page of the Integration Wizard
    • Export Cost Data
    • Resource Assignments Page of the Integration Wizard-Primavera
    • Configure Cobra to Support Additional User Fields
    • Class and Results Page of the Integration Wizard
    • Integration Configuration Page of the Integration Wizard
    • Field Mapper Page of the Integration Wizard
    • Multi-Project Concurrent Integration
    • Import File Preparation
    • Import File Validation
    • Using Spread
    • Integrate Actual Costs Process
    • Options for Importing from Microsoft Project
    • Integration Configuration Page of the Integration Wizard
    • Entering Actual Costs Using an Import File
    • Cost Data Wizard
    • Integration Wizard-Actual Costs
    • File Selection Page of the Integration Wizard
    • Data Import Using Files
    • Database Table Selection Page of the Integration Wizard
    • Cost Data Export
    • Integrate Project Data Process
    • Integration Wizard-Scheduling Tools and Files
    • Secure Baseline Dates
    • Access Control Page of the Integration Wizard
    • Import File with Data from Multiple Projects
    • Process Complete Page of the Integration Wizard
    • Entering Actual Costs Manually
    • Additional User Fields
    • Included Costs Page of the Integration Wizard
    • Options Page of the Integration Wizard
  • integration configuration page
    • Integration Configuration Page of the Integration Wizard
    • Integration Configuration Page of the Integration Wizard
    • Integration Configuration Page of the Integration Wizard
  • integration tab
    • Keyboard Shortcuts
    • Integration Tab
  • integration wizard
    • Confirmation Page of the Integration Wizard
    • Configuration Security
    • Import File Field Mapper Page of the Integration Wizard
    • Connection Selection Page of the Integration Wizard
    • Save and Load Page of the Integration Wizard
    • Data Access Tab of the Application Preferences Dialog Box
    • Filter Page of the Integration Wizard-Scheduling Tools
    • Progress Page of the Integration Wizard-Scheduling Tools
    • Preparing the Primavera Schedule
    • Integration Wizard-Ancillary Data
    • Date Selection Page of the Integration Wizard-MS Project
    • Action Selection Page of the Integration Wizard
    • Resource Assignments Page of the Integration Wizard-Open Plan
    • Resources and Rates Page of the Integration Wizard (New Project)
    • Access Control Page of the Integration Wizard
    • Class and Results Page of the Integration Wizard
    • Cumulative versus Current Period Costs
    • Process Running Page of the Integration Wizard
    • Actual Costs Preferences
    • Deletion Criteria Dialog Box of the Integration Wizard
    • Projects
    • Process Running Page of the Integration Wizard
    • Integration Configuration Page of the Integration Wizard
    • Progress Page of the Integration Wizard-Files
    • Integration Wizard
    • Status Page of the Integration Wizard-Scheduling Tools
    • Date Selection Page of the Integration Wizard-Open Plan
    • Change Control Page of the Integration Wizard
    • The Field Mapper
    • Results Page of the Integration Wizard
    • Field Mapper Page of the Integration Wizard
    • Resource Assignments Page of the Integration Wizard
    • Project Selection Page of the Integration Wizard-Files
    • Resources and Rates Page of the Integration Wizard
    • Status Page of the Integration Wizard-Files
    • Integration Tab of the Application Preferences Dialog Box
    • Schedule Mapping Page of the Integration Wizard-Primavera
    • Confirmation Page of the Integration Wizard
    • File Format for Importing Status Information
    • Integration Wizard-Apportionment Definition and Mapping Data
    • File Level Security
    • Configure Cobra to Work with Microsoft Project Server
    • Entering Actual Costs
    • Data Import-Ancillary Data
    • Process Complete Page of the Integration Wizard
    • Resource Assignments Page of the Integration Wizard-Files
    • Primavera Fields Imported
    • Resource-Loaded Schedule
    • Actual Cost Import File
    • Data Import-Budget Data
    • File Selection Page of the Integration Wizard
    • Integrate Ancillary Data Process
    • Filter Page of the Integration Wizard-Files
    • Notes Page of the Integration Wizard
    • Edit Connection Dialog Box of the Integration Wizard
    • Master Project Versus Individual Projects
    • Data Import from Open Plan
    • Codes Page of the Integration Wizard
    • Codes and the Integration Wizard
    • Process Complete Page of the Integration Wizard
    • Edit Connection Dialog Box of the Integration Wizard-Primavera
    • Data Import-Status Data
    • Integration Configuration Page of the Integration Wizard
    • Progress Page of the Integration Wizard
    • Process Running Page of the Integration Wizard
    • New Connection Dialog Box of the Integration Wizard-MS Project
    • Data Import Using Scheduling Tools and Files
    • Options for Importing from Microsoft Project
    • Integration Configuration Page of the Integration Wizard
    • Preparing the Open Plan Schedule
    • Date Selection Page of the Integration Wizard
    • Codes Page of the Integration Wizard-Primavera
    • Control Account Fields Versus Codes
    • Other Options Page of the Integration Wizard
    • Calendar Page of the Integration Wizard
    • Import Budget Data into Cobra
    • Ancillary File Field Mapper Page of the Integration Wizard
    • Resource Assignments Page of the Integration Wizard-MS Project
    • Customization of Integration Process
    • Cost Classes
    • Periods Page of the New Calendar File Wizard
    • Loading Actual Cost Records from a CSV File
    • Data Import from Primavera
    • Data Import-Apportionment Definition
    • Data Import Using Files
    • New Connection Dialog Box of the Integration Wizard-Primavera
    • Project Selection Page of the Integration Wizard
    • Edit Exported Data in Excel
    • Configuration Security Dialog Box
    • Data Import from Microsoft Project
    • Integration Wizard-Scheduling Tools and Files
    • Schedule Mapping Page of the Integration Wizard-Open Plan
    • Schedule Mapping Page of the Integration Wizard
    • New Connection Dialog Box of the Integration Wizard
    • Cobra 8.4 Help System
    • Save and Load Page of the Integration Wizard
    • Codes Page of the Integration Wizard-MS Project
    • Process Running Page of the Integration Wizard
    • Check Open Plan Baseline Resource Records
    • Status Page of the Integration Wizard
    • Access Control Page of the Integration Wizard
    • Import Status Data into Cobra
    • Edit Connection Dialog Box of the Integration Wizard-MS Project
    • Filter Page of the Integration Wizard
    • Process Complete Page of the Integration Wizard
    • Process Logs Dialog Box
    • Confirmation Page of the Integration Wizard
    • Resource-Loaded Schedule
    • Codes Page of the Integration Wizard-Open Plan
    • Data Formats
    • Customization of Processes
    • Schedule Mapping Page of the Integration Wizard-MS Project
    • Import File Example
    • Status File Field Mapper Page of the Integration Wizard
    • Confirmation Page of the Integration Wizard
    • Project Selection Page of the Integration Wizard-Scheduling Tools
    • Control Account Versus Work Package Level
    • Additional User Fields
    • Date Selection Page of the Integration Wizard-Primavera
    • Included Costs Page of the Integration Wizard
  • integration Wizard
    • Resource Assignments Page of the Integration Wizard-Primavera
    • Preparing Cobra for Schedule Integration
    • Integration Wizard Preferences
  • integration wizard
    • First Result and Derived Costs
    • File Selection Page of the Integration Wizard
    • Data Import-Apportionment Definition and Mapping Data
    • Data Import-Apportionment Mapping
    • Data Import-Actual Costs
    • File Format for Importing Apportionment Definition
  • integration wizard preferences
  • ipmdar
    • Export Cost Data
    • Exported Cost Data File
    • Procedures
    • Project and Format Page of the Cost Data Wizard
    • Data Options Page of the Cost Data Wizard
    • Contract Information Tab of the Project Properties Dialog Box
    • Cost Data Wizard
    • Cost Data Export
    • Save and Run Page of the Cost Data Wizard
  • ipmr cpr format 2
    • IPMR Format 2 Summary Page of the Report Wizard
    • Resources
    • IPMR Format 2 Summary Page of the wInsight Wizard
    • Resources
  • ipmr format 2
    • IPMR Format 2 Summary Page of the Report Wizard
    • Code the Resources for IPMR Format 2 Reports
    • Files Tab of the Project Properties Dialog Box
    • IPMR Format 2 Summary Page of the wInsight Wizard
  • ipmr format 2 summary page
    • IPMR Format 2 Summary Page of the Report Wizard
    • IPMR Format 2 Summary Page of the wInsight Wizard
  • keyboard shortcuts
    • Keyboard Shortcuts
    • Keyboard Shortcuts
    • Keyboard Shortcuts
    • Keyboard Shortcuts
    • Keyboard Shortcuts
    • Keyboard Shortcuts
  • launch
    • Set Cobra to Always Run as an Administrator
    • Launching Cobra
  • link structures page
  • log
    • Data Tool
    • Data Access Tab of the Application Preferences Dialog Box
    • Log Transaction Page of the Project Audit Wizard
    • ODBC DSN
    • Process Complete Page of the Rolling Wave Wizard
    • Project Selection Page of the Project Audit Wizard
    • Preparing the Primavera Schedule
    • Process Complete Page of the Replan Wizard
    • Errors Dialog Box of the Process Log Viewer
    • Process Logs
    • Resource Assignments Page of the Integration Wizard-Open Plan
    • Audit Reports
    • Audit Log Comparison Page of the Project Audit Wizard
    • Process Running Page of the Project Audit Wizard
    • Baseline Tags
    • Copy Preferences Dialog Box
    • Validity Check Process
    • Process Complete Page of the Export Calendar to Open Plan Wizard
    • Codes
    • Sub-Totals Page of the Report Wizard
    • Process Complete Page of the Update Open Plan Resources Wizard
    • Reporting
    • Actual Costs Preferences
    • Personal Reports Pane
    • Process Complete Page of the Calculate Forecast Wizard
    • Copy Project Preferences
    • New Filter Expression Dialog Box of the Report Wizard
    • Send a Message to Users
    • Project and Apportionment Validations Page of the Validity Check Wizard
    • Process Complete Page of the Project Audit Wizard
    • Change Control Page of the Integration Wizard
    • Edit Comment and Change Number Page of the Project Audit Wizard
    • Terminate a Session
    • Files Tab of the Project Properties Dialog Box
    • Process Complete Page of the ANSI EIA X12 Wizard
    • EPM Security Administrator Functions
    • Process Complete Page of the Apportionment Calculation Wizard
    • Report Categories
    • Integration Tab of the Application Preferences Dialog Box
    • Select the Level at Which to Capture Actual Costs
    • Prompt Level Page of the Project Audit Wizard
    • Ancillary File Validations Page of the Validity Check Wizard
    • Set a Maximum Number of Login Tries
    • Round off Audit Log Transactions
    • Process Complete Page of the Assignment Import/Assignment Export Wizard
    • Hook Program Methods
    • Import File Validation
    • Log SQL Statements in ClientDebugLog.xml
    • Audit Logging
    • MsgLogger Object Interface
    • Custom Cost Classes
    • Report Types
    • Process Complete Page of the Reclass Wizard
    • Update Transaction Changes
    • Log Operation Page of the Project Audit Wizard
    • Display a Login Message
    • Log Change Comment Dialog Box
    • Running the Process or Operation
    • Set Project Baseline Page of the Project Audit Wizard
    • Log Significant Changes for IPMR Format 3 Reports
    • Reconcile Log Process
    • Process Complete Page of the Advance Calendar Wizard
    • Integration Wizard Preferences
    • Configuration Security Dialog Box
    • Reconcile Project Logs Using the Project Audit Wizard
    • Set Maximum Time of Inactivity
    • Process Complete Page of the Validity Check Wizard
    • Process Log Viewer
    • New Sort Expression Dialog Box of the Report Wizard
    • Disable the Automatic Archiving of ClientDebugLog.xml Log File
    • Turn Windows Authentication On or Off
    • Codes
    • Process Complete Page of the Calculate Progress Wizard
    • Process Complete Page of the Top-Down Planning Wizard
    • Process Lock
    • Process Complete Page of the wInsight Wizard
    • Edit Sort Expression Dialog Box of the Report Wizard
    • Process Logs Dialog Box
    • Select the Level at Which to Capture Actual Costs
    • ServerDebugLog.xml Log File
    • Log SQL Statements in ServerDebugLog.xml
    • Log Comment Page of the Assignment Import/Assignment Export Wizard
    • Warnings Dialog Box of the Process Log Viewer
    • Add Resource Results Dialog Box
    • Process Complete Page of the Slip Wizard
    • Process Complete Page of the Report Wizard
    • Set Up Projects and Project Baselines
  • log change comment
  • log comment page
    • Log Comment Page of the Project Audit Wizard
    • Log Comment Page of the Assignment Import/Assignment Export Wizard
  • log file
    • Data Access Tab of the Application Preferences Dialog Box
    • ODBC DSN
    • ProcessLog.xml Log File
    • ClientDebugLog.xml Log File
    • ServerDebugLog.xml Log File
  • log in
    • Data Tool
    • Data Access Tab of the Application Preferences Dialog Box
    • Launching Cobra
    • Cobra to wInsight Data Export
    • Configuration Security Dialog Box
  • log memory
    • Log Memory Usage Details
    • Logging of Memory Usage Details
  • login message
  • login retries
    • Set a Maximum Number of Login Tries
    • Set Maximum Time of Inactivity
    • Turn Windows Authentication On or Off
  • logs
  • manage filters dialog box
  • manage sorts dialog box
  • manage view
  • master
  • master project
    • Merge Sub-Projects into a New Project
    • Remove Sub-Projects from a Master Project
    • Merge Sub-Projects into a New Project
    • Procedures
    • Remove Sub-Projects from a Master Project
    • Assign Sub-Projects to a Master Project
    • Merging a Master Project's Subprojects to Create a New Project
    • Multiproject Operations (Master and Subprojects)
    • Validate Sub-Projects
    • Validate Sub-Projects
    • Multiproject Guidelines
    • Assign Sub-Projects to a Master Project
    • Create a Master Project
  • microsoft project
    • Options for Importing from Microsoft Project
    • Data Import from Microsoft Project
    • Integration Wizard-Scheduling Tools and Files
    • Schedule Mapping Page of the Integration Wizard-MS Project
  • milestone
    • Milestones/Steps
    • Application Preferences
    • Code Files
    • Progress Page of the Integration Wizard-Scheduling Tools
    • Preparing the Primavera Schedule
    • Progress Techniques
    • Validity Check Process
    • Progress Page of the Integration Wizard-Files
    • Status Page of the Integration Wizard-Scheduling Tools
    • Change Control Page of the Integration Wizard
    • General Tab of the Application Preferences Dialog Box
    • Status Page of the Integration Wizard-Files
    • Integration Tab of the Application Preferences Dialog Box
    • Procedures
    • Schedule Mapping Page of the Integration Wizard-Primavera
    • How Cobra Calculates Progress to Determine Earned Value
    • Progress Techniques
    • Milestone Tags
    • Sample Earned Value Calculation
    • Preparing the Open Plan Schedule
    • Data Anomaly Validations Page of the Validity Check Wizard
    • Reconcile Milestone Weights
    • Integration Wizard Preferences
    • Schedule Mapping Page of the Integration Wizard-Open Plan
    • Status Page of the Integration Wizard
    • Milestones/Steps Tab of the Project View
    • Status File Field Mapper Page of the Integration Wizard
    • Set Up Projects and Project Baselines
    • Reconcile Milestone Weight Variance Dialog Box
  • milestones steps tab
    • Delete Milestones or Steps
    • Procedures
    • Add Milestones or Steps
    • Milestones/Steps Tab of the Project View
    • Modify Milestones or Steps
  • move control account dialog box
  • move work package dialog box
  • multiple
  • multiple sessions
  • multiproject operations
    • Merge Sub-Projects into a New Project
    • Remove Sub-Projects from a Master Project
    • Merge Sub-Projects into a New Project
    • Procedures
    • Remove Sub-Projects from a Master Project
    • Assign Sub-Projects to a Master Project
    • Merging a Master Project's Subprojects to Create a New Project
    • Multiproject Operations (Master and Subprojects)
    • Validate Sub-Projects
    • Validate Sub-Projects
    • Multiproject Guidelines
    • Assign Sub-Projects to a Master Project
    • Create a Master Project
  • multiprojects
    • Merge Sub-Projects into a New Project
    • Remove Sub-Projects from a Master Project
    • Merge Sub-Projects into a New Project
    • Procedures
    • Remove Sub-Projects from a Master Project
    • Assign Sub-Projects to a Master Project
    • Merging a Master Project's Subprojects to Create a New Project
    • Multiproject Operations (Master and Subprojects)
    • Validate Sub-Projects
    • Validate Sub-Projects
    • Multiproject Guidelines
    • Assign Sub-Projects to a Master Project
    • Create a Master Project
  • names
    • Considerations When Creating Names in Cobra
    • Considerations When Creating Names in Cobra
  • new calendar file wizard
    • Display the New Calendar File Wizard
    • Create a New Calendar
    • New Calendar File Wizard
    • Confirmation Page of the New Calendar File Wizard
    • Access Control Page of the New Calendar File Wizard
    • Productive Hours Page of the New Calendar File Wizard
    • Calendar Sets
  • new class wizard
    • Add a Second Earned Value Class to Your Project
    • Delete a Cost Set
    • Copy Classes Dialog Box
    • Display the New Class Wizard
    • Copy Cost Sets Dialog Box
    • Create a New Class
    • Confirmation Page of the New Class Wizard
    • Copy Existing Cost Sets to a Project
    • Create a New Cost Set
    • Procedures
    • New Class Wizard
    • Cost Sets Page of the Freeze Forecast Wizard
  • new class Wizard
    • Class Settings Page for Actuals Class of the New Class Wizard
    • Forecast Class Page of the New Class Wizard
    • Include in Actuals Cost Set Page of the New Class Wizard
    • General Information Page of the New Class Wizard
    • Class Settings Page for Budget Class of the New Class Wizard
    • Class Settings Page for Forecast Class of the New Class Wizard
    • Class Settings Page for Earned Class of the New Class Wizard
    • Include in Earned Cost Set Page of the New Class Wizard
    • Include in EAC Cost Set Page of the New Class Wizard
    • Include in Budget Cost Set Page of the New Class Wizard
  • new code file wizard
    • Thresholds Tab of the Code File Properties Dialog Box
    • Structure Tab of the Code File Properties Dialog Box
    • Thresholds Page of the New Code File Wizard
    • Access Control Tab of the Code File Properties Dialog Box
    • Code Fields Page of the New Code File Wizard
    • General Information Page of the New Code File Wizard
    • New Code File Wizard
    • Access Control Page of the New Code File Wizard
    • Procedures
    • Enable a User to Access a Code File
    • Create a New Code File
    • Display the New Code File Wizard
    • Code File Structure Page of the New Code File Wizard
    • Code File Structures
    • Confirmation Page of the New Code File Wizard
  • new connection dialog box
    • Preparing the Primavera Schedule
    • New Connection Dialog Box of the Integration Wizard-MS Project
    • New Connection Dialog Box of the Integration Wizard-Primavera
    • New Connection Dialog Box of the Integration Wizard
    • New Connection Dialog Box of the wInsight Wizard
  • new file dialog box
    • Display the New Calendar File Wizard
    • Display the New File Dialog Box
    • Display the New File Dialog Box
  • new project wizard
    • Code Assignments Tab of the Project Properties Dialog Box
    • Confirmation Page of the New Project Wizard
    • Rename Work Package Dialog Box
    • Procedures
    • Add Work Package Dialog Box
    • Settings Page of the New Project Wizard
    • Copy Work Package Dialog Box
    • Spreadsheet Pane of the Project View
    • General Information Page of the New Project Wizard
    • Projects
    • General Tab of the Application Preferences Dialog Box
    • Files Tab of the Project Properties Dialog Box
    • Add Control Account Dialog Box
    • Rename Control Account Dialog Box
    • Select the Level at Which to Capture Actual Costs
    • Project Dates Page of the New Project Wizard
    • Project Code Assignments Page of the New Project Wizard
    • Display the New Project Wizard
    • Move Work Package Dialog Box
    • Access Control Page of the New Project Wizard
    • Move Control Account Dialog Box
    • Create a New Project
    • Sub-Projects Page of the New Project Wizard
    • Access Control Tab of the Project Properties Dialog Box
    • Select the Level at Which to Capture Actual Costs
    • Options Page of the Advance Calendar Wizard
    • Ancillary Files Page of the New Project Wizard
    • New Project Wizard
    • Fields Page of the New Project Wizard
  • new project Wizard
  • new rate file wizard
    • Access Control Page of the New Rate File Wizard
    • Code Fields Page of the New Rate File Wizard
    • Procedures
    • General Information Page of the New Rate File Wizard
    • Confirmation Page of the New Rate File Wizard
    • Display the New Rate File Wizard
    • Create a New Rate File
  • new resource file wizard
    • Enable a User to Access a Resource File
    • Confirmation Page of the New Resource File Wizard
    • Procedures
    • Create a New Resource File
    • Resource File Security
    • Access Control Tab of the Resource File Properties Dialog Box
    • Display the New Resource File Wizard
    • General Tab of the Resource File Properties Dialog Box
    • Code Fields Page of the New Resource File Wizard
    • Structure Tab of the Resource File Properties Dialog Box
    • Thresholds Page of the New Resource File Wizard
    • Resource Results Page of the New Resource File Wizard
    • General Information Page of the New Resource File Wizard
    • Resource File Structure Page of the New Resource File Wizard
    • Default Rates Page of the New Resource File Wizard
    • Access Control Page of the New Resource File Wizard
  • not included in budget
  • notes
  • notes page
  • notes tab
    • Add a Note to a Code
    • Notes Tab of the Resource View
    • Notes Tab of the Code View
    • Notes Tab of the Project View
  • odbc
  • odc
    • Integration Tab of the Application Preferences Dialog Box
    • Cost Data Export
  • op wizard
    • Process Running Page of the Export Calendar to Open Plan Wizard
    • Process Running Page of the Export Calendar to Open Plan Wizard
    • Confirmation Page of the Export Calendar to Open Plan Wizard
  • open plan
    • Data Import from Open Plan
    • Integration Wizard-Scheduling Tools and Files
    • Check Open Plan Baseline Resource Records
  • operations
    • Data Access Tab of the Application Preferences Dialog Box
    • Log Transaction Page of the Project Audit Wizard
    • Use a Code File in Multiple Projects
    • Calculated Results
    • Edit Comment and Change Number Page of the Project Audit Wizard
    • Special-Purpose Operations
    • EPM Security Administrator Functions
    • Apportionment Setup Steps
    • Organize Project Information
    • Process Cycle
    • Multiproject Operations (Master and Subprojects)
    • Custom Project Tables
    • Results Tab of the Resource File Properties Dialog Box
    • Log Operation Page of the Project Audit Wizard
    • Running the Process or Operation
    • Creating Service Operations Classes
    • Recalc
    • Run the Rolling Wave Process
    • Process Logs Dialog Box
    • Set Up Projects and Project Baselines
  • options page
    • Options Page of the Respread Wizard
    • Analyze Preferences
    • Actual Costs Preferences
    • Replan Preferences
    • Options Page of the Calculate Progress Wizard
    • Options Page of the Rolling Wave Wizard
    • Recalc Preferences
    • Options Page of the Recalc Wizard
    • Reclass Preferences
    • Integration Wizard Preferences
    • Options Page of the Zero-Out Data Wizard
    • Options Page of the Replan Wizard
    • Options Page of the Reclass Wizard
    • Earned Preferences
    • Options Page of the Calculate Forecast Wizard
    • Options Page of the Advance Calendar Wizard
    • Options Page of the ANSI EIA X12 Wizard
    • Options Page of the Integration Wizard
  • oracle
    • Troubleshoot Oracle Error ORA-600 [kkqcscpcky:ficand] While Running Query with Parameter "_replace_virtual_columns=false"
    • Update the "_replace_virtual_columns" Setting
  • order
  • order resource results dialog box
  • other direct costs
    • Integration Tab of the Application Preferences Dialog Box
    • Cost Data Export
  • other functions
    • Set a Maximum Number of Login Tries
    • Set Maximum Time of Inactivity
    • Turn Windows Authentication On or Off
  • other options
    • Change Control Page of the Integration Wizard
    • Running the Process or Operation
  • overview
  • owner
    • Change Owner Dialog Box
    • Display the Change Ownership and Access Rights Dialog Box
    • Display the Change Owner Dialog Box
    • Procedures
    • Change Ownership and Access Rights
    • Change Ownership and Access Rights Dialog Box
    • Display the Change Ownership and Access Rights Dialog Box
    • Change Ownership and Access Rights Dialog Box
    • Change the Owner of an Object
    • Change Access Rights Dialog Box
    • Change the Access Rights of an Object
  • owner delegate
  • password
    • Create Windows Shortcut for the API Script
    • Preparing the Primavera Schedule
    • Change Password Dialog Box
    • Change Password Dialog Box
    • Connecting to the Cobra Web Service Host
    • Edit Connection Dialog Box of the Integration Wizard-Primavera
    • New Connection Dialog Box of the Integration Wizard-MS Project
    • New Connection Dialog Box of the Integration Wizard-Primavera
    • Change Your Password
    • Edit Connection Dialog Box of the Integration Wizard-MS Project
  • paste
  • pending dates
  • personal reports pane
  • preferences
    • Forecast Preferences
    • ANSI EIA X12 Preferences
    • Analyze Preferences
    • Copy Preferences Dialog Box
    • Project Preferences
    • Copy Project Preferences
    • Replan Preferences
    • Display the Project Properties Dialog Box Tabs from an Open Project File
    • Display the Project Properties Dialog Box Tabs without Opening a Project File
    • Preferences Tab of the Project Properties Dialog Box
    • Recalc Preferences
    • Open Status Tab of the Project Properties Dialog Box
    • Reclass Preferences
    • Integration Wizard Preferences
    • Advance Calendar Preferences
    • Earned Preferences
    • Access Control Tab of the Project Properties Dialog Box
    • Procedures
  • preferences tab
    • Forecast Preferences
    • ANSI EIA X12 Preferences
    • Analyze Preferences
    • Copy Preferences Dialog Box
    • Project Preferences
    • Progress Techniques
    • Actual Costs Preferences
    • Copy Project Preferences
    • Replan Preferences
    • Display the Project Properties Dialog Box Tabs from an Open Project File
    • Display the Project Properties Dialog Box Tabs without Opening a Project File
    • Preferences Tab of the Project Properties Dialog Box
    • Recalc Preferences
    • Set Up a Retain EAC Forecast with the Scale EAC Option
    • Progress Techniques
    • Open Status Tab of the Project Properties Dialog Box
    • Reclass Preferences
    • Integration Wizard Preferences
    • Advance Calendar Preferences
    • Earned Preferences
    • Access Control Tab of the Project Properties Dialog Box
    • Procedures
    • Options Page of the Advance Calendar Wizard
  • primavera
    • Primavera Fields Imported
    • Data Import from Primavera
    • Integration Wizard-Scheduling Tools and Files
  • process complete
    • Process Complete Page of the Align Time-phased Dates Wizard
    • Process Complete Page of the Cost Data Wizard
    • Process Complete Page of the Update Totals Wizard
    • Process Complete Page of the Integration Wizard
  • process complete page
    • Process Complete Page of the Rolling Wave Wizard
    • Process Complete Page of the Replan Wizard
    • Errors Dialog Box of the Process Log Viewer
    • Process Complete Page of the Export Calendar to Open Plan Wizard
    • Process Complete Page of the Update Open Plan Resources Wizard
    • Process Complete Page of the Calculate Forecast Wizard
    • Process Complete Page of the Project Audit Wizard
    • Process Complete Page of the ANSI EIA X12 Wizard
    • Process Complete Page of the Apportionment Calculation Wizard
    • Process Complete Page of the Integration Wizard
    • Process Complete Page of the Assignment Import/Assignment Export Wizard
    • Process Complete Page of the Freeze Forecast Wizard
    • Process Complete Page of the Integration Wizard
    • Process Complete Page of the Reclass Wizard
    • Process Complete Page of the Respread Wizard
    • Process Complete Page of the Zero-Out Data Wizard
    • Process Complete Page of the Advance Calendar Wizard
    • Process Complete Page of the Recalc Wizard
    • Process Complete Page of the Validity Check Wizard
    • Process Log Viewer
    • Process Complete Page of the Integration Wizard
    • Process Complete Page of the Calculate Progress Wizard
    • Process Complete Page of the Top-Down Planning Wizard
    • Process Complete Page of the Replace Resources Wizard
    • Process Complete Page of the wInsight Wizard
    • Warnings Dialog Box of the Process Log Viewer
    • Process Complete Page of the Update Codes Wizard
    • Process Complete Page of the Slip Wizard
    • Process Complete Page of the Report Wizard
  • process log
  • process log viewer
    • Errors Dialog Box of the Process Log Viewer
    • Process Log Viewer
    • Process Logs Dialog Box
    • Warnings Dialog Box of the Process Log Viewer
  • process running
  • process running page
    • Process Running Page of the Apportionment Calculation Wizard
    • Process Running Page of the Reclass Wizard
    • Process Running Page of the Respread Wizard
    • Process Running Page of the wInsight Wizard
    • Process Running Page of the Top-Down Planning Wizard
    • Process Running Page of the Project Audit Wizard
    • Process Running Page of the Advance Calendar Wizard
    • Process Running Page of the Calculate Forecast Wizard
    • Process Running Page of the Replan Wizard
    • Process Running Page of the Rolling Wave Wizard
    • Process Running Page of the Integration Wizard
    • Process Running Page of the Export Calendar to Open Plan Wizard
    • Process Running Page of the Integration Wizard
    • Process Running Page of the Validity Check Wizard
    • Process Running Page of the Align Time-phased Dates Wizard
    • Process Running Page of the Update Codes Wizard
    • Process Running Page of the Slip Wizard
    • Process Running Page of the Calculate Progress Wizard
    • Process Running Page of the Export Calendar to Open Plan Wizard
    • Process Running Page of the Integration Wizard
    • Process Running Page of the ANSI EIA X12 Wizard
    • Process Running Page of the Replace Resources Wizard
    • Process Running Page of the Freeze Forecast Wizard
    • Process Running Page of the Update Totals Wizard
    • Process Running Page of the Integration Wizard
    • Process Running Page of the Recalc Wizard
    • Process Running Page of the Cost Data Wizard
    • Process Running Page of the Zero-Out Data Wizard
  • process section
    • Process Log Viewer
    • API Script to Create a New Project from a Project Template
  • processes
    • Application Processes
    • Project Processes
  • processes tab
    • Processes Tab
    • Keyboard Shortcuts
  • progress
    • Add a Second Earned Value Class to Your Project
    • Select the Earned Value Method
    • Calculate Progress Process
    • Assign a Progress Technique to a Work Package
    • Progress Page of the Integration Wizard-Scheduling Tools
    • Add Work Package Dialog Box
    • Audit Reports
    • Method Page of the Replan Wizard
    • Turn On the Opening % Feature When Integrating with Open Plan
    • Progress Techniques
    • Calculate Progress
    • Progress Page of the Integration Wizard-Files
    • General Tab of the Application Preferences Dialog Box
    • Options Page of the Calculate Progress Wizard
    • Apportionment Setup Steps
    • Calculate Progress
    • How Cobra Calculates Progress to Determine Earned Value
    • Progress Techniques
    • Preparing the Open Plan Schedule
    • Guidelines for Accurate Earned Value Management
    • Possible Sources of Errors
    • Process Complete Page of the Calculate Progress Wizard
    • Status File Field Mapper Page of the Integration Wizard
  • progress technique
    • Milestones/Steps
    • Calculate Progress using the Calculated Apportionment Progress Technique
    • Progress Techniques
    • Calculate Progress
    • Progress Techniques
    • Sample Earned Value Calculation
    • Planning Reports
    • Earned Preferences
    • Advance Calendar Process
    • Milestones/Steps Tab of the Project View
  • project
    • Performance Data Page of the wInsight Wizard
    • Code Assignments Tab of the Project Properties Dialog Box
    • Resource Assignments Page of the Assignment Import/Assignment Export Wizard
    • Milestones/Steps
    • Import File Field Mapper Page of the Integration Wizard
    • Class Settings Page for Actuals Class of the New Class Wizard
    • Confirmation Page of the New Project Wizard
    • Rename Work Package Dialog Box
    • Application Preferences
    • Criteria Page of the Slip Wizard
    • Insert Column Dialog Box
    • Process Running Page of the Apportionment Calculation Wizard
    • Process Running Page of the Reclass Wizard
    • Add a Second Earned Value Class to Your Project
    • Data Access Tab of the Application Preferences Dialog Box
    • IPMR Format 2 Summary Page of the Report Wizard
    • Code Files
    • Resource Assignment Percent Complete Dialog Box
    • Log Transaction Page of the Project Audit Wizard
    • Access Control Tab of the Calendar File Properties Dialog Box
    • SQL Command Utility
    • ANSI Standard for Earned Value Management Systems
    • Associate a Budget Class with a Forecast Actual or Earned Class
    • Filter Page of the Integration Wizard-Scheduling Tools
    • Color Band
    • Progress Page of the Integration Wizard-Scheduling Tools
    • Rename Dialog Box
    • Add Work Package Dialog Box
    • Process Complete Page of the Rolling Wave Wizard
    • Project Selection Page of the Project Audit Wizard
    • Analyze Preferences
    • Preparing the Primavera Schedule
    • Report Template Format
    • Delete a Cost Set
    • Process Complete Page of the Replan Wizard
    • Work Package Name Page of the Replan Wizard
    • Rename a Work Package
    • Initialize Forecast Process
    • Settings Page of the New Project Wizard
    • Date Selection Page of the Integration Wizard-MS Project
    • Project Selection Page of the Advance Calendar Wizard
    • Action Selection Page of the Integration Wizard
    • Confirmation Page of the Calculate Progress Wizard
    • Resource Assignments Page of the Integration Wizard-Open Plan
    • Copy Work Package Dialog Box
    • Copy Project Codes Dialog Box
    • Examples of Manual Forecast Calculations
    • Delete Project Process
    • Spreadsheet Pane of the Project View
    • Restore Process
    • Audit Reports
    • Audit Log Comparison Page of the Project Audit Wizard
    • Process Running Page of the Project Audit Wizard
    • Baseline Tags
    • Perform Apportionment Mapping
    • Explanation of Variance Narrative Tags
    • Copy Preferences Dialog Box
    • Process Running Page of the Advance Calendar Wizard
    • New Filter Dialog Box of the Report Wizard
    • Thresholds Tab of the Code File Properties Dialog Box
    • Process Running Page of the Calculate Forecast Wizard
    • Report Criterion Parameters
    • File Format for Importing Apportionment Mapping
    • Get Cobra Spread Process
    • Confirmation Page of the Report Wizard
    • Copy Control Account Dialog Box
    • Process Running Page of the Replan Wizard
    • Method Page of the Replan Wizard
    • Progress Techniques
    • Use a Code File in Multiple Projects
    • Advance to Period Page of the Advance Calendar Wizard
    • Save the Contents of the Spreadsheet Pane as an Excel File
    • Display the Project Properties Dialog Box from an Open Project
    • Validity Check Process
    • Analyze Options Dialog Box
    • Rename an Ancillary File
    • Spread Budgets Using Pre-defined Spread Methods
    • Project Codes Tab of the Application Preferences Dialog Box
    • Codes
    • Sub-Totals Page of the Report Wizard
    • Thresholds Tab of the Code View
    • Class and Results Page of the Integration Wizard
    • Variance Thresholds
    • Project Selection Page of the Respread Wizard
    • Merge Sub-Projects into a New Project
    • Reporting
    • General Information Page of the New Project Wizard
    • Thresholds Page of the New Code File Wizard
    • Back Up Your Data
    • Actual Costs Preferences
    • Deletion Criteria Dialog Box of the Integration Wizard
    • Projects
    • Remove Sub-Projects from a Master Project
    • Process Complete Page of the Calculate Forecast Wizard
    • Export and Import Time-Phased Resource Assignments
    • Copy Project Preferences
    • New Filter Expression Dialog Box of the Report Wizard
    • Replan Preferences
    • Project and Apportionment Validations Page of the Validity Check Wizard
    • Integration Configuration Page of the Integration Wizard
    • Integration Wizard
    • Access Control Tab of the Resource File Properties Dialog Box
    • Access Control Tab of the Code File Properties Dialog Box
    • Status Page of the Integration Wizard-Scheduling Tools
    • Date Selection Page of the Integration Wizard-Open Plan
    • Process Complete Page of the Project Audit Wizard
    • Change Control Page of the Integration Wizard
    • Edit Comment and Change Number Page of the Project Audit Wizard
    • Cost Set Information Tags
    • General Tab of the Application Preferences Dialog Box
    • Export Structures Page of the wInsight Wizard
    • Included Actual Classes Tab of the Classes Tab
    • The Field Mapper
    • Assign Control Account and Work Package Structures to a Project
    • Files Tab of the Project Properties Dialog Box
    • Statistical Forecasts
    • Results Page of the Integration Wizard
    • Field Mapper Page of the Integration Wizard
    • Sub-Projects Validation Dialog Box
    • Merge Sub-Projects into a New Project
    • Include in Actuals Cost Set Page of the New Class Wizard
    • Add a New Work Package using the Dialog Box
    • EPM Security Administrator Functions
    • Process Complete Page of the Apportionment Calculation Wizard
    • Add Control Account Dialog Box
    • Preferences Tab of the Project Properties Dialog Box
    • Confirmation Page of the Reclass Wizard
    • Resources and Rates Page of the Integration Wizard
    • Project Selection Page of the Calculate Forecast Wizard
    • Rename Control Account Dialog Box
    • Project Selection Page of the Update Totals Wizard
    • Status Page of the Integration Wizard-Files
    • Report Categories
    • Recalc Preferences
    • Integration Tab of the Application Preferences Dialog Box
    • Manual Performance Factors Page of the Calculate Forecast Wizard
    • Supported Processes, Operations, and Data
    • Save As Dialog Box (Merging Projects)
    • Update EAC Dialog Box
    • Select the Level at Which to Capture Actual Costs
    • Procedures
    • Schedule Mapping Page of the Integration Wizard-Primavera
    • Prompt Level Page of the Project Audit Wizard
    • Ancillary File Validations Page of the Validity Check Wizard
    • Apportionment Dialog Box
    • Remove Sub-Projects from a Master Project
    • Assign a Forecast Method to a Forecast Class
    • General Information Page of the New Code File Wizard
    • Select EVMS Acceptance for a Project
    • Spreadsheet Pane Column Definitions
    • Save a Project as a Different Project
    • Results Page of the Report Wizard
    • Configure Cobra to Work with Microsoft Project Server
    • Project Dates Page of the New Project Wizard
    • Resources
    • General Information Page of the New Class Wizard
    • Process Running Page of the Validity Check Wizard
    • Examples of Forecast Calculations
    • Project Code Assignments Page of the New Project Wizard
    • Open Dialog Box of the Calculated Results Wizard
    • Apportionment Setup Steps
    • Miscellaneous Page of the wInsight Wizard
    • Backup Project Process
    • Resource Assignments Page of the Integration Wizard-Files
    • Display the New Project Wizard
    • Resource-Loaded Schedule
    • Calendars
    • Cost Sets Page of the Report Wizard
    • Variance Thresholds
    • Required Template Files
    • Organize Project Information
    • Manage Sorts Dialog Box of the Report Wizard
    • Process Complete Page of the Assignment Import/Assignment Export Wizard
    • Hook Program Methods
    • Calculate Progress
    • Associate an Earned Value Class with a Forecast Class
    • Copy a Work Package
    • General Tab of the Classes Tab
    • Add a Resource Assignment
    • Import File Validation
    • Classes Tab of the Project Properties Dialog Box
    • Other Tab of the Application Preferences Dialog Box
    • Import Location Page of the Assignment Import Wizard
    • Integrate Ancillary Data Process
    • Filter Page of the Integration Wizard-Files
    • Project Selection Page of the Reclass Wizard
    • Process Running Page of the Slip Wizard
    • Access Control Page of the New Code File Wizard
    • Process Running Page of the Calculate Progress Wizard
    • File Selection Page of the Integration Wizard
    • Set Up a Retain EAC Forecast with the Scale EAC Option
    • Process Cycle
    • Project Processes
    • Project Selection Page of the Freeze Forecast Wizard
    • Master Project Versus Individual Projects
    • Create Project from Template Process
    • Progress Techniques
    • Custom Cost Classes
    • Assign a Calendar Set to a Forecast or Budget Class
    • Confirmation Page of the New Class Wizard
    • Multiproject Operations (Master and Subprojects)
    • Validations Page of the Validity Check Wizard
    • Open File Dialog Box
    • Apportionment Process
    • Replan Process
    • Access Control Page of the Report Wizard
    • Codes and the Integration Wizard
    • Open File Dialog Box
    • Class Information Tags
    • Milestone Tags
    • Run the Rolling Wave Process Without Advancing the Calendar
    • Report Types
    • Add Results to a Resource
    • How Cobra Spreads ETC
    • Target Class Page of the Reclass Wizard
    • User Preferences Dialog Box
    • Integration Configuration Page of the Integration Wizard
    • New Connection Dialog Box of the Integration Wizard-MS Project
    • Copy Existing Cost Sets to a Project
    • Process Complete Page of the Reclass Wizard
    • Data Import Using Scheduling Tools and Files
    • Code View
    • XML Configuration File
    • Custom Project Tables
    • Move a Control Account
    • Integration Configuration Page of the Integration Wizard
    • Advance Calendar
    • Preparing the Open Plan Schedule
    • Guidelines for Accurate Earned Value Management
    • Preparing Cobra for Schedule Integration
    • Thresholds Page of the New Resource File Wizard
    • Rename a Control Account
    • Control Account Fields Versus Codes
    • Results Tab of the Resource File Properties Dialog Box
    • Move Work Package Dialog Box
    • Class Settings Page for Earned Class of the New Class Wizard
    • Display the Project Properties Dialog Box without Opening the Project
    • New Sort Dialog Box of the Report Wizard
    • Update Transaction Changes
    • Include in EAC Cost Set Page of the New Class Wizard
    • Forecast Calculations
    • Template Resource Files
    • Calendar Page of the Integration Wizard
    • Access Control Tab of the Edit Batch Report Dialog Box
    • Purge Dialog Box
    • Import Budget Data into Cobra
    • Included Earned Classes Tab of the Classes Tab
    • Log Operation Page of the Project Audit Wizard
    • Customization of Integration Process
    • Contract Information Tab of the Project Properties Dialog Box
    • Log Change Comment Dialog Box
    • Running the Process or Operation
    • Copy Calculated Result Dialog Box of the Calculated Results Wizard
    • Process Running Page of the Freeze Forecast Wizard
    • Reclass Preferences
    • Creating Service Operations Classes
    • Data Anomaly Validations Page of the Validity Check Wizard
    • Add a New Control Account using the Dialog Box
    • Set Project Baseline Page of the Project Audit Wizard
    • Adjust Budget Spreads Manually
    • Confirmation Page of the Advance Calendar Wizard
    • Log Significant Changes for IPMR Format 3 Reports
    • Reconcile Milestone Weights
    • New Connection Dialog Box of the Integration Wizard-Primavera
    • Access Control Page of the New Project Wizard
    • Save As Dialog Box (Projects)
    • Process Complete Page of the Advance Calendar Wizard
    • Integration Wizard Preferences
    • Assign a Budget Source to a Budget Class
    • Criteria Selection Page of the Recalc Wizard
    • Move Control Account Dialog Box
    • Configuration Security Dialog Box
    • Copy Project Process
    • Element of Cost Page of the wInsight Wizard
    • Reconcile Project Logs Using the Project Audit Wizard
    • Additional Project Files
    • Recalc
    • Edit Column Dialog Box
    • Schedule Mapping Page of the Integration Wizard-Open Plan
    • Copy Codes to Another Project
    • IPMR Format 2 Summary Page of the wInsight Wizard
    • New File Dialog Box
    • Options Page of the Replan Wizard
    • Spread Curve Dialog Box
    • Cobra 8.4 Help System
    • Enter Contract Information
    • Data Import-Actual Costs
    • Shortcut Menu
    • Freeze a Forecast
    • Resources Pane
    • Planning Reports
    • Examples of Statistical Forecast Calculations
    • Perform Project Analysis
    • Sub-Projects Page of the New Project Wizard
    • Process Complete Page of the Recalc Wizard
    • Codes Page of the Integration Wizard-MS Project
    • Confirmation Page of the Replace Resources Wizard
    • Project Selection Page of the Calculate Progress Wizard
    • Validate Code Assignments — Solve Roll-Up Issues
    • Thresholds Tab of the Resource View
    • Process Complete Page of the Validity Check Wizard
    • Earned Preferences
    • Run the Rolling Wave Process Without Advancing the Calendar
    • Process Log Viewer
    • New Sort Expression Dialog Box of the Report Wizard
    • Project Selection Page of the Assignment Import/Assignment Export Wizard
    • Status Page of the Integration Wizard
    • Confirmation Page of the Respread Wizard
    • Access Control Tab of the Project Properties Dialog Box
    • Save As Dialog Box (Projects)
    • Resource Selection Page of the Replace Resources Wizard
    • Resources
    • Slip a Project
    • Style Page of the Report Wizard
    • Set Reporting Options
    • Criteria Page of the Reclass Wizard
    • Project Selection Page of the Top-Down Planning Wizard
    • Edit Connection Dialog Box of the Integration Wizard-MS Project
    • Advance Calendar Process
    • Codes
    • Filter Page of the Integration Wizard
    • Control Account and Work Package Note Tags
    • Cobra Web Service
    • New File Dialog Box
    • Process Complete Page of the Calculate Progress Wizard
    • Default Rates Page of the New Resource File Wizard
    • Process Complete Page of the Top-Down Planning Wizard
    • Process Lock
    • Milestones/Steps Tab of the Project View
    • Options Page of the Calculate Forecast Wizard
    • Cost Sets Tab of the Project Properties Dialog Box
    • Edit Sort Expression Dialog Box of the Report Wizard
    • Select Files to Restore Dialog Box
    • Run the Rolling Wave Process
    • Confirmation Page of the Apportionment Calculation Wizard
    • Process Logs Dialog Box
    • Classes Page of the Respread Wizard
    • Update Totals Process
    • Select the Level at Which to Capture Actual Costs
    • Enter Budget Information
    • Include in Budget Cost Set Page of the New Class Wizard
    • Resource-Loaded Schedule
    • Manage Filters Dialog Box of the Report Wizard
    • Calendar View
    • Advance the Calendar
    • Confirmation Page of the Validity Check Wizard
    • Confirmation Page of the Freeze Forecast Wizard
    • Included Budget Classes Tab of the Classes Tab
    • Log Comment Page of the Assignment Import/Assignment Export Wizard
    • Cost Sets Page of the Freeze Forecast Wizard
    • Results Pane of the Analyze Form
    • SQL Language Extended Support
    • Notes Tab of the Project View
    • Data Formats
    • Date Range Page of the Recalc Wizard
    • Calendar Sets
    • API Script to Create a New Project from a Project Template
    • Resource Components
    • Customization of Processes
    • Rename a Project
    • Options Page of the Advance Calendar Wizard
    • Column Reports
    • Shortcut Menu
    • Add Resource Results Dialog Box
    • Ancillary Files Page of the New Project Wizard
    • Process Complete Page of the Slip Wizard
    • Time-phased Reports
    • Status File Field Mapper Page of the Integration Wizard
    • Process Complete Page of the Report Wizard
    • Application Settings
    • Results or Field Names
    • Control Account Versus Work Package Level
    • Access Control Page of the New Resource File Wizard
    • Date Selection Page of the Integration Wizard-Primavera
    • Options Page of the ANSI EIA X12 Wizard
    • Manual Forecasts
    • Copy Budget to a Manual Forecast Using the Reclass Wizard
    • Set Up Projects and Project Baselines
    • Reclass a Class
    • Reconcile Milestone Weight Variance Dialog Box
    • Fields Page of the New Project Wizard
  • project analysis
    • Create Graph Reports from the Analyze Form
    • Edit Chart Data
    • Analyze Options Dialog Box
    • Customize Graphs Using the Chart Designer
    • Save Graph Reports as XML Files
    • Graph Reports
    • Save Template Dialog Box
    • Procedures
    • Analyze
    • Security Options for the Analyze Process
    • Locate Custom Application Dialog Box
    • Procedures
    • Customize Graphs
    • Narrative Text Pane of the Analyze Form
    • Analyze Project Dialog Box
    • Select a Chart Type
    • Get Narrative Dialog Box
    • Save Graph Reports as Graphic Files
    • Copy Narrative Information
    • Print Analyze Graph Reports
    • Perform Project Analysis
    • Set Up Chart Details
    • Analyze Form
    • Results Pane of the Analyze Form
  • project and apportionment validation page
  • project audit
    • Log Transaction Page of the Project Audit Wizard
    • Project Selection Page of the Project Audit Wizard
    • Audit Reports
    • Audit Log Comparison Page of the Project Audit Wizard
    • Process Running Page of the Project Audit Wizard
    • Validity Check Process
    • Sub-Totals Page of the Report Wizard
    • Project Audit Wizard
    • Project and Apportionment Validations Page of the Validity Check Wizard
    • Process Complete Page of the Project Audit Wizard
    • Edit Comment and Change Number Page of the Project Audit Wizard
    • Files Tab of the Project Properties Dialog Box
    • Turn Project Audit On or Off
    • Edit the Project Audit Log
    • Prompt Level Page of the Project Audit Wizard
    • Reset the Baseline Using the Project Audit Wizard
    • Report Types
    • Log Comment Page of the Project Audit Wizard
    • Results Tab of the Resource File Properties Dialog Box
    • Update Transaction Changes
    • Log Operation Page of the Project Audit Wizard
    • Set Project Baseline Page of the Project Audit Wizard
    • Log Significant Changes for IPMR Format 3 Reports
    • Reconcile Project Logs Using the Project Audit Wizard
    • Project Audit Logging
    • Confirmation Page of the Project Audit Wizard
    • Process Lock
    • Process Logs Dialog Box
    • Procedures
    • Add Resource Results Dialog Box
  • project audit wizard
    • Log Transaction Page of the Project Audit Wizard
    • Project Selection Page of the Project Audit Wizard
    • Audit Log Comparison Page of the Project Audit Wizard
    • Process Running Page of the Project Audit Wizard
    • Project Audit Wizard
    • Process Complete Page of the Project Audit Wizard
    • Edit Comment and Change Number Page of the Project Audit Wizard
    • Turn Project Audit On or Off
    • Edit the Project Audit Log
    • Prompt Level Page of the Project Audit Wizard
    • Reset the Baseline Using the Project Audit Wizard
    • Log Comment Page of the Project Audit Wizard
    • Update Transaction Changes
    • Log Operation Page of the Project Audit Wizard
    • Set Project Baseline Page of the Project Audit Wizard
    • Log Significant Changes for IPMR Format 3 Reports
    • Reconcile Project Logs Using the Project Audit Wizard
    • Project Audit Logging
    • Confirmation Page of the Project Audit Wizard
    • Process Lock
    • Procedures
  • project code assignments page
  • project dates page
  • project edit tab
  • project information
    • Code Files
    • IPMR Format 2 Summary Page of the wInsight Wizard
  • project officer codes page
    • Project Officer Codes Page of the ANSI EIA X12 Wizard
    • Project Officer Codes Page of the wInsight Wizard
  • project operations
    • Use a Code File in Multiple Projects
    • Multiproject Operations (Master and Subprojects)
  • project page
    • Project and Format Page of the Cost Data Wizard
    • Project Page of the wInsight Wizard
  • project plan
    • ANSI Standard for Earned Value Management Systems
    • Audit Reports
    • Report Types
  • project planning
  • project properties
    • Code Assignments Tab of the Project Properties Dialog Box
    • Class Settings Page for Actuals Class of the New Class Wizard
    • IPMR Format 2 Summary Page of the Report Wizard
    • Forecast Class Page of the New Class Wizard
    • Associate a Budget Class with a Forecast Actual or Earned Class
    • ANSI EIA X12 Preferences
    • Analyze Preferences
    • Delete a Cost Set
    • Copy Project Codes Dialog Box
    • Spreadsheet Pane of the Project View
    • Audit Reports
    • Copy Preferences Dialog Box
    • Procedures
    • Project Preferences
    • Progress Techniques
    • Use a Code File in Multiple Projects
    • Procedures
    • Display the Project Properties Dialog Box from an Open Project
    • Copy Classes Dialog Box
    • Project Codes Tab of the Application Preferences Dialog Box
    • Display the New Class Wizard
    • Merge Sub-Projects into a New Project
    • General Information Page of the New Project Wizard
    • Actual Costs Preferences
    • Remove Sub-Projects from a Master Project
    • Copy Project Preferences
    • Replan Preferences
    • Included Actual Classes Tab of the Classes Tab
    • Assign Control Account and Work Package Structures to a Project
    • Display the Project Properties Dialog Box Tabs from an Open Project File
    • Files Tab of the Project Properties Dialog Box
    • Procedures
    • Display the Project Properties Dialog Box Tabs without Opening a Project File
    • Sub-Projects Validation Dialog Box
    • Procedures
    • Merge Sub-Projects into a New Project
    • Include in Actuals Cost Set Page of the New Class Wizard
    • Procedures
    • Budget Tab of the Project Properties Dialog Box
    • Copy Cost Sets Dialog Box
    • Add Control Account Dialog Box
    • Preferences Tab of the Project Properties Dialog Box
    • Recalc Preferences
    • Save As Dialog Box (Merging Projects)
    • Select the Level at Which to Capture Actual Costs
    • Schedule Mapping Page of the Integration Wizard-Primavera
    • Assign Ancillary Files to a Project
    • Create a New Class
    • Rolling Wave Dialog Box of the Project Properties Dialog Box
    • Remove Sub-Projects from a Master Project
    • Assign a Forecast Method to a Forecast Class
    • Select EVMS Acceptance for a Project
    • General Information Page of the New Class Wizard
    • Class Settings Page for Budget Class of the New Class Wizard
    • Calculate Progress
    • Associate an Earned Value Class with a Forecast Class
    • General Tab of the Classes Tab
    • Class Overview
    • Classes Tab of the Project Properties Dialog Box
    • Using the Selected and Secure Checkboxes
    • Set Up a Retain EAC Forecast with the Scale EAC Option
    • Progress Techniques
    • Custom Cost Classes
    • Assign a Calendar Set to a Forecast or Budget Class
    • Confirmation Page of the New Class Wizard
    • Procedures
    • Procedures
    • Run the Rolling Wave Process Without Advancing the Calendar
    • Class Settings Page for Forecast Class of the New Class Wizard
    • Copy Existing Cost Sets to a Project
    • Open Status Tab of the Project Properties Dialog Box
    • Advance Calendar
    • Modify the Project Description
    • Class Settings Page for Earned Class of the New Class Wizard
    • Display the Project Properties Dialog Box without Opening the Project
    • Include in Earned Cost Set Page of the New Class Wizard
    • Include in EAC Cost Set Page of the New Class Wizard
    • Procedures
    • Included Earned Classes Tab of the Classes Tab
    • Contract Information Tab of the Project Properties Dialog Box
    • Procedures
    • Create a New Cost Set
    • Reclass Preferences
    • Procedures
    • Access Control Page of the New Project Wizard
    • Integration Wizard Preferences
    • Assign a Budget Source to a Budget Class
    • New Class Wizard
    • Schedule Mapping Page of the Integration Wizard-Open Plan
    • Copy Codes to Another Project
    • Enter Project Dates
    • Enter Contract Information
    • Assign a Rate File to a Forecast Actual or Budget Class
    • Earned Preferences
    • Project Properties Dialog Box
    • Run the Rolling Wave Process Without Advancing the Calendar
    • Access Control Tab of the Project Properties Dialog Box
    • Set Reporting Options
    • Procedures
    • Procedures
    • Fields Tab of the Project Properties Dialog Box
    • Cost Sets Tab of the Project Properties Dialog Box
    • Select the Level at Which to Capture Actual Costs
    • Enter Budget Information
    • Include in Budget Cost Set Page of the New Class Wizard
    • Included Budget Classes Tab of the Classes Tab
    • Procedures
    • Assign Codes to a Project
    • Associate an Actual Class with a Forecast Class
    • Options Page of the Advance Calendar Wizard
    • Procedures
    • General Tab of the Project Properties Dialog Box
  • project properties
    • Forecast Preferences
    • Synchronize Status Dates
    • Advance Calendar Preferences
  • project properties dialog box
    • Code Assignments Tab of the Project Properties Dialog Box
    • Class Settings Page for Actuals Class of the New Class Wizard
    • Forecast Class Page of the New Class Wizard
    • Associate a Budget Class with a Forecast Actual or Earned Class
    • Forecast Preferences
    • ANSI EIA X12 Preferences
    • Analyze Preferences
    • Delete a Cost Set
    • Copy Project Codes Dialog Box
    • Spreadsheet Pane of the Project View
    • Audit Reports
    • Copy Preferences Dialog Box
    • Procedures
    • Project Preferences
    • Progress Techniques
    • Use a Code File in Multiple Projects
    • Procedures
    • Display the Project Properties Dialog Box from an Open Project
    • Copy Classes Dialog Box
    • Project Codes Tab of the Application Preferences Dialog Box
    • Display the New Class Wizard
    • Merge Sub-Projects into a New Project
    • General Information Page of the New Project Wizard
    • Actual Costs Preferences
    • Remove Sub-Projects from a Master Project
    • Copy Project Preferences
    • Replan Preferences
    • Included Actual Classes Tab of the Classes Tab
    • Assign Control Account and Work Package Structures to a Project
    • Display the Project Properties Dialog Box Tabs from an Open Project File
    • Files Tab of the Project Properties Dialog Box
    • Procedures
    • Display the Project Properties Dialog Box Tabs without Opening a Project File
    • Sub-Projects Validation Dialog Box
    • Procedures
    • Merge Sub-Projects into a New Project
    • Include in Actuals Cost Set Page of the New Class Wizard
    • Procedures
    • Budget Tab of the Project Properties Dialog Box
    • Copy Cost Sets Dialog Box
    • Add Control Account Dialog Box
    • Preferences Tab of the Project Properties Dialog Box
    • Recalc Preferences
    • Save As Dialog Box (Merging Projects)
    • Select the Level at Which to Capture Actual Costs
    • Assign Ancillary Files to a Project
    • Create a New Class
    • Rolling Wave Dialog Box of the Project Properties Dialog Box
    • Remove Sub-Projects from a Master Project
    • Assign a Forecast Method to a Forecast Class
    • Select EVMS Acceptance for a Project
    • General Information Page of the New Class Wizard
    • Synchronize Status Dates
    • Class Settings Page for Budget Class of the New Class Wizard
    • Calculate Progress
    • Associate an Earned Value Class with a Forecast Class
    • General Tab of the Classes Tab
    • Class Overview
    • Classes Tab of the Project Properties Dialog Box
    • Set Up a Retain EAC Forecast with the Scale EAC Option
    • Progress Techniques
    • Custom Cost Classes
    • Assign a Calendar Set to a Forecast or Budget Class
    • Confirmation Page of the New Class Wizard
    • Procedures
    • Procedures
    • Run the Rolling Wave Process Without Advancing the Calendar
    • Class Settings Page for Forecast Class of the New Class Wizard
    • Copy Existing Cost Sets to a Project
    • Open Status Tab of the Project Properties Dialog Box
    • Procedures
    • Advance Calendar
    • Modify the Project Description
    • Class Settings Page for Earned Class of the New Class Wizard
    • Display the Project Properties Dialog Box without Opening the Project
    • Include in Earned Cost Set Page of the New Class Wizard
    • Include in EAC Cost Set Page of the New Class Wizard
    • Procedures
    • Add a Class to a Cost Set
    • Included Earned Classes Tab of the Classes Tab
    • Contract Information Tab of the Project Properties Dialog Box
    • Procedures
    • Create a New Cost Set
    • Reclass Preferences
    • Procedures
    • Access Control Page of the New Project Wizard
    • Integration Wizard Preferences
    • Assign a Budget Source to a Budget Class
    • New Class Wizard
    • Advance Calendar Preferences
    • Copy Codes to Another Project
    • Enter Project Dates
    • Enter Contract Information
    • Assign a Rate File to a Forecast Actual or Budget Class
    • Earned Preferences
    • Project Properties Dialog Box
    • Run the Rolling Wave Process Without Advancing the Calendar
    • Access Control Tab of the Project Properties Dialog Box
    • Set Reporting Options
    • Procedures
    • Procedures
    • Cost Sets Tab of the Project Properties Dialog Box
    • Select the Level at Which to Capture Actual Costs
    • Enter Budget Information
    • Include in Budget Cost Set Page of the New Class Wizard
    • Included Budget Classes Tab of the Classes Tab
    • Procedures
    • Assign Codes to a Project
    • Associate an Actual Class with a Forecast Class
    • Options Page of the Advance Calendar Wizard
    • Procedures
    • General Tab of the Project Properties Dialog Box
  • project properties dialog box
  • project replan
    • Process Complete Page of the Replan Wizard
    • Work Package Name Page of the Replan Wizard
    • Process Running Page of the Replan Wizard
    • Method Page of the Replan Wizard
    • Options Page of the Replan Wizard
    • Process Lock
  • project security
    • Give a Group Access to a Project
    • Project Security
    • Give a User Access to a Project
    • Procedures
  • project selection page
    • Project Selection Page of the Project Audit Wizard
    • Project Selection Page of the Advance Calendar Wizard
    • Project Selection Page of the Recalc Wizard
    • Project Selection Page of the Apportionment Calculation Wizard
    • Project Selection Page of the Rolling Wave Wizard
    • Project Selection Page of the Respread Wizard
    • Project Selection Page of the Zero-Out Data Wizard
    • Project Selection Page of the Integration Wizard-Files
    • Project Selection Page of the Calculate Forecast Wizard
    • Project Selection Page of the Update Totals Wizard
    • Status Page of the Integration Wizard-Files
    • Project Selection Page of the ANSI EIA X12 Wizard
    • Project Selection Page of the Reclass Wizard
    • Project Selection Page of the Freeze Forecast Wizard
    • Project Selection Page of the Replan Wizard
    • Project Selection Page of the Update Codes Wizard
    • Project Selection Page of the Replace Resources Wizard
    • Project Selection Page of the Integration Wizard
    • Project Selection Page of the Align Time-phased Dates Wizard
    • Project Selection Page of the Calculate Progress Wizard
    • Project Selection Page of the Assignment Import/Assignment Export Wizard
    • Status Page of the Integration Wizard
    • Project Selection Page of the Top-Down Planning Wizard
    • Project Selection Page of the Validity Check Wizard
    • Project Selection Page of the Integration Wizard-Scheduling Tools
    • Project Selection Page of the Slip Wizard
  • project template
    • Settings Page of the New Project Wizard
    • General Information Page of the New Project Wizard
    • General Tab of the Application Preferences Dialog Box
    • Required Template Files
    • API Script to Create a New Project from a Project Template
  • project toolbar
  • project view
    • Resource Assignments Page of the Assignment Import/Assignment Export Wizard
    • Class Settings Page for Actuals Class of the New Class Wizard
    • Rename Work Package Dialog Box
    • Process Running Page of the Reclass Wizard
    • Resource Assignment Percent Complete Dialog Box
    • Associate a Budget Class with a Forecast Actual or Earned Class
    • Color Band
    • Assign a Progress Technique to a Work Package
    • Time-phase Pane of the Project View
    • Add Work Package Dialog Box
    • Copy and Paste in the Project View
    • Rename a Work Package
    • Settings Page of the New Project Wizard
    • Project Selection Page of the Advance Calendar Wizard
    • Confirmation Page of the Calculate Progress Wizard
    • Copy Work Package Dialog Box
    • Spreadsheet Pane of the Project View
    • Process Running Page of the Advance Calendar Wizard
    • Process Running Page of the Calculate Forecast Wizard
    • Copy Control Account Dialog Box
    • Update EAC
    • Turn On the Opening % Feature When Integrating with Open Plan
    • Progress Techniques
    • Reconcile Budgets and Forecasts
    • Advance to Period Page of the Advance Calendar Wizard
    • Save the Contents of the Spreadsheet Pane as an Excel File
    • Display the Project Properties Dialog Box from an Open Project
    • Spread Budgets Using Pre-defined Spread Methods
    • Sub-Totals Page of the Report Wizard
    • Project Selection Page of the Respread Wizard
    • General Information Page of the New Project Wizard
    • Projects
    • Process Complete Page of the Calculate Forecast Wizard
    • Export and Import Time-Phased Resource Assignments
    • General Tab of the Application Preferences Dialog Box
    • Assign Control Account and Work Package Structures to a Project
    • Codes Tab of the Project View
    • Delete Milestones or Steps
    • Include in Actuals Cost Set Page of the New Class Wizard
    • Add a New Work Package using the Dialog Box
    • Add Control Account Dialog Box
    • Confirmation Page of the Reclass Wizard
    • Project Selection Page of the Calculate Forecast Wizard
    • Rename Control Account Dialog Box
    • Project Selection Page of the Update Totals Wizard
    • Manual Performance Factors Page of the Calculate Forecast Wizard
    • Update EAC Dialog Box
    • Select the Level at Which to Capture Actual Costs
    • Procedures
    • Assign a Forecast Method to a Forecast Class
    • Select EVMS Acceptance for a Project
    • Spreadsheet Pane Column Definitions
    • Save a Project as a Different Project
    • General Information Page of the New Class Wizard
    • Spread Updated Budgets for Resources
    • Add Resource Assignment Dialog Box
    • Display the New Project Wizard
    • Spread Dialog Box
    • Process Complete Page of the Assignment Import/Assignment Export Wizard
    • Associate an Earned Value Class with a Forecast Class
    • Copy a Work Package
    • Add a Resource Assignment
    • Explore Cobra
    • Import Location Page of the Assignment Import Wizard
    • Project Selection Page of the Reclass Wizard
    • Process Running Page of the Calculate Progress Wizard
    • Project View
    • Progress Techniques
    • Using Spread
    • Assign a Calendar Set to a Forecast or Budget Class
    • Confirmation Page of the New Class Wizard
    • Move a Work Package
    • Run the Rolling Wave Process Without Advancing the Calendar
    • Target Class Page of the Reclass Wizard
    • User Preferences Dialog Box
    • Display the Project View
    • Process Complete Page of the Reclass Wizard
    • Move a Control Account
    • Advance Calendar
    • Rename a Control Account
    • Results Tab of the Resource File Properties Dialog Box
    • Move Work Package Dialog Box
    • Class Settings Page for Earned Class of the New Class Wizard
    • Display the Project Properties Dialog Box without Opening the Project
    • Include in EAC Cost Set Page of the New Class Wizard
    • Procedures
    • Add a New Control Account using the Dialog Box
    • Adjust Budget Spreads Manually
    • Add Milestones or Steps
    • Confirmation Page of the Advance Calendar Wizard
    • Reconcile Milestone Weights
    • Data Entry in the Time-phase Pane
    • Process Complete Page of the Advance Calendar Wizard
    • Assign a Budget Source to a Budget Class
    • Shortcut Menu
    • Criteria Selection Page of the Recalc Wizard
    • Move Control Account Dialog Box
    • Time-phase Detail Pane of the Project View
    • Tabbed Pane of the Project View
    • Spread Curve Dialog Box
    • Enter Contract Information
    • General Tab of the Project View
    • Forecast Details Pane
    • Process Complete Page of the Recalc Wizard
    • Confirmation Page of the Replace Resources Wizard
    • Project Selection Page of the Calculate Progress Wizard
    • Run the Rolling Wave Process Without Advancing the Calendar
    • Project Selection Page of the Assignment Import/Assignment Export Wizard
    • Confirmation Page of the Respread Wizard
    • Resource Selection Page of the Replace Resources Wizard
    • Set Reporting Options
    • Criteria Page of the Reclass Wizard
    • Process Complete Page of the Calculate Progress Wizard
    • Milestones/Steps Tab of the Project View
    • Options Page of the Calculate Forecast Wizard
    • Classes Page of the Respread Wizard
    • Update Totals Process
    • Select the Level at Which to Capture Actual Costs
    • Enter Budget Information
    • Include in Budget Cost Set Page of the New Class Wizard
    • Advance the Calendar
    • Log Comment Page of the Assignment Import/Assignment Export Wizard
    • Notes Tab of the Project View
    • Date Range Page of the Recalc Wizard
    • Time-phase Pane Field Descriptions
    • Modify Milestones or Steps
    • Options Page of the Advance Calendar Wizard
    • Add Resource Results Dialog Box
    • Copy a Control Account
    • Manual Forecasts
    • Reclass a Class
    • Reconcile Milestone Weight Variance Dialog Box
    • Fields Page of the New Project Wizard
  • projects
    • Rename Work Package Dialog Box
    • Assign a Progress Technique to a Work Package
    • Considerations When Creating Names in Cobra
    • Project Preferences
    • Update EAC
    • Considerations When Creating Names in Cobra
    • Turn On the Opening % Feature When Integrating with Open Plan
    • Reconcile Budgets and Forecasts
    • Projects
    • Delete Milestones or Steps
    • Spread Updated Budgets for Resources
    • Add Resource Assignment Dialog Box
    • Spread Dialog Box
    • Project View
    • Using Spread
    • Move a Work Package
    • Display the Project View
    • Procedures
    • Add Milestones or Steps
    • Shortcut Menu
    • General Tab of the Project View
    • Projects
    • Modify Milestones or Steps
    • Copy a Control Account
  • projects pane
    • Projects Pane Column Definitions
    • Projects Pane
    • Shortcut Menu
  • purge
  • purge dialog box
  • qat
  • rate
    • Class Settings Page for Actuals Class of the New Class Wizard
    • Enable a User to Access a Resource File
    • SQL Command Utility
    • Rename Dialog Box
    • Rate Sets
    • Preparing the Primavera Schedule
    • Action Selection Page of the Integration Wizard
    • Examples of Manual Forecast Calculations
    • Perform Apportionment Mapping
    • File Format for Importing Apportionment Mapping
    • Validity Check Process
    • Create a New Resource File
    • Rate View
    • Resource File Security
    • Calculations Tab of the Resource View
    • Rate Tags
    • Reporting
    • General Information Page of the New Project Wizard
    • Projects
    • Project and Apportionment Validations Page of the Validity Check Wizard
    • Integration Configuration Page of the Integration Wizard
    • Integration Wizard
    • Rate File Information Tags
    • Files Tab of the Project Properties Dialog Box
    • Statistical Forecasts
    • Sub-Projects Validation Dialog Box
    • EPM Security Administrator Functions
    • Resources and Rates Page of the Integration Wizard
    • Report Categories
    • Recalc Preferences
    • Rate Sets Grid
    • Ancillary File Validations Page of the Validity Check Wizard
    • Spreadsheet Pane Column Definitions
    • Resources
    • Data Import-Ancillary Data
    • Examples of Forecast Calculations
    • Code Fields Page of the New Rate File Wizard
    • Apportionment Setup Steps
    • Required Template Files
    • Save As Dialog Box (Ancillary Files)
    • Manage Sorts Dialog Box of the Report Wizard
    • Calculate Progress
    • Resource File Information Tags
    • General Tab of the Classes Tab
    • Classes Tab of the Project Properties Dialog Box
    • File Selection Page of the Integration Wizard
    • General Tab of the Resource File Properties Dialog Box
    • Custom Cost Classes
    • Assign a Calendar Set to a Forecast or Budget Class
    • Open File Dialog Box
    • Open File Dialog Box
    • Class Information Tags
    • Report Types
    • Add Results to a Resource
    • How Cobra Spreads ETC
    • Integration Configuration Page of the Integration Wizard
    • Code View
    • XML Configuration File
    • Lookup Dialog Box
    • Assign a Rate Set to a Result
    • Delete a Rate From a Rate Set
    • Sample Earned Value Calculation
    • Integration Configuration Page of the Integration Wizard
    • Advance Calendar
    • Preparing the Open Plan Schedule
    • Preparing Cobra for Schedule Integration
    • Results Tab of the Resource File Properties Dialog Box
    • Forecast Calculations
    • Template Resource Files
    • Purge Dialog Box
    • Cobra Components
    • Recalc
    • New File Dialog Box
    • Examples of Statistical Forecast Calculations
    • XML Configuration Object Interface
    • Resource Calculation Tags
    • Resources
    • Advance Calendar Process
    • New File Dialog Box
    • Default Rates Page of the New Resource File Wizard
    • Save As Dialog Box (Ancillary Files)
    • Calendar Sets
    • Resource Components
    • Options Page of the Advance Calendar Wizard
    • Add Resource Results Dialog Box
    • Ancillary Files Page of the New Project Wizard
    • Results or Field Names
    • Manual Forecasts
  • rate
  • rate edit tab
  • rate file
    • Class Settings Page for Actuals Class of the New Class Wizard
    • Enable a User to Access a Resource File
    • File Format for Importing Apportionment Mapping
    • Validity Check Process
    • Create a New Resource File
    • Resource File Security
    • Rate Tags
    • General Information Page of the New Project Wizard
    • Rate File Information Tags
    • Files Tab of the Project Properties Dialog Box
    • Sub-Projects Validation Dialog Box
    • EPM Security Administrator Functions
    • Resources and Rates Page of the Integration Wizard
    • Example Rate File
    • Enable a Group to Access a Rate File
    • Ancillary File Validations Page of the Validity Check Wizard
    • Required Template Files
    • Save As Dialog Box (Ancillary Files)
    • Resource File Information Tags
    • General Tab of the Classes Tab
    • Classes Tab of the Project Properties Dialog Box
    • General Tab of the Resource File Properties Dialog Box
    • Custom Cost Classes
    • Assign a Calendar Set to a Forecast or Budget Class
    • Class Information Tags
    • Code View
    • XML Configuration File
    • Lookup Dialog Box
    • Assign a Rate Set to a Result
    • Sample Earned Value Calculation
    • Preparing Cobra for Schedule Integration
    • Purge Dialog Box
    • Rate File Security
    • Rate File Properties Dialog Box
    • XML Configuration Object Interface
    • Enable a User to Access a Rate File
    • Default Rates Page of the New Resource File Wizard
    • Rate Files
    • Save As Dialog Box (Ancillary Files)
    • Calendar Sets
    • Resource Components
    • Options Page of the Advance Calendar Wizard
    • Ancillary Files Page of the New Project Wizard
    • Create a New Rate File
  • rate file properties
    • Display the Rate File Properties Dialog Box Tabs without Opening a Rate File
    • Display the Rate File Properties Dialog Box Tabs from an Open Rate File
    • Access Control Tab of the Rate File Properties Dialog Box
    • Code Fields Tab of the Rate File Properties Dialog Box
    • Rate File Properties Dialog Box
    • General Tab of the Rate File Properties Dialog Box
  • rate file properties
  • rate set
    • Rename Dialog Box
    • Rate Sets
    • Procedures
    • File Format for Importing Apportionment Mapping
    • Delete a Rate Set
    • Add a Rate to an Existing Rate Set
    • Calculations Tab of the Resource View
    • Rate Tags
    • Reporting
    • Project and Apportionment Validations Page of the Validity Check Wizard
    • Sub-Projects Validation Dialog Box
    • Report Categories
    • Rate Sets Grid
    • Ancillary File Validations Page of the Validity Check Wizard
    • Rename a Rate Set
    • Generate Rates for an Existing Rate Set
    • Rate Set Options Page of the Add Rate Set Wizard
    • Resource File Information Tags
    • Custom Cost Classes
    • Add Results to a Resource
    • Assign a Rate Set to a Result
    • Delete a Rate From a Rate Set
    • Add a Rate Set to a Rate File
    • Results Tab of the Resource File Properties Dialog Box
    • Template Resource Files
    • Resource Calculation Tags
    • Resource Components
    • Options Page of the Advance Calendar Wizard
    • Add Resource Results Dialog Box
  • rate set wizard
  • rate view
    • Procedures
    • Rate View
    • Details Tab of the Rate View
    • Rate Sets Grid
    • Display the Details Tab of the Rate View
    • Display the Rate View using the Rates Group Bar
    • Display the Rate View using the Cobra Button
    • Shortcut Menu
  • rates
    • Rates
    • Procedures
    • Rates
  • rates grid
  • rates pane
    • Rates Pane Column Definitions
    • Rates Pane
    • Shortcut Menu
  • recal wizard
  • recalc
    • Project Selection Page of the Recalc Wizard
    • Recalculate Costs
    • Options Page of the Recalc Wizard
    • Results Page of the Recalc Wizard
    • Procedures
    • Criteria Selection Page of the Recalc Wizard
    • Recalc Wizard
    • Recalc
    • Process Complete Page of the Recalc Wizard
    • Recalculation Techniques
    • Process Running Page of the Recalc Wizard
    • Confirmation Page of the Recalc Wizard
    • Classes Page of the Recalc Wizard
    • Date Range Page of the Recalc Wizard
    • Recalculate Process
  • recalc wizard
    • Project Selection Page of the Recalc Wizard
    • Recalculate Costs
    • Options Page of the Recalc Wizard
    • Results Page of the Recalc Wizard
    • Procedures
    • Criteria Selection Page of the Recalc Wizard
    • Recalc Wizard
    • Recalc
    • Process Complete Page of the Recalc Wizard
    • Recalculation Techniques
    • Process Running Page of the Recalc Wizard
    • Confirmation Page of the Recalc Wizard
    • Date Range Page of the Recalc Wizard
  • recalculate
  • recalculation
    • Class Settings Page for Actuals Class of the New Class Wizard
    • Process Logs
    • Project Selection Page of the Recalc Wizard
    • Recalc Preferences
    • Recalculate Costs
    • Apportionment Process
    • Options Page of the Recalc Wizard
    • Results Page of the Recalc Wizard
    • wInsight Database Page of the wInsight Wizard
    • Procedures
    • Criteria Selection Page of the Recalc Wizard
    • Recalc Wizard
    • Recalc
    • Process Complete Page of the Recalc Wizard
    • Recalculation Techniques
    • Process Running Page of the Recalc Wizard
    • Confirmation Page of the Recalc Wizard
    • Classes Page of the Recalc Wizard
    • Date Range Page of the Recalc Wizard
  • reclass
    • Process Running Page of the Reclass Wizard
    • Data Access Tab of the Application Preferences Dialog Box
    • Process Logs
    • Confirmation Page of the Reclass Wizard
    • Supported Processes, Operations, and Data
    • Project Selection Page of the Reclass Wizard
    • Set Up a Retain EAC Forecast with the Scale EAC Option
    • Using Spread
    • Reclass
    • Target Class Page of the Reclass Wizard
    • Process Complete Page of the Reclass Wizard
    • Procedures
    • Reclass Process
    • Reclass Preferences
    • Secure Baseline Dates
    • Reclass Guidelines
    • Options Page of the Reclass Wizard
    • Criteria Page of the Reclass Wizard
    • Cobra Web Service
    • Process Logs Dialog Box
    • Reclass Wizard
    • Date Range Page of the Reclass Wizard
    • Manual Forecasts
    • Copy Budget to a Manual Forecast Using the Reclass Wizard
    • Source Class Page of the Reclass Wizard
    • Reclass a Class
  • reclass wizard
    • Process Running Page of the Reclass Wizard
    • Confirmation Page of the Reclass Wizard
    • Project Selection Page of the Reclass Wizard
    • Reclass
    • Target Class Page of the Reclass Wizard
    • Process Complete Page of the Reclass Wizard
    • Procedures
    • Options Page of the Reclass Wizard
    • Criteria Page of the Reclass Wizard
    • Reclass Wizard
    • Date Range Page of the Reclass Wizard
    • Copy Budget to a Manual Forecast Using the Reclass Wizard
    • Source Class Page of the Reclass Wizard
    • Reclass a Class
  • reconcile
  • reconcile log
    • Supported Processes, Operations, and Data
    • Reconcile Log Process
    • Cobra Web Service
  • reconcile milestone weights
    • Reconcile Milestone Weights
    • Reconcile Milestone Weight Variance Dialog Box
  • rename
  • rename control account dialog box
  • rename dialog box
  • rename work package dialog box
  • reorder codes dialog box
    • Display the Reorder Resources/Codes Dialog Box
    • Display the Reorder Resources/Codes Dialog Box
  • reorder resources dialog box
    • Display the Reorder Resources/Codes Dialog Box
    • Display the Reorder Resources/Codes Dialog Box
  • replace resources
    • Replace Resources Wizard
    • Procedures
    • Process Running Page of the Replace Resources Wizard
    • Project Selection Page of the Replace Resources Wizard
    • Replace Resources
    • Confirmation Page of the Replace Resources Wizard
    • Resource Selection Page of the Replace Resources Wizard
    • Replace or Merge Resources
    • Process Complete Page of the Replace Resources Wizard
    • Process Logs Dialog Box
    • Replace Resources Process
  • replace resources wizard
    • Replace Resources Wizard
    • Procedures
    • Process Running Page of the Replace Resources Wizard
    • Project Selection Page of the Replace Resources Wizard
    • Replace Resources
    • Confirmation Page of the Replace Resources Wizard
    • Resource Selection Page of the Replace Resources Wizard
    • Replace or Merge Resources
    • Process Complete Page of the Replace Resources Wizard
  • replan
    • Process Complete Page of the Replan Wizard
    • Work Package Name Page of the Replan Wizard
    • Procedures
    • Process Running Page of the Replan Wizard
    • Method Page of the Replan Wizard
    • Criteria Page of the Replan Wizard
    • Replan
    • Replan Preferences
    • Confirmation Page of the Replan Wizard
    • Project Selection Page of the Replan Wizard
    • Replan Process
    • Options Page of the Replan Wizard
    • Replan Wizard
    • Perform Project Replan
  • replan wizard
    • Process Complete Page of the Replan Wizard
    • Work Package Name Page of the Replan Wizard
    • Procedures
    • Process Running Page of the Replan Wizard
    • Method Page of the Replan Wizard
    • Criteria Page of the Replan Wizard
    • Replan
    • Confirmation Page of the Replan Wizard
    • Project Selection Page of the Replan Wizard
    • Options Page of the Replan Wizard
    • Replan Wizard
    • Perform Project Replan
  • report
    • Data Tool
    • Performance Data Page of the wInsight Wizard
    • Code Assignments Tab of the Project Properties Dialog Box
    • Report Content Parameters
    • Application Preferences
    • Data Access Tab of the Application Preferences Dialog Box
    • IPMR Format 2 Summary Page of the Report Wizard
    • Code Files
    • Report Information Tags
    • Reorder Resources
    • Spread Curves Tab of the Application Preferences Dialog Box
    • Analyze Preferences
    • Report Template Format
    • Create Graph Reports from the Analyze Form
    • Settings Page of the New Project Wizard
    • Spreadsheet Pane of the Project View
    • Audit Reports
    • Baseline Tags
    • New Filter Dialog Box of the Report Wizard
    • Thresholds Tab of the Code File Properties Dialog Box
    • Report Criterion Parameters
    • Confirmation Page of the Report Wizard
    • Use a Code File in Multiple Projects
    • Reduce Memory Consumption for Very Large Reports
    • Analyze Options Dialog Box
    • Report Parameters
    • Project Codes Tab of the Application Preferences Dialog Box
    • Codes
    • Sub-Totals Page of the Report Wizard
    • Calculations Tab of the Resource View
    • Reporting
    • General Information Page of the New Project Wizard
    • Thresholds Page of the New Code File Wizard
    • Back Up Your Data
    • Personal Reports Pane
    • Copy Down Code Assignments to Child Resources
    • Projects
    • New Filter Expression Dialog Box of the Report Wizard
    • Report Properties Dialog Box
    • Calculated Results
    • Edit Comment and Change Number Page of the Project Audit Wizard
    • General Tab of the Application Preferences Dialog Box
    • Code Fields Page of the New Code File Wizard
    • Report Wizard
    • Include in Actuals Cost Set Page of the New Class Wizard
    • Report Options
    • Report Categories
    • General Information Page of the New Code File Wizard
    • Select EVMS Acceptance for a Project
    • Results Page of the Report Wizard
    • Configure Cobra to Work with Microsoft Project Server
    • Resources
    • Open Dialog Box of the Calculated Results Wizard
    • Report Wizard Parameters
    • Miscellaneous Page of the wInsight Wizard
    • Display the New Project Wizard
    • Resource-Loaded Schedule
    • Calendars
    • Actual Cost Import File
    • Cost Sets Page of the Report Wizard
    • Manage Sorts Dialog Box of the Report Wizard
    • Batch Reports Dialog Box
    • General Tab of the Classes Tab
    • Classes Tab of the Project Properties Dialog Box
    • Ancillary Reports
    • General Information Page of the New Calendar File Wizard
    • Custom Cost Classes
    • Multiproject Operations (Master and Subprojects)
    • Apportionment Process
    • Access Control Page of the Report Wizard
    • Code Fields Page of the New Resource File Wizard
    • Report Types
    • User Preferences Dialog Box
    • Advance Calendar
    • Preparing the Open Plan Schedule
    • Guidelines for Accurate Earned Value Management
    • Thresholds Page of the New Resource File Wizard
    • Results Tab of the Resource File Properties Dialog Box
    • New Sort Dialog Box of the Report Wizard
    • Notes Tab of the Resource View
    • Access Control Tab of the Edit Batch Report Dialog Box
    • Log Operation Page of the Project Audit Wizard
    • Contract Information Tab of the Project Properties Dialog Box
    • Flag Periods
    • Log Change Comment Dialog Box
    • Copy Calculated Result Dialog Box of the Calculated Results Wizard
    • Log Significant Changes for IPMR Format 3 Reports
    • Save Graph Reports as Graphic Files
    • Resources and Code Files
    • Formula Tags
    • Element of Cost Page of the wInsight Wizard
    • Frozen Forecasts
    • IPMR Format 2 Summary Page of the wInsight Wizard
    • Change Management Tags
    • Cobra 8.4 Help System
    • Retain EAC
    • Planning Reports
    • Perform Project Analysis
    • Validate Code Assignments — Solve Roll-Up Issues
    • New Sort Expression Dialog Box of the Report Wizard
    • Resources
    • Style Page of the Report Wizard
    • Set Reporting Options
    • Codes
    • Cost Sets Tab of the Project Properties Dialog Box
    • Edit Sort Expression Dialog Box of the Report Wizard
    • Process Logs Dialog Box
    • Resource-Loaded Schedule
    • Manage Filters Dialog Box of the Report Wizard
    • Included Budget Classes Tab of the Classes Tab
    • Generate a Report
    • Calendar Sets
    • Resource Components
    • Column Reports
    • Reorder Codes
    • Add Resource Results Dialog Box
    • Ancillary Files Page of the New Project Wizard
    • Time-phased Reports
    • Report Filter Information Tags
    • Process Complete Page of the Report Wizard
    • Results or Field Names
    • Reports Tab of the Application Preferences Dialog Box
    • Control Account Versus Work Package Level
    • Options Page of the ANSI EIA X12 Wizard
    • Report Templates
    • Fields Page of the New Project Wizard
  • report categories
    • Format Reports
    • Ancillary Reports
    • Export Reports
    • Graphic Reports
    • Generate a Report
  • report parameters
  • report properties
    • Report Information Tags
    • Report Properties Dialog Box
    • Report Categories
    • Access Control Page of the Report Wizard
  • report properties dialog box
    • Access Control Tab of the Report Properties Dialog Box
    • Procedures
    • Information Tab of the Report Properties Dialog Box
    • General Tab of the Report Properties Dialog Box
    • Report Definition Tab of the Report Properties Dialog Box
    • Display the Report Properties Dialog Box
  • report tags
    • Report Information Tags
    • Calendar Holiday Tags
    • Calendar File Information Tags
    • Explanation of Variance Narrative Tags
    • Rate Tags
    • Cost Set Information Tags
    • Rate File Information Tags
    • Code File Information Tags
    • Project Information Tags
    • Resource File Information Tags
    • Apportionment Mapping Tags
    • Work Package Tags
    • Class Information Tags
    • Milestone Tags
    • Code Tags
    • Resource Assignment Tags
    • Note Information Tags
    • Change Management Tags
    • Rate Set Tags
    • Control Account Tags
    • Resource Calculation Tags
    • Control Account and Work Package Note Tags
    • Calendar Period Tags
    • Resource Tags
    • Report Filter Information Tags
  • report template
    • Report Information Tags
    • Calendar Holiday Tags
    • Analyze Preferences
    • Report Template Format
    • Calendar File Information Tags
    • Explanation of Variance Narrative Tags
    • Report Criterion Parameters
    • Reduce Memory Consumption for Very Large Reports
    • Analyze Options Dialog Box
    • Report Parameters
    • Rate Tags
    • Cost Set Information Tags
    • Rate File Information Tags
    • Code File Information Tags
    • Report Options
    • Project Information Tags
    • Report Wizard Parameters
    • Resource File Information Tags
    • Work Package Tags
    • Property Tags
    • Class Information Tags
    • Milestone Tags
    • Report Template Tags
    • Code Tags
    • Section Tags
    • Resource Assignment Tags
    • Formula Tags
    • Note Information Tags
    • Change Management Tags
    • Rate Set Tags
    • Control Account Tags
    • Resource Calculation Tags
    • Other Tags
    • Style Page of the Report Wizard
    • Report Template Location
    • Control Account and Work Package Note Tags
    • Resource Tags
    • Report Filter Information Tags
    • Reports Tab of the Application Preferences Dialog Box
    • Report Templates
  • report template tags
    • Calendar Holiday Tags
    • Property Tags
    • Section Tags
    • Formula Tags
    • Other Tags
    • Calendar Period Tags
  • report wizard
    • Report Content Parameters
    • IPMR Format 2 Summary Page of the Report Wizard
    • Projects Selection Page of the Report Wizard
    • Audit Reports
    • New Filter Dialog Box of the Report Wizard
    • Report Criterion Parameters
    • Confirmation Page of the Report Wizard
    • Calendar Page of the Report Wizard
    • Reduce Memory Consumption for Very Large Reports
    • Report Parameters
    • Sub-Totals Page of the Report Wizard
    • Process Running Page of the Report Wizard
    • Save and Run Page of the Report Wizard
    • Personal Reports Pane
    • Copy Filter Dialog Box of the Report Wizard
    • Codes and the Report Wizard
    • New Filter Expression Dialog Box of the Report Wizard
    • Report Wizard
    • Report Options
    • Report Categories
    • Results Page of the Report Wizard
    • Open Dialog Box of the Calculated Results Wizard
    • Report Wizard Parameters
    • Cost Sets Page of the Report Wizard
    • Manage Sorts Dialog Box of the Report Wizard
    • Filter and Sort Page of the Report Wizard
    • Edit Filter Expression Dialog Box of the Report Wizard
    • User Preferences Dialog Box
    • Procedures
    • Copy Sort Dialog Box of the Report Wizard
    • Display the Report Wizard
    • New Sort Dialog Box of the Report Wizard
    • Copy Calculated Result Dialog Box of the Calculated Results Wizard
    • Report Page of the Report Wizard
    • Create a Calculated Result
    • New Sort Expression Dialog Box of the Report Wizard
    • Display the Calculated Results Wizard
    • Style Page of the Report Wizard
    • Edit Sort Expression Dialog Box of the Report Wizard
    • Manage Filters Dialog Box of the Report Wizard
    • Process Complete Page of the Report Wizard
  • report Wizard
  • reporting tab
    • Keyboard Shortcuts
    • Reporting Tab
  • reports
    • Restoring Reports and Configurations
    • File Backup
    • Customization of Reports
    • Export Reports
    • Report Template Tags
    • Configure Calendar Set 19 for IPMR Reports, wInsight Integration, and Cost Data Export/DCDE Format
    • Reporting Tab
    • Reports
  • resource
    • Data Tool
    • Performance Data Page of the wInsight Wizard
    • Resource Assignments Page of the Assignment Import/Assignment Export Wizard
    • Import File Field Mapper Page of the Integration Wizard
    • Enable a User to Access a Resource File
    • IPMR Format 2 Summary Page of the Report Wizard
    • Code Files
    • Resource Assignment Percent Complete Dialog Box
    • Rename Dialog Box
    • Reorder Resources
    • Preparing the Primavera Schedule
    • Date Selection Page of the Integration Wizard-MS Project
    • Action Selection Page of the Integration Wizard
    • Confirmation Page of the New Resource File Wizard
    • Resource Assignments Page of the Integration Wizard-Open Plan
    • Examples of Manual Forecast Calculations
    • Procedures
    • Baseline Tags
    • Perform Apportionment Mapping
    • Add a Child Resource to a Resource
    • Report Criterion Parameters
    • File Format for Importing Apportionment Mapping
    • Get Cobra Spread Process
    • Reorder Resources/Codes Dialog Box
    • Progress Techniques
    • Use a Code File in Multiple Projects
    • Validity Check Process
    • Enable a Group to Access a Resource File
    • Rename an Ancillary File
    • Spread Budgets Using Pre-defined Spread Methods
    • Create a New Resource File
    • Codes
    • Sub-Totals Page of the Report Wizard
    • Resource File Security
    • Calculations Tab of the Resource View
    • Process Complete Page of the Update Open Plan Resources Wizard
    • Variance Thresholds
    • Reporting
    • General Information Page of the New Project Wizard
    • Copy Down Code Assignments to Child Resources
    • Apportionment Definition Tab of the Resource View
    • Projects
    • Export and Import Time-Phased Resource Assignments
    • New Filter Expression Dialog Box of the Report Wizard
    • Project and Apportionment Validations Page of the Validity Check Wizard
    • Integration Configuration Page of the Integration Wizard
    • Integration Wizard
    • Access Control Tab of the Resource File Properties Dialog Box
    • Copy Child Resources to a Resource
    • Status Page of the Integration Wizard-Scheduling Tools
    • Date Selection Page of the Integration Wizard-Open Plan
    • Change Control Page of the Integration Wizard
    • Calculated Results
    • General Tab of the Application Preferences Dialog Box
    • Export Structures Page of the wInsight Wizard
    • Files Tab of the Project Properties Dialog Box
    • Results Page of the Integration Wizard
    • Field Mapper Page of the Integration Wizard
    • Add Calculations to a Resource
    • Sub-Projects Validation Dialog Box
    • EPM Security Administrator Functions
    • Resources and Rates Page of the Integration Wizard
    • Define Resource Apportionment
    • Project Selection Page of the Update Totals Wizard
    • Status Page of the Integration Wizard-Files
    • Integration Tab of the Application Preferences Dialog Box
    • Schedule Mapping Page of the Integration Wizard-Primavera
    • Prompt Level Page of the Project Audit Wizard
    • Ancillary File Validations Page of the Validity Check Wizard
    • General Information Page of the New Code File Wizard
    • Results Page of the Report Wizard
    • Reorder Resources/Codes Dialog Box
    • Select Configuration Page of the Update Open Plan Resources Wizard
    • Resources
    • Data Import-Ancillary Data
    • Examples of Forecast Calculations
    • Apportionment Setup Steps
    • Resource Assignments Page of the Integration Wizard-Files
    • Display the New Project Wizard
    • Resource-Loaded Schedule
    • Delete a Result from a Resource
    • Variance Thresholds
    • Required Template Files
    • Save As Dialog Box (Ancillary Files)
    • Manage Sorts Dialog Box of the Report Wizard
    • Calculate Progress
    • Add a Resource to a Resource File
    • Resource File Information Tags
    • Add a Resource Assignment
    • Import File Validation
    • File Selection Page of the Integration Wizard
    • Other Tab of the Application Preferences Dialog Box
    • Import Location Page of the Assignment Import Wizard
    • Project Selection Page of the Reclass Wizard
    • How Cobra Calculates Progress to Determine Earned Value
    • General Tab of the Resource File Properties Dialog Box
    • Progress Techniques
    • Order Resource Results Dialog Box
    • Copy Calculations from Another Resource
    • Open File Dialog Box
    • Open File Dialog Box
    • Delete a Resource from a Resource File
    • Code Fields Page of the New Resource File Wizard
    • Add Results to a Resource
    • How Cobra Spreads ETC
    • Integration Configuration Page of the Integration Wizard
    • Structure Tab of the Resource File Properties Dialog Box
    • Data Import Using Scheduling Tools and Files
    • XML Configuration File
    • Lookup Dialog Box
    • Assign a Rate Set to a Result
    • Sample Earned Value Calculation
    • Integration Configuration Page of the Integration Wizard
    • Preparing the Open Plan Schedule
    • Guidelines for Accurate Earned Value Management
    • Preparing Cobra for Schedule Integration
    • Thresholds Page of the New Resource File Wizard
    • Results Tab of the Resource File Properties Dialog Box
    • Resource Assignments
    • Forecast Calculations
    • Notes Tab of the Resource View
    • Template Resource Files
    • Purge Dialog Box
    • Import Budget Data into Cobra
    • Cobra Components
    • Log Change Comment Dialog Box
    • Open Plan Fields Imported
    • Data Anomaly Validations Page of the Validity Check Wizard
    • Resource Results Page of the New Resource File Wizard
    • Adjust Budget Spreads Manually
    • Thresholds Tab of the Resource File Properties Dialog Box
    • Integration Wizard Preferences
    • Plan Resource Information
    • Criteria Selection Page of the Recalc Wizard
    • Resources and Code Files
    • Element of Cost Page of the wInsight Wizard
    • Additional Project Files
    • New File Dialog Box
    • Spread Curve Dialog Box
    • Retain EAC
    • Resources Pane
    • Resource File Structure
    • Procedures
    • Examples of Statistical Forecast Calculations
    • Codes Page of the Integration Wizard-MS Project
    • Confirmation Page of the Replace Resources Wizard
    • Thresholds Tab of the Resource View
    • Earned Preferences
    • Resource View
    • Loading Resource Files from Open Plan
    • Project Selection Page of the Assignment Import/Assignment Export Wizard
    • Status Page of the Integration Wizard
    • Resource Calculation Tags
    • Resource Selection Page of the Replace Resources Wizard
    • Resources
    • Resource File Structure Page of the New Resource File Wizard
    • Criteria Page of the Reclass Wizard
    • Codes
    • Resource Tags
    • New File Dialog Box
    • Default Rates Page of the New Resource File Wizard
    • Copy Resource Calculations Dialog Box
    • Process Lock
    • Options Page of the Calculate Forecast Wizard
    • Process Logs Dialog Box
    • Update Totals Process
    • Resource-Loaded Schedule
    • Update Open Plan Resources
    • Loading Resource Files from Open Plan
    • Results Pane of the Analyze Form
    • Data Formats
    • Save As Dialog Box (Ancillary Files)
    • Resource Components
    • Shortcut Menu
    • Add Resource Results Dialog Box
    • Ancillary Files Page of the New Project Wizard
    • Status File Field Mapper Page of the Integration Wizard
    • Results or Field Names
    • Access Control Page of the New Resource File Wizard
    • Date Selection Page of the Integration Wizard-Primavera
    • Options Page of the ANSI EIA X12 Wizard
    • Manual Forecasts
    • Set Up Projects and Project Baselines
    • Fields Page of the New Project Wizard
  • resource apportionment
  • resource assignment
    • Spread Budgets Using Pre-defined Spread Methods
    • Spread Updated Budgets for Resources
    • Spread Dialog Box
    • Using Spread
    • Spread Curve Dialog Box
  • resource assignment percent complete dialog box
  • resource assignments page
  • resource edit tab
  • resource file
    • Performance Data Page of the wInsight Wizard
    • Import File Field Mapper Page of the Integration Wizard
    • Enable a User to Access a Resource File
    • Reorder Resources
    • Preparing the Primavera Schedule
    • Confirmation Page of the New Resource File Wizard
    • Add a Child Resource to a Resource
    • Report Criterion Parameters
    • File Format for Importing Apportionment Mapping
    • Reorder Resources/Codes Dialog Box
    • Validity Check Process
    • Enable a Group to Access a Resource File
    • Rename an Ancillary File
    • Create a New Resource File
    • Codes
    • Sub-Totals Page of the Report Wizard
    • Resource File Security
    • Calculations Tab of the Resource View
    • Variance Thresholds
    • General Information Page of the New Project Wizard
    • Copy Down Code Assignments to Child Resources
    • Apportionment Definition Tab of the Resource View
    • Projects
    • Project and Apportionment Validations Page of the Validity Check Wizard
    • Access Control Tab of the Resource File Properties Dialog Box
    • Copy Child Resources to a Resource
    • Files Tab of the Project Properties Dialog Box
    • Field Mapper Page of the Integration Wizard
    • Sub-Projects Validation Dialog Box
    • EPM Security Administrator Functions
    • Resources and Rates Page of the Integration Wizard
    • Integration Tab of the Application Preferences Dialog Box
    • Ancillary File Validations Page of the Validity Check Wizard
    • Results Page of the Report Wizard
    • Reorder Resources/Codes Dialog Box
    • Resources
    • Apportionment Setup Steps
    • Delete a Result from a Resource
    • Variance Thresholds
    • Required Template Files
    • Add a Resource to a Resource File
    • Resource File Information Tags
    • Other Tab of the Application Preferences Dialog Box
    • General Tab of the Resource File Properties Dialog Box
    • Order Resource Results Dialog Box
    • Delete a Resource from a Resource File
    • Code Fields Page of the New Resource File Wizard
    • Add Results to a Resource
    • Structure Tab of the Resource File Properties Dialog Box
    • XML Configuration File
    • Assign a Rate Set to a Result
    • Preparing the Open Plan Schedule
    • Preparing Cobra for Schedule Integration
    • Thresholds Page of the New Resource File Wizard
    • Results Tab of the Resource File Properties Dialog Box
    • Notes Tab of the Resource View
    • Template Resource Files
    • Purge Dialog Box
    • Resource Results Page of the New Resource File Wizard
    • Thresholds Tab of the Resource File Properties Dialog Box
    • Element of Cost Page of the wInsight Wizard
    • Additional Project Files
    • Resources Pane
    • Resource File Structure
    • Procedures
    • Thresholds Tab of the Resource View
    • Resource Calculation Tags
    • Resources
    • Resource File Structure Page of the New Resource File Wizard
    • Codes
    • Resource Tags
    • Default Rates Page of the New Resource File Wizard
    • Copy Resource Calculations Dialog Box
    • Results Pane of the Analyze Form
    • Resource Components
    • Shortcut Menu
    • Add Resource Results Dialog Box
    • Ancillary Files Page of the New Project Wizard
    • Access Control Page of the New Resource File Wizard
  • resource file properties
    • Code Fields Tab of the Resource File Properties Dialog Box
    • Display the Resource File Properties Dialog Box Tabs from an Open Resource File
    • Additional Information in Resources
    • Procedures
    • Display the Resource File Properties Dialog Box Tabs without Opening a Resource File
  • resource file properties dialog box
    • Resource File Properties Dialog Box
    • Thresholds Tab of the Resource File Properties Dialog Box
  • resource information
    • Process Complete Page of the Update Open Plan Resources Wizard
    • Integration Configuration Page of the Integration Wizard
    • Change Control Page of the Integration Wizard
    • Select Configuration Page of the Update Open Plan Resources Wizard
    • Resource-Loaded Schedule
    • Integration Configuration Page of the Integration Wizard
    • Integration Configuration Page of the Integration Wizard
    • Preparing Cobra for Schedule Integration
    • Open Plan Fields Imported
    • Resource-Loaded Schedule
    • Resource Components
  • resource result
    • Project and Apportionment Validations Page of the Validity Check Wizard
    • Ancillary File Validations Page of the Validity Check Wizard
    • Order Resource Results Dialog Box
    • Add Results to a Resource
    • Add Resource Results Dialog Box
  • resource view
    • Enable a User to Access a Resource File
    • Reorder Resources
    • Add a Child Resource to a Resource
    • Reorder Resources/Codes Dialog Box
    • Details Tab of the Resource View
    • Resource File Security
    • Resources Grid of the Resource View
    • Calculations Tab of the Resource View
    • Copy Down Code Assignments to Child Resources
    • Apportionment Definition Tab of the Resource View
    • Access Control Tab of the Resource File Properties Dialog Box
    • Copy Child Resources to a Resource
    • Add Calculations to a Resource
    • Assign Element of Cost to a Resource
    • Define Resource Apportionment
    • Copy Element of Cost Value to Child Resources
    • Reorder Resources/Codes Dialog Box
    • Delete a Result from a Resource
    • Add a Resource to a Resource File
    • General Tab of the Resource File Properties Dialog Box
    • Order Resource Results Dialog Box
    • Copy Calculations from Another Resource
    • Delete a Resource from a Resource File
    • Add Results to a Resource
    • Structure Tab of the Resource File Properties Dialog Box
    • Display the Resource View using the Resources Group Bar
    • Assign a Rate Set to a Result
    • Procedures
    • Results Tab of the Resource File Properties Dialog Box
    • Notes Tab of the Resource View
    • Display the Resource View using the Cobra Button
    • Thresholds Tab of the Resource View
    • Resource View
    • Copy Resource Calculations Dialog Box
    • Add Resource Results Dialog Box
    • Element of Cost
  • resources
    • Copy Down Threshold Values to Child Resources
    • Code the Resources for IPMR Format 2 Reports
    • Copy Down Codes Dialog Box
    • Define Costs for Resources
    • Copy Children Dialog Box
    • Copy Down Codes Dialog Box
    • Copy Children Dialog Box
    • Examples of Resources
  • resources grid
    • Resources Grid of the Resource View
    • Assign Element of Cost to a Resource
    • Copy Element of Cost Value to Child Resources
    • Delete a Result from a Resource
    • Order Resource Results Dialog Box
    • Delete a Resource from a Resource File
    • Add Results to a Resource
    • Assign a Rate Set to a Result
    • Procedures
    • Copy Resource Calculations Dialog Box
    • Shortcut Menu
    • Add Resource Results Dialog Box
    • Element of Cost
  • resources group bar
  • resources pane
    • Shortcut Menu
    • Resources Pane Column Definitions
  • respread
    • Date Range Page of the Respread Wizard
    • Options Page of the Respread Wizard
    • Respread the Budget
    • Process Running Page of the Respread Wizard
    • Project Selection Page of the Respread Wizard
    • Change Control Page of the Integration Wizard
    • When Calendar Dates Change
    • Supported Processes, Operations, and Data
    • Calendars
    • Criteria Selection Page of the Respread Wizard
    • Using Spread
    • Respread Wizard
    • Respread Process
    • Process Complete Page of the Respread Wizard
    • Respread
    • Recalc
    • Procedures
    • Confirmation Page of the Respread Wizard
    • Cobra Web Service
    • Process Logs Dialog Box
    • Classes Page of the Respread Wizard
    • Resource Components
  • respread wizard
    • Date Range Page of the Respread Wizard
    • Options Page of the Respread Wizard
    • Respread the Budget
    • Process Running Page of the Respread Wizard
    • Project Selection Page of the Respread Wizard
    • Criteria Selection Page of the Respread Wizard
    • Respread Wizard
    • Process Complete Page of the Respread Wizard
    • Respread
    • Procedures
    • Confirmation Page of the Respread Wizard
    • Classes Page of the Respread Wizard
  • restoration
    • File Restore
    • Restore Data from a Backup File
  • restore
    • Restoring Reports and Configurations
    • Restore Process
    • File Restore
    • Restore Dialog Box
    • Restore Dialog Box
  • restore utility
  • result
    • Data Tool
    • Performance Data Page of the wInsight Wizard
    • Resource Assignments Page of the Assignment Import/Assignment Export Wizard
    • Milestones/Steps
    • Import File Field Mapper Page of the Integration Wizard
    • Insert Column Dialog Box
    • Data Access Tab of the Application Preferences Dialog Box
    • Code Files
    • Resource Assignment Percent Complete Dialog Box
    • Progress Page of the Integration Wizard-Scheduling Tools
    • Analyze Preferences
    • First Result and Derived Costs
    • Preparing the Primavera Schedule
    • Create Graph Reports from the Analyze Form
    • Results Page of the ANSI EIA X12 Wizard
    • Examples of Manual Forecast Calculations
    • Get Cobra Spread Process
    • Use a Code File in Multiple Projects
    • Validity Check Process
    • Analyze Options Dialog Box
    • Sub-Totals Page of the Report Wizard
    • Class and Results Page of the Integration Wizard
    • Calculations Tab of the Resource View
    • Apportionment Definition Tab of the Resource View
    • Project and Apportionment Validations Page of the Validity Check Wizard
    • Calculated Results
    • Edit Comment and Change Number Page of the Project Audit Wizard
    • General Tab of the Application Preferences Dialog Box
    • The Field Mapper
    • Statistical Forecasts
    • Results Page of the Integration Wizard
    • Field Mapper Page of the Integration Wizard
    • Integration Tab of the Application Preferences Dialog Box
    • Schedule Mapping Page of the Integration Wizard-Primavera
    • Ancillary File Validations Page of the Validity Check Wizard
    • Results Page of the Report Wizard
    • Resources
    • Data Import-Ancillary Data
    • Examples of Forecast Calculations
    • Open Dialog Box of the Calculated Results Wizard
    • Apportionment Setup Steps
    • Resource-Loaded Schedule
    • Delete a Result from a Resource
    • Cost Sets Page of the Report Wizard
    • Resource File Information Tags
    • General Tab of the Classes Tab
    • Import File Validation
    • Classes Tab of the Project Properties Dialog Box
    • How Cobra Calculates Progress to Determine Earned Value
    • Custom Cost Classes
    • Order Resource Results Dialog Box
    • Add Results to a Resource
    • How Cobra Spreads ETC
    • Target Class Page of the Reclass Wizard
    • Assign a Rate Set to a Result
    • Sample Earned Value Calculation
    • Preparing the Open Plan Schedule
    • Guidelines for Accurate Earned Value Management
    • Preparing Cobra for Schedule Integration
    • Results Tab of the Resource File Properties Dialog Box
    • Resource Assignments
    • Forecast Calculations
    • Template Resource Files
    • Log Change Comment Dialog Box
    • Running the Process or Operation
    • Copy Calculated Result Dialog Box of the Calculated Results Wizard
    • Adjust Budget Spreads Manually
    • Run the SQL Command Utility
    • Copy Project Process
    • Element of Cost Page of the wInsight Wizard
    • Frozen Forecasts
    • Edit Column Dialog Box
    • Schedule Mapping Page of the Integration Wizard-Open Plan
    • Examples of Statistical Forecast Calculations
    • Earned Preferences
    • Considerations When Creating Field Names
    • Resource Calculation Tags
    • Resources
    • Default Rates Page of the New Resource File Wizard
    • Copy Resource Calculations Dialog Box
    • Update Totals Process
    • Resource-Loaded Schedule
    • Results Pane of the Analyze Form
    • Data Formats
    • Resource Components
    • Options Page of the Advance Calendar Wizard
    • Column Reports
    • Shortcut Menu
    • Add Resource Results Dialog Box
    • Time-phased Reports
    • Results or Field Names
    • Options Page of the ANSI EIA X12 Wizard
    • Manual Forecasts
    • Set Up Projects and Project Baselines
    • Reconcile Milestone Weight Variance Dialog Box
  • results page
    • Results Page of the ANSI EIA X12 Wizard
    • Class and Results Page of the Integration Wizard
    • Results Page of the Integration Wizard
    • Results Page of the Report Wizard
  • ribbon
    • Edit Tab of the Rate View
    • Processes Tab
    • Preferences
    • Edit Tab of the Calendar View
    • Cobra Button
    • Manage
    • Custom Menu Tab
    • Cobra Explorer
    • Tools Tab
    • Edit Tab of the Code View
    • Help
    • Edit Tab of the Resource View
    • Reporting Tab
    • Integration Tab
    • Edit Tab of the Project View
  • rolling wave
    • Progressing
    • Process Complete Page of the Rolling Wave Wizard
    • Calendar Definition
    • Process Running Page of the Rolling Wave Wizard
    • Project Selection Page of the Rolling Wave Wizard
    • Options Page of the Rolling Wave Wizard
    • Rolling Wave
    • Supported Processes, Operations, and Data
    • Rolling Wave Dialog Box of the Project Properties Dialog Box
    • Assign a Rolling Wave Calendar to the Project
    • Create a Rolling Wave Calendar
    • Effect of Running the Process
    • Confirmation Page of the Rolling Wave Wizard
    • Rolling Wave Process
    • Rolling Wave Wizard
    • Procedures
    • Rolling Wave Process or Weekly Earned Value
    • Cobra Web Service
    • Run the Rolling Wave Process
  • rolling wave calendar
  • rolling wave process
    • Calendars
    • Run the Rolling Wave Process Without Advancing the Calendar
    • Run the Rolling Wave Process Without Advancing the Calendar
    • Advance Calendar Process
    • Calendar Sets
    • Options Page of the Advance Calendar Wizard
    • Ancillary Files Page of the New Project Wizard
  • rolling wave wizard
    • Process Complete Page of the Rolling Wave Wizard
    • Calendar Definition
    • Process Running Page of the Rolling Wave Wizard
    • Project Selection Page of the Rolling Wave Wizard
    • Options Page of the Rolling Wave Wizard
    • Rolling Wave
    • Assign a Rolling Wave Calendar to the Project
    • Create a Rolling Wave Calendar
    • Confirmation Page of the Rolling Wave Wizard
    • Rolling Wave Wizard
    • Procedures
    • Run the Rolling Wave Process
  • rules
  • save and load page
    • Save and Load Page of the Integration Wizard
    • Save and Load Page of the Integration Wizard
  • save and run page
    • Confirmation Page of the Report Wizard
    • Access Control Page of the Report Wizard
    • Save and Run Page of the Cost Data Wizard
  • save as dialog box
    • Display the Save As Dialog Box (Ancillary Files)
    • Display the Save As Dialog Box (Projects)
    • Display the Save As Dialog Box (Projects)
    • Display the Save As Dialog Box (Ancillary Files)
  • save view
    • Manage Views Dialog Box
    • Manage Views
    • Save Current View As Dialog Box
    • Save and Share View
    • Modify an Existing View
    • Create a View
    • Select Dialog Box
  • scale factor
    • Report Template Format
    • Miscellaneous Page of the wInsight Wizard
    • Style Page of the Report Wizard
  • scaling
  • schedule
  • schedule integration
    • Preparing Cobra for Schedule Integration
    • Process Lock
  • scheduling data
    • Edit Connection Dialog Box of the Integration Wizard-Primavera
    • New Connection Dialog Box of the Integration Wizard-MS Project
    • Preparing Cobra for Schedule Integration
    • Customization of Integration Process
    • New Connection Dialog Box of the Integration Wizard-Primavera
    • Edit Connection Dialog Box of the Integration Wizard-MS Project
    • Customization of Processes
  • scheduling tool
    • Action Selection Page of the Integration Wizard
    • Integration Configuration Page of the Integration Wizard
    • Schedule Mapping Page of the Integration Wizard-Primavera
    • Integration Configuration Page of the Integration Wizard
    • Data Import Using Scheduling Tools and Files
    • Integration Configuration Page of the Integration Wizard
    • Integration Wizard-Scheduling Tools and Files
    • Schedule Mapping Page of the Integration Wizard-Open Plan
    • Cobra 8.4 Help System
  • scheduling tools
    • Change Control Page of the Integration Wizard
    • Process Complete Page of the Integration Wizard
    • Save and Load Page of the Integration Wizard
    • Process Running Page of the Integration Wizard
    • Access Control Page of the Integration Wizard
    • Confirmation Page of the Integration Wizard
  • scrip file
  • script file
    • Create Windows Shortcut for the API Script
    • Calculate Progress Process
    • Initialize Forecast Process
    • Delete Project Process
    • Restore Process
    • Batch Report Process
    • Get Cobra Spread Process
    • Cost Data Export Process
    • Validity Check Process
    • Calculate Forecast Process
    • Backup Project Process
    • Integrate Ancillary Data Process
    • Create Project from Template Process
    • SQL Command Process
    • Apportionment Process
    • Integrate Actual Costs Process
    • Reclass Process
    • Respread Process
    • Reconcile Log Process
    • Rolling Wave Process
    • wInsight Export Process
    • Integrate Project Data Process
    • Copy Project Process
    • Integrate Apportionment Mapping Process
    • Set Project Baseline Process
    • Update Tphase Process
    • Advance Calendar Process
    • Integrate Apportionment Definition Process
    • Update Totals Process
    • ANSI EIA X12 Process
    • Replace Resources Process
    • Recalculate Process
  • security
    • Configuration Security
    • Enable a User to Access a Resource File
    • Change Owner Dialog Box
    • Save and Load Page of the Integration Wizard
    • Access Control Tab of the Calendar File Properties Dialog Box
    • SQL Command Utility
    • Delete Project Process
    • Enable a Group to Access a Resource File
    • Project Codes Tab of the Application Preferences Dialog Box
    • Codes
    • Resource File Security
    • Merge Sub-Projects into a New Project
    • Apportionment Definition Tab of the Resource View
    • Projects
    • Send a Message to Users
    • Access Control Tab of the Resource File Properties Dialog Box
    • Access Control Tab of the Code File Properties Dialog Box
    • Terminate a Session
    • Code Fields Page of the New Code File Wizard
    • Merge Sub-Projects into a New Project
    • Procedures
    • EPM Security Administrator Functions
    • Enable a Group to Access a Code File
    • Security Options for the Analyze Process
    • Enable a Group to Access a Rate File
    • Calendar File Security
    • Display the Change Ownership and Access Rights Dialog Box
    • Access Control
    • Set a Maximum Number of Login Tries
    • Display the New Project Wizard
    • Access Control Page of the New Code File Wizard
    • Access Control Page of the Report Wizard
    • Code Fields Page of the New Resource File Wizard
    • Disable Logins
    • Display the Change Owner Dialog Box
    • Procedures
    • Modify the Cobra.Api.Exe.Config File in the Workstation Folder
    • Change Ownership and Access Rights
    • Enable a User to Access a Code File
    • Change Ownership and Access Rights Dialog Box
    • Access Control Tab of the Edit Batch Report Dialog Box
    • Log Operation Page of the Project Audit Wizard
    • Contract Information Tab of the Project Properties Dialog Box
    • Display a Login Message
    • Display the Change Ownership and Access Rights Dialog Box
    • Change Ownership and Access Rights Dialog Box
    • Change the Owner of an Object
    • Access Control Page of the New Project Wizard
    • Procedures
    • Enable a User to Access a Calendar File
    • Procedures
    • Configuration Security Dialog Box
    • Enable a Group to Access a Calendar File
    • Additional Project Files
    • Rate File Security
    • Code File Security
    • Custom Menu Items
    • Change Access Rights Dialog Box
    • Cobra 8.4 Help System
    • Set Maximum Time of Inactivity
    • Run the EPM Security Administrator
    • Security
    • Enable a User to Access a Rate File
    • Turn Windows Authentication On or Off
    • Access Control Tab of the Project Properties Dialog Box
    • Codes
    • Access Control Page of the New Resource File Wizard
    • Change the Access Rights of an Object
    • Fields Page of the New Project Wizard
  • select files to restore dialog box
  • send message
  • sessions
  • set project baseline
  • set todate period
    • Set the TODATE Period
    • Extend the Calendar Periods
  • share view
    • Manage Views Dialog Box
    • Manage Views
    • Save Current View As Dialog Box
    • Save and Share View
    • Modify an Existing View
    • Create a View
    • Select Dialog Box
  • shortcut
  • shortcut menu
    • Shortcut Menu
    • Shortcut Menu
    • Analyze Edit Tab
    • Shortcut Menu
    • Shortcut Menu
    • Shortcut Menu
    • Shortcut Menu
    • Shortcut Menu
    • Shortcut Menu
    • Shortcut Menu
    • Shortcut Menu
  • shutdown
  • significant
    • Code Files
    • Preparing the Primavera Schedule
    • Baseline Tags
    • Structure Tab of the Code File Properties Dialog Box
    • Copy Child Resources to a Resource
    • Edit Comment and Change Number Page of the Project Audit Wizard
    • General Information Page of the New Code File Wizard
    • Preparing the Open Plan Schedule
    • Preparing Cobra for Schedule Integration
    • Log Change Comment Dialog Box
    • Code File Structure Page of the New Code File Wizard
    • Code File Structures
    • Loading Resource Files from Open Plan
    • Resource File Structure Page of the New Resource File Wizard
    • Loading Resource Files from Open Plan
  • significant change
    • Baseline Tags
    • Edit Comment and Change Number Page of the Project Audit Wizard
    • Log Change Comment Dialog Box
  • slip
    • Criteria Page of the Slip Wizard
    • Confirmation Page of the Slip Wizard
    • Slip By Page of the Slip Wizard
    • Procedures
    • Process Running Page of the Slip Wizard
    • Slip Wizard
    • Slip a Project
    • Slip
    • Process Complete Page of the Slip Wizard
    • Project Selection Page of the Slip Wizard
  • slip wizard
    • Criteria Page of the Slip Wizard
    • Confirmation Page of the Slip Wizard
    • Slip By Page of the Slip Wizard
    • Procedures
    • Process Running Page of the Slip Wizard
    • Slip Wizard
    • Slip a Project
    • Slip
    • Process Complete Page of the Slip Wizard
    • Project Selection Page of the Slip Wizard
  • sorts
    • Filters
    • Apply a Filter to a Column in the Spreadsheet Pane
    • Standard Filter Dialog Box
    • File Backup
    • Advanced Filter Dialog Box
  • source class
  • spread
    • Add Spread Curve Dialog Box
    • Spread Updated Budgets for Resources
    • Spread Dialog Box
    • Using Spread
  • spread curve
    • Application Preferences
    • Spread Curves Tab of the Application Preferences Dialog Box
    • Get Cobra Spread Process
    • Spread Budgets Using Pre-defined Spread Methods
    • Resource Assignments Page of the Integration Wizard-Files
    • Spread Dialog Box
    • Add a Resource Assignment
    • Using Spread
    • Preparing the Open Plan Schedule
    • Respread
    • Spread Curve Dialog Box
    • Options Page of the Calculate Forecast Wizard
  • spreadsheet pane
    • Rename Work Package Dialog Box
    • Assign a Progress Technique to a Work Package
    • Add Work Package Dialog Box
    • Copy and Paste in the Project View
    • Rename a Work Package
    • Copy Work Package Dialog Box
    • Spreadsheet Pane of the Project View
    • Copy Control Account Dialog Box
    • Save the Contents of the Spreadsheet Pane as an Excel File
    • Standard Filter Dialog Box
    • Export and Import Time-Phased Resource Assignments
    • Delete Milestones or Steps
    • Add a New Work Package using the Dialog Box
    • Add Control Account Dialog Box
    • Rename Control Account Dialog Box
    • Update EAC Dialog Box
    • Add a New Control Account Manually
    • Spreadsheet Pane Column Definitions
    • Add Resource Assignment Dialog Box
    • Spread Dialog Box
    • Process Complete Page of the Assignment Import/Assignment Export Wizard
    • Copy a Work Package
    • Add a Resource Assignment
    • Import Location Page of the Assignment Import Wizard
    • Project View
    • Add a New Work Package Manually
    • Using Spread
    • Move a Work Package
    • Move a Control Account
    • Rename a Control Account
    • Move Work Package Dialog Box
    • Procedures
    • Add a New Control Account using the Dialog Box
    • Add Milestones or Steps
    • Reconcile Milestone Weights
    • Shortcut Menu
    • Advanced Filter Dialog Box
    • Update Totals Process
    • Using the Find Function
    • Modify Milestones or Steps
    • Additional User Fields
    • Manual Forecasts
    • Reconcile Milestone Weight Variance Dialog Box
  • sql command utility
    • Procedures
    • SQL Command Utility
    • SQL Command Utility Supported Parameters
    • SQL Command Process
    • Run the SQL Command Utility
    • SQL Language Extended Support
  • ssl
    • Configure the Cobra Web Service Instances and/or Gateway using Cobra Web Service Management Tool
    • Configuring the Cobra Web Service to Use Secure Socket Layers
    • Bind the Windows Server Certificate to the Cobra Web Service HTTPS Ports
    • Obtain the Authentication Certificate Information on the Cobra Web Service Machines
  • standard dialog box
  • status
    • Confirmation Page of the Integration Wizard
    • Progressing
    • Process Running Page of the Apportionment Calculation Wizard
    • Process Running Page of the Reclass Wizard
    • Save and Load Page of the Integration Wizard
    • Code Files
    • Process Running Page of the wInsight Wizard
    • Preparing the Primavera Schedule
    • Report Template Format
    • Project Selection Page of the Advance Calendar Wizard
    • Action Selection Page of the Integration Wizard
    • Resource Assignments Page of the Integration Wizard-Open Plan
    • Examples of Manual Forecast Calculations
    • Spreadsheet Pane of the Project View
    • Process Running Page of the Project Audit Wizard
    • Explanation of Variance Narrative Tags
    • Process Running Page of the Advance Calendar Wizard
    • Process Running Page of the Calculate Forecast Wizard
    • Process Running Page of the Replan Wizard
    • Progress Techniques
    • Advance to Period Page of the Advance Calendar Wizard
    • Process Complete Page of the Export Calendar to Open Plan Wizard
    • Process Complete Page of the Update Open Plan Resources Wizard
    • Actual Costs Preferences
    • Process Running Page of the Export Calendar to Open Plan Wizard
    • Replan Preferences
    • Integration Configuration Page of the Integration Wizard
    • Status Page of the Integration Wizard-Scheduling Tools
    • Process Complete Page of the Project Audit Wizard
    • Change Control Page of the Integration Wizard
    • Edit Comment and Change Number Page of the Project Audit Wizard
    • The Field Mapper
    • Statistical Forecasts
    • Process Complete Page of the ANSI EIA X12 Wizard
    • Field Mapper Page of the Integration Wizard
    • Sub-Projects Validation Dialog Box
    • EPM Security Administrator Functions
    • Project Selection Page of the Calculate Forecast Wizard
    • Status Page of the Integration Wizard-Files
    • Recalc Preferences
    • Import File Preparation
    • Ancillary File Validations Page of the Validity Check Wizard
    • File Format for Importing Status Information
    • Spreadsheet Pane Column Definitions
    • Entering Actual Costs
    • Project Dates Page of the New Project Wizard
    • Process Running Page of the Validity Check Wizard
    • Examples of Forecast Calculations
    • Apportionment Setup Steps
    • Miscellaneous Page of the wInsight Wizard
    • Resource Assignments Page of the Integration Wizard-Files
    • Resource-Loaded Schedule
    • Calendars
    • Calculate Progress
    • Import File Validation
    • Process Running Page of the Slip Wizard
    • Process Running Page of the Calculate Progress Wizard
    • How Cobra Calculates Progress to Determine Earned Value
    • Progress Techniques
    • Custom Cost Classes
    • Multiproject Operations (Master and Subprojects)
    • Apportionment Process
    • Process Running Page of the Export Calendar to Open Plan Wizard
    • Milestone Tags
    • Data Import-Status Data
    • How Cobra Spreads ETC
    • Integration Configuration Page of the Integration Wizard
    • Data Import Using Scheduling Tools and Files
    • Process Running Page of the ANSI EIA X12 Wizard
    • Integration Configuration Page of the Integration Wizard
    • Advance Calendar
    • Entering Actual Costs Using an Import File
    • Guidelines for Accurate Earned Value Management
    • Forecast Calculations
    • Running the Process or Operation
    • Process Running Page of the Freeze Forecast Wizard
    • Reclass Preferences
    • Integration Wizard-Actual Costs
    • File Selection Page of the Integration Wizard
    • Confirmation Page of the Advance Calendar Wizard
    • Log Significant Changes for IPMR Format 3 Reports
    • wInsight Database Page of the wInsight Wizard
    • Database Table Selection Page of the Integration Wizard
    • Integration Wizard Preferences
    • Recalc
    • Options Page of the Replan Wizard
    • Examples of Statistical Forecast Calculations
    • Access Control Page of the Integration Wizard
    • Project Selection Page of the Calculate Progress Wizard
    • Process Complete Page of the Validity Check Wizard
    • Status Page of the Integration Wizard
    • Import Status Data into Cobra
    • Advance Calendar Process
    • Milestones/Steps Tab of the Project View
    • Options Page of the Calculate Forecast Wizard
    • Process Complete Page of the wInsight Wizard
    • Entering Actual Costs Manually
    • Resource-Loaded Schedule
    • Date Range Page of the Recalc Wizard
    • Calendar Sets
    • Options Page of the Advance Calendar Wizard
    • Column Reports
    • Ancillary Files Page of the New Project Wizard
    • Status File Field Mapper Page of the Integration Wizard
    • Process Complete Page of the Report Wizard
    • Included Costs Page of the Integration Wizard
    • Options Page of the Integration Wizard
    • Manual Forecasts
    • Set Up Projects and Project Baselines
  • structure tab
    • Structure Tab of the Code File Properties Dialog Box
    • Structure Tab of the Resource File Properties Dialog Box
  • subprojects
    • Merge Sub-Projects into a New Project
    • Remove Sub-Projects from a Master Project
    • Sub-Projects Validation Dialog Box
    • Merge Sub-Projects into a New Project
    • Procedures
    • Remove Sub-Projects from a Master Project
    • Assign Sub-Projects to a Master Project
    • Merging a Master Project's Subprojects to Create a New Project
    • Multiproject Operations (Master and Subprojects)
    • Validate Sub-Projects
    • Validate Sub-Projects
    • Sub-Projects Page of the New Project Wizard
    • Multiproject Guidelines
    • Assign Sub-Projects to a Master Project
    • Create a Master Project
  • tab
  • tabbed pane
    • Project View
    • Tabbed Pane of the Project View
  • target class
  • template
    • Application Preferences
    • Progress Page of the Integration Wizard-Scheduling Tools
    • Analyze Preferences
    • Preparing the Primavera Schedule
    • Report Template Format
    • Settings Page of the New Project Wizard
    • Resource Assignments Page of the Integration Wizard-Open Plan
    • Analyze Options Dialog Box
    • Resources and Rates Page of the Integration Wizard
    • Schedule Mapping Page of the Integration Wizard-Primavera
    • Resources
    • Resource Assignments Page of the Integration Wizard-Files
    • Required Template Files
    • Create Project from Template Process
    • XML Configuration File
    • Preparing the Open Plan Schedule
    • Preparing Cobra for Schedule Integration
    • Template Resource Files
    • Additional Project Files
    • Schedule Mapping Page of the Integration Wizard-Open Plan
    • Resources
    • Style Page of the Report Wizard
    • Application Settings
    • Report Templates
  • terminal service
  • terminated automatically
    • Set a Maximum Number of Login Tries
    • Set Maximum Time of Inactivity
    • Turn Windows Authentication On or Off
  • thresholds page
    • Thresholds Page of the New Code File Wizard
    • Thresholds Page of the New Resource File Wizard
  • thresholds tab
    • Thresholds Tab of the Code File Properties Dialog Box
    • Thresholds Tab of the Code View
    • Code View
    • Thresholds Tab of the Resource File Properties Dialog Box
    • Thresholds Tab of the Resource View
  • time phase detail pane
    • Copy and Paste in the Project View
    • Procedures
    • Spread Updated Budgets for Resources
    • Spread Dialog Box
    • Project View
    • Using Spread
    • Data Entry in the Time-phase Pane
    • Time-phase Detail Pane of the Project View
    • Spread Curve Dialog Box
  • time phase pane
    • Time-phase Pane of the Project View
    • Copy and Paste in the Project View
    • Spread Budgets Using Pre-defined Spread Methods
    • Supported Processes, Operations, and Data
    • Spread Updated Budgets for Resources
    • Add Resource Assignment Dialog Box
    • Spread Dialog Box
    • Project View
    • Using Spread
    • Data Entry in the Time-phase Pane
    • Spread Curve Dialog Box
    • Cobra Web Service
    • Time-phase Pane Field Descriptions
  • todate
    • Set the TODATE Period
    • Extend the Calendar Periods
  • tools tab
    • Keyboard Shortcuts
    • Tools Tab
  • top down planning
    • Top-Down Planning
    • Process Running Page of the Top-Down Planning Wizard
    • Confirmation Page of the Top-Down Planning Wizard
    • Procedures
    • Perform Top-Down Planning
    • Top-Down Planning Wizard
    • Results Page of the Top-Down Planning Wizard
    • Classes Page of the Top-Down Planning Wizard
    • Calculation Page of the Top-Down Planning Wizard
    • Project Selection Page of the Top-Down Planning Wizard
    • Process Complete Page of the Top-Down Planning Wizard
    • Criteria Selection Page of the Top-Down Planning Wizard
  • top down planning wizard
    • Top-Down Planning
    • Process Running Page of the Top-Down Planning Wizard
    • Confirmation Page of the Top-Down Planning Wizard
    • Procedures
    • Perform Top-Down Planning
    • Top-Down Planning Wizard
    • Results Page of the Top-Down Planning Wizard
    • Classes Page of the Top-Down Planning Wizard
    • Calculation Page of the Top-Down Planning Wizard
    • Project Selection Page of the Top-Down Planning Wizard
    • Process Complete Page of the Top-Down Planning Wizard
    • Criteria Selection Page of the Top-Down Planning Wizard
  • total row
  • troubleshooting
    • The server was unable to process the request due to an internal error
    • There was no endpoint listening at http://:/CobraWebService/service that could accept the message
    • The encryption type requested is not supported by the KDC
    • Troubleshoot Oracle Error ORA-600 [kkqcscpcky:ficand] While Running Query with Parameter "_replace_virtual_columns=false"
    • The server was unable to process the request due to an internal error
    • The server was unable to process the request due to an internal error
    • The encryption type requested is not supported by the KDC
    • Troubleshooting Concurrency Issues
    • Update the "_replace_virtual_columns" Setting
    • There was no endpoint listening at http://:/CobraWebService/service that could accept the message
    • There was no endpoint listening at http://:/CobraWebService/service that could accept the message
    • The encryption type requested is not supported by the KDC
    • Troubleshooting Concurrency Issues
    • There was no endpoint listening at http://:/CobraWebService/service that could accept the message
    • The server was unable to process the request due to an internal error
    • Troubleshooting Concurrency Issues
    • Troubleshooting Concurrency Issues
    • The encryption type requested is not supported by the KDC
    • The encryption type requested is not supported by the KDC
  • update codes
    • Update the Code Fields
    • Confirmation Page of the Update Codes Wizard
    • Update Code Page of the Update Codes Wizard
    • Update Codes
    • Update Codes Wizard
    • Process Running Page of the Update Codes Wizard
    • Project Selection Page of the Update Codes Wizard
    • Criteria Selection Page of the Update Codes Wizard
    • Procedures
    • Process Complete Page of the Update Codes Wizard
  • update codes wizard
    • Update the Code Fields
    • Confirmation Page of the Update Codes Wizard
    • Update Code Page of the Update Codes Wizard
    • Update Codes
    • Update Codes Wizard
    • Process Running Page of the Update Codes Wizard
    • Project Selection Page of the Update Codes Wizard
    • Criteria Selection Page of the Update Codes Wizard
    • Procedures
    • Process Complete Page of the Update Codes Wizard
  • update forecast dialog box
  • update op resources wizard
    • Process Complete Page of the Update Open Plan Resources Wizard
    • Criteria Page of the Update Open Plan Resources Wizard
    • Procedures
    • Select Configuration Page of the Update Open Plan Resources Wizard
    • Update Open Plan Resources
    • Update Open Plan Resources Wizard
    • Confirmation Page of the Update Open Plan Resources Wizard
    • Update Open Plan Resources
    • General Information Page of the Update Open Plan Resources Wizard
  • update totals
    • Initialize Forecast Process
    • Spreadsheet Pane of the Project View
    • Procedures
    • Confirmation Page of the Update Totals Wizard
    • Project Selection Page of the Update Totals Wizard
    • Supported Processes, Operations, and Data
    • Spreadsheet Pane Column Definitions
    • Update Totals Wizard
    • Apportionment Process
    • Update Totals
    • Running the Process or Operation
    • Process Running Page of the Update Totals Wizard
    • Process Complete Page of the Update Totals Wizard
    • Cobra Web Service
    • Process Lock
    • Process Logs Dialog Box
    • Update Totals Process
    • Update Totals
  • update totals wizard
    • Procedures
    • Confirmation Page of the Update Totals Wizard
    • Project Selection Page of the Update Totals Wizard
    • Update Totals Wizard
    • Update Totals
    • Process Running Page of the Update Totals Wizard
    • Process Complete Page of the Update Totals Wizard
    • Update Totals
  • user fields
    • Configure Cobra to Support Additional User Fields
    • Additional User Fields
  • user preferences
    • User Preferences
    • Set the Date Format
    • User Preferences Dialog Box
  • user preferences dialog box
  • validity check
    • Business Validations Page of the Validity Check Wizard
    • Validity Check Wizard
    • Project and Apportionment Validations Page of the Validity Check Wizard
    • Ancillary File Validations Page of the Validity Check Wizard
    • Process Running Page of the Validity Check Wizard
    • Validations Page of the Validity Check Wizard
    • Resource and Code Assignment Validations Page of the Validity Check Wizard
    • Data Anomaly Validations Page of the Validity Check Wizard
    • Perform a Validity Check
    • Validity Check
    • Confirmation Page of the Validity Check Wizard
    • Procedures
    • Project Selection Page of the Validity Check Wizard
  • validity check wizard
    • Business Validations Page of the Validity Check Wizard
    • Validity Check Wizard
    • Project and Apportionment Validations Page of the Validity Check Wizard
    • Ancillary File Validations Page of the Validity Check Wizard
    • Process Running Page of the Validity Check Wizard
    • Validations Page of the Validity Check Wizard
    • Resource and Code Assignment Validations Page of the Validity Check Wizard
    • Data Anomaly Validations Page of the Validity Check Wizard
    • Perform a Validity Check
    • Validity Check
    • Process Complete Page of the Validity Check Wizard
    • Confirmation Page of the Validity Check Wizard
    • Procedures
    • Project Selection Page of the Validity Check Wizard
  • vfp
  • view
    • Manage Views Dialog Box
    • Manage Views
    • Save Current View As Dialog Box
    • Save and Share View
    • Modify an Existing View
    • Create a View
    • Select Dialog Box
  • web service
    • The server was unable to process the request due to an internal error
    • Data Access Tab of the Application Preferences Dialog Box
    • There was no endpoint listening at http://:/CobraWebService/service that could accept the message
    • Explaining the Cobra Web Service ClientAPI
    • Other Distribution Files
    • Terminate a Session
    • General Tab of the Application Preferences Dialog Box
    • The server was unable to process the request due to an internal error
    • Integration Tab of the Application Preferences Dialog Box
    • Retrieving Data
    • Supported Processes, Operations, and Data
    • The server was unable to process the request due to an internal error
    • Deploying the Cobra Web Service
    • Logging Out of the Cobra Web Service Host
    • Connecting to the Cobra Web Service Host
    • There was no endpoint listening at http://:/CobraWebService/service that could accept the message
    • There was no endpoint listening at http://:/CobraWebService/service that could accept the message
    • Running the Process or Operation
    • Creating Service Operations Classes
    • There was no endpoint listening at http://:/CobraWebService/service that could accept the message
    • The server was unable to process the request due to an internal error
    • Cobra 8.4 Help System
    • Add the ClientAPI Files as Reference in Visual Studio Projects
    • Cobra Web Service
    • Reports Tab of the Application Preferences Dialog Box
  • windows authentication
    • Deploy Configuration Files for Windows Authentication with a New Installation
    • Windows Authentication
    • Configure Windows Authentication in an N-Tier Deployment
    • Windows Domain and User Name Authentication Plus Role Authentication
    • Configure Windows Authentication in an N-Tier Deployment
    • Procedures
    • Set a Maximum Number of Login Tries
    • Edit the Ideablade.Ibconfig file in the Workstation Folder (netTcpBinding)
    • Modify the Cobra.WinUI.Exe.Config File in the Workstation Folder (netTcpBinding Message Level)
    • Modify the Cobra.WinUI.Exe.Config File in the Workstation Folder
    • Connecting to the Cobra Web Service Host
    • netTcpBinding Configuration
    • Configure the Service Parameters (netTcpBinding Transport Level)
    • Modify the Cobra.Api.Exe.Config File in the Workstation Folder
    • Configuring Windows Authentication Using the Configuration Files
    • Edit the Ideablade.Ibconfig file in the Server Folder
    • Procedures
    • Configure Windows Authentication in an N-Tier Deployment
    • Edit the Ideablade.Ibconfig file in the Cobra Folder
    • Modify the Cobra.Api.Exe.Config File in the Workstation Folder (netTcpBinding Message Level)
    • Modify the Cobra.Api.Exe.Config File in the Workstation Folder (netTcpBinding Transport Level)
    • Configure Windows Authentication in an N-Tier Deployment
    • Modify the Cobra.WinUI.Exe.Config File in the Workstation Folder (netTcpBinding Transport Level)
    • netTcpBinding Transport Level Authentication
    • Set Maximum Time of Inactivity
    • Edit the Ideablade.Ibconfig file in the Server Folder (netTcpBinding)
    • Edit the Ideablade.Ibconfig file in the Workstation Folder
    • Configure the Service Parameters (wsHttpBinding)
    • Procedures
    • Turn Windows Authentication On or Off
    • Procedures
    • netTcpBinding Message Level Authentication
    • Edit the Ideablade.Ibconfig file in the Server Folder (netTcpBinding)
    • Modify the Cobra.WinUI.Exe.Config File in the Cobra Folder
    • Procedures
    • Procedures
    • Edit the Ideablade.Ibconfig file in the Workstation Folder (netTcpBinding)
    • Deploy Configuration Files for Windows Authentication with an Upgrade Installation
    • wsHttpBinding Configuration
    • Configure the Service Parameters (netTcpBinding Message Level)
  • wInsight
  • wInsight data export
    • Narrative Export Process
    • wInsight Wizard
    • Cobra to wInsight Data Export
  • wInsight database page
  • wInsight export
    • ElemLinks Section of the XML File
    • Contractors Section of the XML File
    • Calendars Section of the XML File
    • Contracts Section of the XML File
    • Supported Processes, Operations, and Data
    • NarrElemPers Section of the XML File
    • Elements Section of the XML File
    • CalendarDets Section of the XML File
    • wInsight Export Process
    • ACL Section of the XML File
    • Periods Section of the XML File
    • Cobra Web Service
    • Columns Section of the XML File
    • Cprs Section of the XML File
  • wInsight wizard
    • Performance Data Page of the wInsight Wizard
    • Configuration Security
    • Process Running Page of the wInsight Wizard
    • Work Package Codes Page of the wInsight Wizard
    • Export Structures Page of the wInsight Wizard
    • Procedures
    • Integration Tab of the Application Preferences Dialog Box
    • Miscellaneous Page of the wInsight Wizard
    • Project Page of the wInsight Wizard
    • Export Data from Cobra to wInsight
    • Access Control Page of the wInsight Wizard
    • Save and Run Page of the wInsight Wizard
    • Edit Connection Dialog Box of the wInsight Wizard
    • Project Officer Codes Page of the wInsight Wizard
    • Configuration Page of the wInsight Wizard
    • Configure Calendar Set 19 for IPMR Reports, wInsight Integration, and Cost Data Export/DCDE Format
    • wInsight Database Page of the wInsight Wizard
    • Element of Cost Page of the wInsight Wizard
    • IPMR Format 2 Summary Page of the wInsight Wizard
    • Cost Sets Page of the wInsight Wizard
    • Link Structures Page of the wInsight Wizard
    • New Connection Dialog Box of the wInsight Wizard
    • Confirmation Page of the wInsight Wizard
    • Process Complete Page of the wInsight Wizard
  • work package
    • Milestones/Steps
    • Import File Field Mapper Page of the Integration Wizard
    • Class Settings Page for Actuals Class of the New Class Wizard
    • Rename Work Package Dialog Box
    • Data Access Tab of the Application Preferences Dialog Box
    • Code Files
    • Resource Assignment Percent Complete Dialog Box
    • Filter Page of the Integration Wizard-Scheduling Tools
    • Color Band
    • Progress Page of the Integration Wizard-Scheduling Tools
    • Add Work Package Dialog Box
    • Spread Curves Tab of the Application Preferences Dialog Box
    • Preparing the Primavera Schedule
    • Report Template Format
    • Work Package Name Page of the Replan Wizard
    • Rename a Work Package
    • Settings Page of the New Project Wizard
    • Date Selection Page of the Integration Wizard-MS Project
    • Adding a New Work Package
    • Action Selection Page of the Integration Wizard
    • Resource Assignments Page of the Integration Wizard-Open Plan
    • Copy Work Package Dialog Box
    • Examples of Manual Forecast Calculations
    • Spreadsheet Pane of the Project View
    • Audit Reports
    • Perform Apportionment Mapping
    • Turn On the Opening % Feature When Integrating with Open Plan
    • Progress Techniques
    • Use a Code File in Multiple Projects
    • Save the Contents of the Spreadsheet Pane as an Excel File
    • Work Package Codes Page of the wInsight Wizard
    • Validity Check Process
    • Sub-Totals Page of the Report Wizard
    • Class and Results Page of the Integration Wizard
    • Merge Sub-Projects into a New Project
    • Reporting
    • General Information Page of the New Project Wizard
    • Actual Costs Preferences
    • Deletion Criteria Dialog Box of the Integration Wizard
    • Projects
    • New Filter Expression Dialog Box of the Report Wizard
    • Replan Preferences
    • Project and Apportionment Validations Page of the Validity Check Wizard
    • Integration Configuration Page of the Integration Wizard
    • Progress Page of the Integration Wizard-Files
    • Status Page of the Integration Wizard-Scheduling Tools
    • Date Selection Page of the Integration Wizard-Open Plan
    • Change Control Page of the Integration Wizard
    • General Tab of the Application Preferences Dialog Box
    • Export Structures Page of the wInsight Wizard
    • Calculated Fields
    • The Field Mapper
    • Assign Control Account and Work Package Structures to a Project
    • Files Tab of the Project Properties Dialog Box
    • Statistical Forecasts
    • Field Mapper Page of the Integration Wizard
    • Merge Sub-Projects into a New Project
    • Add a New Work Package using the Dialog Box
    • Project Selection Page of the Update Totals Wizard
    • Status Page of the Integration Wizard-Files
    • Report Categories
    • Recalc Preferences
    • Integration Tab of the Application Preferences Dialog Box
    • Manual Performance Factors Page of the Calculate Forecast Wizard
    • Supported Processes, Operations, and Data
    • Update EAC Dialog Box
    • Select the Level at Which to Capture Actual Costs
    • Schedule Mapping Page of the Integration Wizard-Primavera
    • Prompt Level Page of the Project Audit Wizard
    • Spreadsheet Pane Column Definitions
    • Display the Copy Work Package Dialog Box
    • Resources
    • Examples of Forecast Calculations
    • Apportionment Setup Steps
    • Miscellaneous Page of the wInsight Wizard
    • Resource Assignments Page of the Integration Wizard-Files
    • Display the New Project Wizard
    • Calculate Progress
    • Copy a Work Package
    • General Tab of the Classes Tab
    • Add a Resource Assignment
    • Control Accounts and Work Packages
    • Import File Validation
    • Filter Page of the Integration Wizard-Files
    • Project Selection Page of the Reclass Wizard
    • Notes Page of the Integration Wizard
    • New Calculated Field Dialog Box
    • Master Project Versus Individual Projects
    • How Cobra Calculates Progress to Determine Earned Value
    • Progress Techniques
    • Custom Cost Classes
    • Calculated Field Expression Dialog Box
    • Codes and the Integration Wizard
    • How Cobra Spreads ETC
    • Target Class Page of the Reclass Wizard
    • Integration Configuration Page of the Integration Wizard
    • Data Import Using Scheduling Tools and Files
    • Lookup Dialog Box
    • Sample Earned Value Calculation
    • Integration Configuration Page of the Integration Wizard
    • Preparing the Open Plan Schedule
    • Guidelines for Accurate Earned Value Management
    • Preparing Cobra for Schedule Integration
    • Control Account Fields Versus Codes
    • Calculated Fields Dialog Box
    • Move Work Package Dialog Box
    • Class Settings Page for Earned Class of the New Class Wizard
    • Resource Assignments
    • Forecast Calculations
    • Purge Dialog Box
    • Log Change Comment Dialog Box
    • Reclass Preferences
    • Data Anomaly Validations Page of the Validity Check Wizard
    • Reconcile Milestone Weights
    • Integration Wizard Preferences
    • Criteria Selection Page of the Recalc Wizard
    • Display the Move Work Package Dialog Box
    • Schedule Mapping Page of the Integration Wizard-Open Plan
    • Export Structures Page of the ANSI EIA X12 Wizard
    • Options Page of the Replan Wizard
    • Change Management Tags
    • Data Import-Actual Costs
    • Planning Reports
    • Examples of Statistical Forecast Calculations
    • Fields Dialog Box
    • Earned Preferences
    • Considerations When Creating Field Names
    • Status Page of the Integration Wizard
    • Resources
    • Criteria Page of the Reclass Wizard
    • Project Selection Page of the Top-Down Planning Wizard
    • Advance Calendar Process
    • Filter Page of the Integration Wizard
    • Control Account and Work Package Note Tags
    • Cobra Web Service
    • Display the Rename Work Package Dialog Box
    • Process Lock
    • Milestones/Steps Tab of the Project View
    • Options Page of the Calculate Forecast Wizard
    • Process Logs Dialog Box
    • Select the Level at Which to Capture Actual Costs
    • Notes Tab of the Project View
    • Data Formats
    • Options Page of the Advance Calendar Wizard
    • Column Reports
    • Status File Field Mapper Page of the Integration Wizard
    • Control Account Versus Work Package Level
    • Date Selection Page of the Integration Wizard-Primavera
    • Included Costs Page of the Integration Wizard
    • Manual Forecasts
    • Set Up Projects and Project Baselines
    • Reconcile Milestone Weight Variance Dialog Box
    • Fields Page of the New Project Wizard
  • work package manager
    • Import File Field Mapper Page of the Integration Wizard
    • Criteria Page of the Replan Wizard
    • Schedule Mapping Page of the Integration Wizard-Primavera
    • Criteria Selection Page of the Respread Wizard
    • Criteria Selection Page of the Recalc Wizard
    • Criteria Selection Page of the Update Codes Wizard
    • Schedule Mapping Page of the Integration Wizard-Open Plan
    • General Tab of the Project View
    • Criteria Page of the Reclass Wizard
    • Criteria Selection Page of the Top-Down Planning Wizard
    • Schedule Mapping Page of the Integration Wizard-MS Project
  • xml
    • Analyze Preferences
    • Get Cobra Spread Process
    • Work Package Codes Page of the wInsight Wizard
    • Analyze Options Dialog Box
    • Report Parameters
    • Status Page of the Integration Wizard-Scheduling Tools
    • Export Structures Page of the wInsight Wizard
    • Calendars Section of the XML File
    • EarnedValues Section of the XML File
    • Integration Tab of the Application Preferences Dialog Box
    • Miscellaneous Page of the wInsight Wizard
    • Hook Program Methods
    • Create Project from Template Process
    • New Connection Dialog Box of the Integration Wizard-MS Project
    • Structures Section of the XML File
    • XML Configuration File
    • Results Tab of the Resource File Properties Dialog Box
    • Units Section of the XML File
    • wInsight Database Page of the wInsight Wizard
    • Element of Cost Page of the wInsight Wizard
    • Additional Project Files
    • XML Configuration Object Interface
    • Process Log Viewer
    • Edit Connection Dialog Box of the Integration Wizard-MS Project
    • Manpowers Section of the XML File
  • xml sections
    • ElemLinks Section of the XML File
    • FutureEtcs Section of the XML File
    • Contractors Section of the XML File
    • Calendars Section of the XML File
    • Contracts Section of the XML File
    • EarnedValues Section of the XML File
    • NarrElemPers Section of the XML File
    • Structures Section of the XML File
    • Sections of the XML File
    • Units Section of the XML File
    • Elements Section of the XML File
    • CalendarDets Section of the XML File
    • ACL Section of the XML File
    • Periods Section of the XML File
    • Manpowers Section of the XML File
    • Cprs Section of the XML File
    • wInsight DTD
  • xml sections
  • zero out data
    • Project Selection Page of the Zero-Out Data Wizard
    • Procedures
    • Set Resource Values to Zero
    • Process Complete Page of the Zero-Out Data Wizard
    • Options Page of the Zero-Out Data Wizard
    • Confirmation Page of the Zero-Out Data Wizard
    • Criteria Selection Page of the Zero-Out Data Wizard
    • Zero-Out Data Wizard
    • Zero-Out Data
    • Date Range Page of the Zero-Out Data Wizard
  • zero out data wizard
    • Classes Page of the Zero-Out Data Wizard
    • Project Selection Page of the Zero-Out Data Wizard
    • Procedures
    • Set Resource Values to Zero
    • Process Complete Page of the Zero-Out Data Wizard
    • Options Page of the Zero-Out Data Wizard
    • Confirmation Page of the Zero-Out Data Wizard
    • Criteria Selection Page of the Zero-Out Data Wizard
    • Zero-Out Data Wizard
    • Zero-Out Data
    • Date Range Page of the Zero-Out Data Wizard
    • Process Running Page of the Zero-Out Data Wizard
  • zip
Glossary
  • ACO
  • Active Element
  • Activity
  • Actuals
  • ACWP
  • Alias
  • American National Standards Institute/Electronic Industries Association Standard 748
  • Apportioned Effort
  • ASC
  • Authorized Un-priced Work
  • Authorized Work
  • BAC
  • Base
  • Baseline
  • Baseline Dates
  • BCWP
  • BCWS
  • Bill of Material
  • BOP
  • Breakdown Structure
  • Budget
  • Budget Element (BE)
  • Budget Unit
  • Burden
  • C/SSR
  • CA
  • CACO
  • Calculated Field
  • Calculated Filter
  • Calendar
  • CAM
  • CBB
  • CBS
  • CFSR
  • Chart Item
  • Chart Window
  • Classes
  • Closed
  • Code Files
  • Codes
  • Column Header
  • Column Sizer
  • COM
  • Commitment
  • Compound Filter
  • Constraint
  • Contract Budget Base
  • Contract Data Requirements List
  • Contract Line Item Number
  • Contract Target Cost
  • Contract Target Price
  • Control Account
  • Control Concepts
  • Cost/Schedule Control System Criteria
  • Cost/Schedule Planning and Control Specifications
  • Cost Account
  • Cost Control System
  • Cost Reporting Set
  • Cost Set
  • Cost Variance
  • CPI
  • CPR
  • Critical Path
  • Critical Path Analysis
  • CSV Exception
  • CV
  • CV%
  • CWBS
  • DAB
  • Data Set
  • Data Source
  • DCAA
  • DCMA
  • Direct Cost
  • DoD
  • DTD
  • EAC (Estimate at Completion)
  • Early Dates
  • Earned Value
  • EDI
  • Element Filter
  • Elements
  • Element Separator
  • EOC
  • EOP
  • EQP
  • ESAR
  • Estimate Dates
  • ETC (Estimate to Complete)
  • EV
  • EVM
  • EVMIG
  • EVMS
  • EVT
  • Field Name
  • Filter
  • Filter Group
  • Filter Item
  • Focus Rectangle (wInsight)
  • Forecast
  • Forecast Dates
  • Front Loading
  • FY
  • G&A
  • GANDA
  • Gantt Chart
  • HTML
  • IBR
  • Indirect Costs
  • In Progress
  • Interactive Filter
  • Internal Replanning
  • IPD
  • IPT
  • Jet (Database)
  • JIG
  • Labor Rate Variance
  • LAN
  • Late Dates
  • Latest Revised Estimate At Completion (LRE)
  • Level of Effort (LOE)
  • Management Chart
  • Management Reserve (MR)
  • Menu Bar
  • Milestone
  • MR
  • MS
  • NASA
  • Negotiated Contract Cost
  • Network Schedule
  • OBS (Organizational Breakdown Structure)
  • ODBC
  • OLE
  • OMB
  • OPD
  • Open
  • OPP
  • OSD
  • OTB (Over Target Baseline)
  • P3
  • PCO
  • Pending Dates
  • Performance Measurement Baseline (PMB)
  • Performing Organization
  • PF
  • Planned
  • Planned Value
  • PMJEG
  • PMR
  • PMT
  • PP
  • Price Variance
  • Prime (dollars)
  • Project
  • RAM
  • Range Filter
  • RBS (Resource Breakdown Structure)
  • Re-planning
  • Reprogramming
  • Resource
  • Result
  • Result Code
  • RFP
  • Rollup
  • Row Header
  • RTF
  • Rubber Baselining
  • SAR
  • Schedule
  • Scheduled Dates
  • Schedule Performance Index
  • Schedule Variance
  • Segment Separator
  • SMS
  • SPI
  • Standard EAC Formula
  • SV
  • SV%
  • TAB
  • TC
  • TCPI-BAC
  • TCPI-EAC
  • Toggle Field
  • Toolbar
  • Tool Tip
  • Transfer File
  • UB
  • UserVACTr
  • VAC
  • VAC%
  • VACTr
  • VAN
  • VAR
  • WBS (Work Breakdown Structure)
  • Wildcard Filter
  • Window Pane Sizer
  • Workspace
  • WP (Work Package)
Search Results
No search has been performed.

Create a Forecast

Use this procedure to create a project forecast.

To create a forecast:

  1. Set up classes.
  2. Set up preferences.
  3. Copy the budget to the forecast.
Parent Topic: Procedures
How to...
Calculate Forecast
Learn more about...
Forecast Preferences
Calculate Forecast Process
  • Copyright © Deltek Inc. All rights reserved.

  • Powered by Suite Solutions